ML20024C967

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/83-11 on 830426-0520.No Noncompliance Noted
ML20024C967
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1983
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20024C968 List:
References
NUDOCS 8307210240
Download: ML20024C967 (2)


See also: IR 05000302/1983011

Text

.

/LA

Clb

'

v

.

.

.

. -

,.

-

JUL 01 1983

,

Florida Power Corporation

ATTN: Mr. W.- S. Wilgus

Vice President Nuclear Operations

_

P. O. Box 14042, M.A.C. H-2

-

St. Petersburg, FL 33733

Gentlemen:

SUBJECT: REPORT N0. 50-302/83-11

This refers to the routine safety inspection conducted by Mr. T. Stetka of th'is

'

office on April 26 - May 20, 1983, of activities authorized by NRC License

No. DPR-72 for the Crystal River Unit 3 facility and to the discussion of our

findings held with Mr. E. Howard and other members of your staff at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection ' report. Within these areas, the inspection consisted of_

selective examinations of procedures and representative records, interviews with

.

personnel, and observations by the inspector.

.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Three new unresolved items resulted from this inspection'and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless~you notify this office, by ,

~

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirenants

of10CFR2.790(b)(1).

Should you have any questions concerning this letter, we'will be glad to discuss

them with you.'

Sincerely,

u

e

,

e

'H.'C. Dance, Chief

Project Branch 2

Division of Project and

'

,

Resident Programs

.

Enclosure:

- q

'

Inspection Report No. 50-302/83-11'

"'

,

cc:

(Seepage 2)

_

,-

s

8307210240 830701

PDR ADOCK 05000302

'

_G

_

PDR

1

er

..

s

._

-

-

T Eot

,

.

1

&

'

i

-

u

.-

,

.

-

-

,

4

.

.

-

.

-

.i l.I I' 0 1 1983

'

Florida Power Corporation

2

'

cc w/ encl:

G. R. Westafer, Manager

Nuclear Licensing and

Fuel Management

E. M. Howard, Director,

Site Nuclear Operations

bec w/ encl:

NRC Resident Inspector.

Document Management Branch

-State of Florida

4

.RII

RIl

II

RII

TStetka: caw-

anciera

J gge.

HC h

]///83

y///83.

6/ /83'

'6/g/83

1;-

<

.

.

.