ML20024C199
| ML20024C199 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/22/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, SD-413-83-07, SD-413-83-7, NUDOCS 8307120398 | |
| Download: ML20024C199 (1) | |
Text
i Dung @cksEDOhrh-gy P/0i. HOK (K31 tid UllAMIMrTE, N.C. 2(1242 IIAL II. TI!CKEH TELEPHONE gg,g3g 1Q. gg m amoa, Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region Il 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Unit 1 Docket No. 50-413 f
Dear Mr. O'Reilly:
In the Corrective Action section of Significant Deficiency Report SD 413/83-07, dated May 13, 1983, it was stated that the vent installation error would be corrected by June 1983 or after completion of the Reactor Coolant System Cold Hydro. The Reactor Coolant System Cold Hydro has been completed and the vent installation error is now scheduled to be corrected by July 1, 1983.
Very truly yours, fb.
fh Hal B. Tucker RWO/php cc: Director INPO Records Center Office of Inspection and Enforcement Suite 1500 U. S. Nuclear Regulatory Commission 1100 Circle 75 Parkway Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. P. K. Van Doorn Mr. Robert Guild, Esq.
NRC Resident Inspector
. Attorney-at-Law Catawba Nuclear Station P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 213515 Devine Street Columbia, South Carolina 29205 OFFICIAL COPVj
$f D-%
8307120398 30622 PDR ADOCK 05000413
/
S 8 PDR