Requests Addl Info Re Intergranular Stress Corrosion Cracking in Recirculation Sys & RHR Sys Piping.Info Required by 830817 to Assure Resolution Prior to OL Issuance
ML20024D395
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/27/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Pollock M
LONG ISLAND LIGHTING CO.
References
NUDOCS 8308040707
Download: ML20024D395 (4)


Text

>

o.

A y

_ DISTRIBUTION :

e Documenticontroli(501322)n NRC PDR WVJohnston EE E

L PDR DGEisenhut NSIC PRC LB#2 Rdg.

Docket No. 50-322 EHylton RCaruso BBordenick, OELD ACRS (16)

Mr. M. S. Pollock ELJordan, DEQA:IE Vice President - Nuclear JMTaylor, DRP:IE Long Island Light Company Region I, LBettenhausen 175 East Old Country Road RLPerch llicksville, New York 11801 JZwolenski GHolahan

Dear itr. Pollock:

FMiraglia

SUBJECT:

INTERGRANULAR STRESS CORROSION CRACKING IN RECIRCULATION SYSTEH AND RESIDUAL HEAT REl10 VAL SYSTEM PIPING

Reference:

LILCo Letter dated July 7,1982 regarding Induction lieating Stress Improvement Program The Comission has recently been briefed on the results of inspections and tests conducted on BWR recirculation system and residual heat removal system piping.

Based upon these discussions, the NRC has concluded that it is important to obtain additional information regarding the susceptibility of the system piping at your facility to intergranular stress corrosion cracking (IGSCC).

You should be aware that as a result of inspections conducted at 18 operating Boiling Water Reactors (BWRs) in conformance to recent IE Bulletins (IE Bulletin No. 82-03, Revision 1, " Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants," and IE Bulletin No. 83-02, " Stress Corrosion Cracking in Large-Diameter Stainless Steel kecirculation System Piping at BWR Plants"), extensive IGSCC in large-dianeter recirculation and residual heat removal system piping has been discovered.

These bulletins requested licensees to perform a number of actions to include inspections and, where necessary, repairs, analysis and/or additional surveillance conditions for pipe welds.

The NRC has concluded that other BWR facilities with non-conforning (service sensitive per NUREG-0313, Rev.1) materials may be susceptible to IGSCC, which may be unacceptable for continued safe operation without stress mitigation, augmented inservice inspection, repair of the affected pipes and additional surveillance requirements. The Comission is therefore considering actions relating to the need for the mitigation of stresses, replacement of susceptible piping and augmented inservice inspection.

For facilities which have recently received their operating license and near-term operating license facilities. the Comission is requesting information to determine a tuture course of action in order to minimize or mitigate IGSCC and to ascertain whether or not licenses shall be modified.

Therefore, we are requesting that you provide the information identified below.

g *eia7 M @

-co

.-a a

~ ~ ~ ~ ~ ~. ~.

~ ~ ~ ~ ~ ~ ~ ~

~..- ~~

~~

onre y OFFICIAL RECORD COPY usomesi-moa nne ronu ais 0o-e03 nacu 024c

i l

1.

Identify the materials used and special fabrication methods employed (both in the shop and in the field) to minimize or mitigate IGSCC in piping systems which form the reactor coolant pressure boundary.

For non-conforming materials describe, by piping systems, the actions taken or planned and methods utilized (e.g., solution annealing, your induction heat stress improvement program, etc.) to mitigate potential IGSCC in the reactor coolant pressure boundary.

2.

Provide a justification for operation with non-conforming materials in the reactor coolant pressure boundary, if applicable.

3.

Describe what preservice inspections have been accomplished which would serve as the baseline for further identification of IGSCC.

4.

Describe what prograns are to be implemented in water chemistry control to minimize or mitigate IGSCC.

Upon receipt of the information requested above, we would like to arrange a meeting to discuss your submittal. The schedule for the meeting will be arranged by the flRC Project fianager for your facility.

Your response to this letter is needed by August 17, 1983 to assure resolution prior to the issuance of an operating license.

Thank you for your cooperation regarding this very important issue.

Sincerely, Original signed by Jarro110.Elaeeut Darrell G. Eisenhut, Director Division of Licensing cc:

See next page b

07/senhut Q/83A b

<.m S

, arm AD/tfCE/

D/ DE 4

LB Cd).

/

D/L in$..........

..../.....

...I

...M.ji omce>

ira ia WJohnston P

.. dm.. AS..,c...e.n..ce r

. TN.....

..61aha..j

.R..C..,., 3.3,,,

l tumus >

7

. 0,7.

/g3,,

..?/,,,,,/,8..,,. 0,7/s /p3..

0,?/M83 07/), 2 83 07G,h./83,,

. 0, /

one) i Nac FORM 318 (10-80) N9CM 0243 OFFiClAL RECORD COPY usam mi_meco

,Shoreham lir. M. S. Pollock Vice President - Nuclear Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 cc:

Howard L. Blau, Esquire MHB Technical Associates Blau and Cohn, PC.

1723 Hamilton Avenue, Suite K 217 Newbridge Road San Jose, California 95125 Hicksville, New York 11801 Stephen Latham, Esquire Mr. Jay Dunkleberger Twomey, Latham & Shea New York State Energy Office Post Office Box 398 Agency Building 2 33 West Second Street Empire State Plaza Riverhead, New York 11901 Albany, New York 12223 Jonathan D. Feinberg, Esquire Energy Research Group, Inc.

New York State 400-1 Totten Pond Road Dept. of Public Service.

Waltham, Massachusetts 02154 Three Empire State Plaza Albany, New York 12223 Mr. Jeff Smith Shoreham Nuclear Power Station Ezra 1. Bialik, Esquire Post Office Box 618 Assistant Attorney General Wading River, New York 11792 Environmental Protection Bureau New York State Department of Law W. Taylor Reveley, III, Esquire 2 World Trade Center Hunton & Williams New York, New York 10047 Post Office Box 1535 Richmond, Virginia 23212 Resident Inspector Shoreham NPS, U.S. NRC Ralph Shapiro, Esquire Post Office Box B Cammer & Shapiro Rocky Point, New York 11778 9 East 40th Street New York, New York 10016 Herbert H. Brown, Esquire Kirkpatrick, Lockhart, Hill, Mr. Brian McCaffrey Christopher & Phillips l

Long Island Lighting Company 1900 M Street, N.W.

175 E. Old Country Road Washington, D.C.

20036 i

Hicksville, New York 11801 Lawrence Coe Lanpher, Esquire Honorable Peter Cohalan Kirkpatrick, Lockhart, Hill, Suffolk County Executive Christopher & Phillips County Executive / Legislative Bldg.

1900 M Street, N.W.

Veteran's 'iemorial Highway Washington, D.C.

20036 l

Hauppauge, New York 11788 Karla J. Letsche, Esquire David Gilmartin, Esquire Kirkpatrick, Lockhart, Hill, Suffolk County Attorney Christopher & Phillips County Executive / Legislative Bldg.

1900 M Street, N.W.

Veteran's Memorial Highway Washington, D.C.

20036 Hauppauge, New York 11788 l

Shoreham James B. Dougherty, Esq.

3045 Porter Street.

Washington, D. C.

20008 Mr. James Rivello Plant Manager Shoreham Nuclear Power Station P. O. Box 628 Wading River, New York 11792-Lawrence Brenner, Esq.

Administrative Judge Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. James L. Carpenter

~

Administrative Judge

' Atomic Safety & Licensing Board 4

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. Peter A. Morris Administrative Judge Atomic Safety & Licensing Board U. S. t!uclear Regulatory Commission Washington, D. C.

20555-ehe m e

i

..