Forwards IE Insp Rept 50-213/83-18 on 830620-24 & Notice of Violation
ML20024D309
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/21/1983
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20024D310 List:
References
NUDOCS 8308040523
Download: ML20024D309 (2)


See also: IR 05000213/1983018

Text

1

.

.

.

JUL 21198)

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 83-18

This refers to the routine inspection conducted by Mr. J. J. Kottan of this

office on June 20-24, 1983 at Haddam Neck Plant, Haddam Neck, Connecticut of

activities authorized by NRC Li' cense No. DPR-61 and to the discussions of our

findings held by Mr. Kottan with Mr. R. Graves and others of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and used by

the inspector to make certain independent measurements. The basic purpose of

these independent measurements is to verify your capability for analyzing

radioactive effluents, and to achieve and maintain comparable methods of

analyses between your facility and the NRC. The complete data from these

measurements will be reported in a subsequent Inspection Report.

t'

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the NRC Enforcement policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated

March 9, 1982. You are required to respond to this letter and in preparing

your response, you should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10-day period which you"

,;

believe necessary, should be made to the Supervisor, Files, Mail and Records,

NJ-

USNRC Region I, at (215) 337-5223.

O

t!

(v

0FFICIAL RECORD COPY

)I

9308040523 830721

/ lI

DR ADOCK 05000213

PDR

-,, _

- ,-

._

.

.

.

l I933

Connecticut Yankee Atomic Power Company 2

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

/

'

1

b

i

&

Thomas T. Martin, Director &

Division of Engineering and

Technical Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report Number 03-18

cc w/encis:

R. Graves, Plant Superintendent

Manager of Quality Assurance

~

R. T. Laudenat, Manager, Generation Facilities Licensing

J. F. Opeka, Vice President, Nuclear Operations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/encls:

P,egion I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

DPRP Section Chief

/

[ pf

RI:D h &

RI:DETP

RI:DETP

P:

T

Kot<;an/cgl

Ta lor

f4

ak

e lam

Martin

-

'

h7

/ /83

7

/83

7/

83

7///83

7///83

0FFICIAL RECORD COPY

,