ML20024D079

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/83-20 & 50-374/83-19 on 830518-0614.No Noncompliance Noted
ML20024D079
Person / Time
Site: LaSalle  
Issue date: 07/15/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20024D080 List:
References
NUDOCS 8308030136
Download: ML20024D079 (2)


See also: IR 05000373/1983020

Text

.

_-.

.,

.

,

.

.

_,

D/YtB

_,.

'

..

4

- .

5

-

'JUC 1 51983

Docket No. 50-373

-Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

'

Post Office Box 767~

Chicago,'IL 60690

Gentlemen

This refers to the routine safety inspection conducted by Messrs. A. L. Madison

and W. G. Guldemand of this office on May 18 through June 14, 1983, of activi-

ties at LaSalle County Station, Units 1 and 2, authorized by NRC Operating

License No. NPF-11 and NRC Construction Permit No. CPPR-100 and to the discus-

sion of our findings with Mr. G. J. Diederich at the conclusion of the inspec-

tion.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

\\

No iters of noncompliance with NRC requirements were identified during the

course of-this inspection.

!

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written-

application to withhold information contained therein within thirty days of

the date'of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear'from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

l

inspection report will be placed in the Public Document Room.

i

.

f

i

8300030136 030715

"

$DRADOCK05000

pg

,

.

_

-

.. -

-.

.-

.

.- -

.

.

.----.

_

-

.

t

'

.

.

' Commonwealth Edison Company

2

'JUL 1 5 503

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Projects Branch 2

Enclosure:

Inspection Reports

No. 50-373/83-20(DPRP);

No. 50-374/83-19(DPRP)

cc w/ encl:

D. L. Farrar,. Director

of Nuclear Licensing

'

D. L. Shamblin, Site

' Construction Superintendent

T. E. Quaka, Quality

Assurance Superintendent

G. J. Diederich, Station

Superintendent

R. H. .Holyoak, Project Manager

. DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

.

f

RIII

RIII

II

h.hl/lQ

h'h

Madisoh/db

Walker

r

07/12/83

s2rn(

.

-

-

..

_

.

.- . .

-. .

-.

-

.-

..