Forwards QA Program Insp Rept 99900349/83-01 on 830510-13 & Notice of Nonconformance
ML20024C040
Person / Time
Issue date: 06/13/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Allen
CORNER & LADA CO., INC.
Shared Package
ML20024C041 List:
References
REF-QA-99900349 NUDOCS 8307120201
Download: ML20024C040 (3)


Text

r:

s 7

JUN 131983

~

L

. Docket.No.

99900349/83-01' I

u.

~

Corner.and Lada Company, -Inc.

~

ATTN:

Mr.' W. - T. - Allen, ' III j,

Manager;' Quality Assurance 1341 Elmwood Avenue Cranston', Rhode': Island 02910

" Gentlemen:

This refers to.the QA program inspection conducted by Mr. R. E. Oller_of this office on May 10-13,-1983, of your facility at Cranston, Rhode Island, associated with the fabrication of component supports and to the discussions

[

of our findings with you and members of the plant staff at the conclusion of the inspection.

This inspection was made to confirm that in the areas inspected your QA program is being effectively. implemented.

The inspection effort is'not designed to l

' assure that unique quality requirements imposed by a customer are being l-

. achieved nor to assure that'a specific product, component, or service provided by you-to your customers'is of acceptable quality.

As you know, the NRC i.

requires each of.its licensees to assume full responsibility for the quality of specific products, components, or services procured from others.

You should, i.

..therefore,-not conclude that the NRC's inspection exempts you from inspections l

by an NRC licensee or his agents, nor from taking effective corrective action l

in response to-their findings.

\\-

Areas examined and our. findings are discussed in the enclosed report. Within.

these areas, the inspection consisted of an examination of procedures and l

. representative. records, interviews with personnel, and observations by the

~

i inspector.

During the inspection, it was found that the implementation of your QA program failed to meet certain NRC requirements.

The specific findings and references 4

to the pertinent requirements are identified in the enclosures to this letter.

l h

'Please provide us within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken'to prevent recurrence; and (3) the date your corrective actions and preventive measures were or will be completed.

Considaration may be given to

" extending your response time for good cause shown.

RIV BC:VPh R& CPS SC: R& CPS D:D RE011er/ mas.

IBarnes Ufotapovs RLBa Wg t 4 //c/83 6 //c/83 b/ (783 g./g/83 M

[,

8307120201 830613 I

PDR GA999 EMVCORL 99900349 PDR

f 0

a Corner and Lada Company, Inc. The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will La placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, w e t s3 m d 805 U. POTAPCIS**

Uldis Potapovs, Chief Vendor Program Branch

Enclosures:

1.

Appendix A - Notice of Nonconformance 2.

Appendix B - Inspection Report No. 99900349/83-01 3.

Appendix C - Inspection Data Sheets (7 pages)

- a Corner and Lada Company, Inc. bec:

JTCollins, RIV RLBangart, RIV JEGagliardo, RIV EHJohnson, RIV MIS Section (J. Perry)

VPB Branch Chief VPB Section Chiefs VPB Inspector DMB-IE:09 ASME NBB&PVI