Public Version of Rev 1 to Emergency Plan Implementing Procedure EPIP 300-12, Initiation of Environ Monitoring Activities by Rad/Chem Director. Receipt Form Encl
ML20024A576
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/11/1983
From: Scott D
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20024A575 List:
References
81-264, EPIP-300-12, NUDOCS 8306210357
Download: ML20024A576 (19)


Text

_

~

DAP S2 Revisi:n 12

~

DRESDEN STATION PROCEDURE ROUTING (TRANSMITTAL RECEIPT) ter No.

Regis&llb S~u-Q f D-M))

OO-S

  • REMOVE:

OOb' l I

INSERT:

c)

(Sign and return this form to the Procedures Manager.)

I hereby acknowledge receipt of the above.

I 1

Signed Date I

l' FORM S2A (Cont'd.)

APPROVED s,

O N4Y II '83 L

83o621o357 83o6o6 24 of 32 D.O.S.R poR e oca osoooono F

PDR

l DAP S2 Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION

/

Procedure d/

300 ~-[2.

R ev. No.

Description of Procedure Revision or of New Procedure,

[M M Gin 6 WLP TW I n ce (PC trt2%

IV1 0 s. M O T' lor}

J

--8e u,ud w

G7, - /, mv Justification for New or Revised Procedure

_[ ]

~^Tb uodare caoahi(;nas a-P

_.. _..d/_ _e h e m.__

R o.

i

,i e

O( ee c, m e-D <A e, na a (3S s1P.

J J

Supportive References (Letters, Temporary ' Change Requests, Procedure lnquiry,

' NUREG, etc.)

F Ru S2s

.v APP"^VED N,W 11 '83 2s of 32 D.O.S.R.

1

!f.

EPIP 300 EMERGENCY MEASURES e

300-1 Initial Notifications and GSEP Responses (Primary Responsibility - Station Director)

Rev. 4 3/83 300-C1 Nuclear Accident Reporting System Form Rev. 2 5/81 (Primary Responsibility - Station Director) 300-T1 -

Table,of Conditions Requiring Post-Accident Lineup of the High Radiation Sampling System and Use of Post-Accident Sampling Procedures

  • Rev. 0 5/82 300-2 On-Going Emergency Communications-Rev. 1 3/81 (Primary Responsibili,ty - Station Director) 300-3 Assembly and Evacuation of Personnel Rev. 2

'4/82 (Primary Responsibility - Operations Director) _ _ _

300-4 Emergency Dose Limits and Radiological Controls._ Rev. 0 7/80 for Rescue and Recovery Operations (Primary Responsibility - Rad / Chem Director) 300-5 Emergency Treatment of Injured Personnel (Primary Responsibility - Operations Director) _

_Rev. 2 5/81

-300 Survey of Injured Personnel Rev.U 7/80 (Primary Responsibility - Rad / Chem Director)

.x T

( d *300-7 Personnel Decontamhation (Medical -

- Rev. I 1/83 - - - -

Decontamination Area) (Primary ' Responsibility

- Rad / Chem Director) 300-8 Post-Accident Sampling of Primary Containment Rev. 2 -

5/82 --

Atmosphere (Primary Responsibility - Rad / Chem Director) 300-9 Post-Accident Sampling of Reactor Coolant

- - Rav. 3- --

10/82 (Primary Responsibility - Rad / Chem Director)

O l

300-10 Post-Accident Sampling and Release Rate Rev. 2 11/82 Determination of Radiciodices and Particulates ---

(Primary Responsibility - Rad / Chem Director) 300-11 Post-Accident Noble Gas Release Rate Determina-clon (Primary Responsibility - Rad / Chem Director) Rev. 2 12/82 300-12 Initiation of Environmental Monitoring Activities Rev. 1 5/83 by the Rad / Chem Director l-

- (Primary Responsibility - Rad / Chem Director)

- 300-13 Rad./ Chem. Technicians Action at Hospital Rev. 0 7/80 l

(Primary Responsibility - Rad / Chem. Director) v 1

..$Q2;;NMM{ ~-~

1 of 2 MAY 111983'

.. __. a M

~

EPIP 300 EMERGENCY MEASURES (Cont'd) 300-14 Estimation of Off-Site Dose From an Unplanned Rev. 1 12/82 Release of Radioactive Effluents (Primary Responsibility - Rad / Chem Director) 300-15 Deploymen' of the Eber11ne SAM-2 Stabilized Rev. 1 3/81 Assay Meter (Primary Responsibility - Rad / Chem Director)

Q v

MAY111983 1

EPIP 300-12 Revision 1 May 1983 INITIATION OF ENVIRONMENTAL MONITORING ACTIVITIES BY THE RAD./ CHEM. DIRECTOR

,m A.

PURPOSE The purpose of this procedure is to describe actions by the Rad./ Chem.

Director for initiation of environmental monitoring efforts and coordination of Environs Group activities until such duties are assumed by a designated Environs Director.

B.

REFERENCES 1.

Generic GSEP Tables 4.2-8 Rad / Chem Director 4.3-5 Environmental Director 4.4-1 Environs ~ Director 4.4 Environs Group.

2.

EG-1 Coordination of Environs group act,1vities by the Environs Director.

3.

EG'-14 Radioanalytical analysis at the EOF.

4.

EG-18 Airborne Iodine-131 measurement at the EOF.

C.

PREREQUISITES

()

The Environs Group under. supervision of the Rad./ Chem. or Environs Directors will consist-of qualified individuals from Commonwealth Edison and contractors designated to assist the group. Typically, outside contractors will consist of the Radiological Monitoring Contractor, the Meteorological Monitoring Contractor and other Special Environmental Contractor personiel.

D.

PRECAUTIONS In the event that radiation levels at or beyond the site boundary are suspected to be significantly elevated, personnel performing radiation surveys will require dosimetry such as film badges and pocket dosimeters to ascertain their accumulated radiation exposure.

E.

LIMITATIONS AND ACTIONS 1.

At the discretion of the Station Director or Rad./ Chem. Director, an Environs Group may be activated-during GSEP conditions involving a Hazardous material (including Radiological) accident suspected of affecting areas'outside of the plant facility.

APPROVED NAy11 a 1 of 14

0. 0. S. R.

=- --

________J

EPIP 300-12 Revision 1 2.

Initiation of environmental sampling activities and direction

~'s of the Environs Group will be performed by the Rad./ Chem.

j Director until the Environs Director has been notified and assumes his duties.

3.

If radiation levels at the site boundary are significantly elevated, initial emphasis will be placed upon determination of off-site radiation levels and identification of areas requiring controlled access and/or evacuation.

4.

Emergency dose limits a.

For life saying actions:

75 Rem whole body 200 Rem extremities No limit thyroid b.

For less urgent actions:

25 Rem whole body 100 Rem extremities 125 Rem thyroid F.

PROCEDURE 1.

Establish a team for initiating surveys of areas outside of the Station.which are experiencing or are threatened by a Hazardous material (including Radiological) accident. This team should be dispatched to monitor confirmed releases and verify that no unmonitored releases are occurring.

2.

The Rad./ Chem. or Environs Director will direct the environmental monitoring personnel to perform the following actions as deemed i

necessary:

a.

Obtain fran the Control Room or Meteorological Tower inform-ation as to Wind Speed and Direction. Attachment A and Figure I will aid in the evaluation of downwind areas potentially affected by a release.

c b.

Dispatch teams in such a manner that they approach a suspected plume or release point from the upwind direction while continuously monitoring radiological conditions. Minimal equipment for these personnel should include air samplers and C.P.'s.

c.

Provide, if possible, alternate routes to enter and exit affected sectors in anticipation of changi weather hPROVED condi tions.

4 VM 11 '33 D. O. S. R.

2 of 14

EPIP 300-12 Revision 1 d.

Position teams as early as practical in potentially affected sectors that may require extended travel times to reach, such as opposite sides of rivers and lakes.

e.

Establish air sampling equipment in the downwind direction in areas which are already being monitored by existing Fixed Environmental Monitoring Stations.

(See Figure 1 for suggested air sample locations.)

f-If airborne releases have not yet occurred, collect reference samples of grass and soil at or near the periphery of the station.

Documen.t.the sampling. locations.

3.

As the Environs Group is activated and monitoring efforts are expanded, obtain.the following information as deemed appropriate:

(See Attachment B and Figure 2.)

a.

Off-site milk, airborne, surface and water contamination levels.

(1) Air, Land and Vegetation Monitoring.

~

(a) Obtain and replace particulate and iodine samples from the Fixed Environmental Monitoring a

Stations.

Initial emphasis will be in downwind areas. Locations of Dresden Environs Stations are given in Attachment B.

Grab samples for particulates and fodines will be taken at 1

~

selected locations.

Forward these samples to Dresden Station or to a laboratory designated by the Environs Director for analytical counting.

(b) Obtain soil and sludge samples and forward to Dresden or to a laboratory designated by the Environs Director.

(c) Obtain samples of crops and foodstuffs from the affected areas and forward to Dresden or to a laboratory designated by the Environs Director.-

(2) Water Monitoring.

In the event that water monitoring is required, the Envir'ons Group will assist the U.S. NRC and the Illinois Department of Nuclear Safety as follows:

(a) The total activity released to the river and/or ground will be estimated as quickly as possible.

APPROVED NW I 1 '83 3 of 14 D. O. S. R.

EP!P 300-12 Revision 1 (b) Control measures will be made at Peoria and other public water intakes as required, and the Illinois Department of Nuclear Safety will be advised of l

such actions.

(c) Water sampling stations will be established as neces-sary on the Illinois River. The Coast Guard will lend assistance in collecting off-shore water samples.

(d)

In the case of a ground spill, soil, potable water and ground water samples will be taken in the surrounding area, if possible.

(e) Assistance will be provided to the State and the NR,C in the collection and analysis of samples.

j (3) Milk Monitoring.

As required, the Environs Group will assist the Illinois Department of Nuclear Safety in monitoring the local milk l

supply as follows:

(a) Milk sampling stations will be established in affected pastures and milk samples from these stations will be analyzed for 1-131.

(b) Stations showing significant levels of 1-131 will also be sampled for Sr-89, Sr-90 and Cs-137.

.3 (c) Milk samples from upwind quadrants will be spot checked for 1-131.

(d) Cattle feed and pastures grazing grass samples in affected pastures will be sampled, b.

Off-site dose equivalent rates using monit'oring instrumentation.

c.

TLD's from the Fixed Environmental Monitoring Stations for the purpose of detennining integrated radiation exposures at locations described in Attachment B.

d.

Updated Wind Speed, Direction and Temperature Differential infonnation fra the Meteorological Tower located west of the 345 XV Yard (requires a key).

e.

Control room indication of Wind Speed, Direction and 150 ft. -

35 ft. Temperature Differential located on the 0-1 Back Panel.

f.

Control room effluent monitor indications.

g.

On-site Enviror.s Station ARM readings.

APPRovgg

% 1 1 '83 s

4 D. O. S. R.

et

EPIP 300-12 Revision 1 4.

Establish communications with the Corporate Command Center Environmental Of rector.

5.

Keep the Station Director and the Corporate Command Center Environmental Director infonned as to the progress of the surveys and other activi' ties of the Environs Group organization.

6.

Request, as necessary, through the Environmental Director:

a.

Assistance for road blocks and security until State personnel are available.

b.

Canmunications equi' ment as nece'ssary. Telephones, mobile -

p radios and portable radios may be required.

c.

Required tra'nsportation for personnel.

d.

Sufficient Technical and Non-Technicai personnel to expand the operation as necessary. Existing sources of technical infonnation and support include:

~

(1) Eberline Instrument Co. - Rad. Monitoring Contractor.

(2) Murray + Trettel - Meteorological Contractor.

(3) Radiological Assistance Team - DOE Chicago Operations Office.

(?,-)

(4) Radiation Management Corp.

(5)

Illinois Dept. of Nuclear Safety.

(6) Corps of Engineers.

(7)

G.E. Morris Operation.

(8) Quad Cities Nuclear Power Plant (309) 654-2241.

(9) Zion Nuclear Power Plant (312) 746-2084.

0 (10) Edison Technical Center (312) 531-5000.

l l

l I

i s

APPROVED V

NAY 11 '83 5 of 14 D. O. S. R.

l r

-e-n-M w.

-m

EPIP 300-12 Revision 1 ATTACHMENT A Wind Direction Data Wind From Wind Toward and Sectors Affected (Degrees)

(Degrees) b 1.

N 349 - -

S 169-191 - - - - -

HJK 2.

NNE 12 - -

SSW 192-213 - - - - -

JKL 3.

NE 34 - -

SW 214-236 - - - - -

KLM 4.

ENE 57 - -

WSW 237-258 - - - - -

LMN 5.

E 79-101 W

259-281 - - - - -

MNP 6.

ESE 102-123 WNW 282-303 -

NPQ 7.

SE 124-146 NW 304-326 - - - - -

PQR 8.

SSE 147-168 NNW 327-348 - - - - -

QRA 9.

S 169-191 N

349-11 RAB

10. ' SSW 192-213 ABC NNE 12-33
11. SW 214-236 NE 34-56 BCD ENE

,v 57-78

12. WSW 237-258 CDE
13. W 259-281 E

79-101 - - - - -

DEF

14. WNW 282-303 ESE 102-123 - - - - -

EFG

~

15. NW 304-326 SE 124-146 - - - - -

FGH

16. NNW 327-348 SSE 147-168 - - - - -

GHJ f

w i

APPROVED 6 of 14 C). C). S. f?,

)

______________________1__n:___

_____________________u

j f_,, %_

l'<1 f U lt l.

l Hnarsl,0n Envi...nmental Honi.loring Stations J-"

s.

i i

,.,C.;'

- {I

.1

,, -C-

~: 7.-~J...-

N.._

l & M Cana1 N

',.s In

,. - ~...

\\

1 i

$ ,o

~ ~...

5':.'~.L. $ gY

..9,'

%,' f

. m )\\

n

-S-

~....

a i

ggg

>s a.....

< /<

-m

-~~~'s.,

9

./

K i

, s #r

\\

\\

C y.

/

8

\\,.

~4 j

9:

/

/

EI2 I

,! *.. a.I

})

/

~

,,I

\\

.:.. i y z

o 1-Jos

! [

l O hl

. i 4: -

sQ

.t fi%.

' A e

3 g

'Nt i /,............._.--

r ogic "I

T=

3,

[...,~. l, I

_... i q ' iK l."., ~..

f f\\/

'Q

\\

-- y 4.

g

-- j.,s,

f,I

~.

/

O g@

1

\\

' ~,

G4 O

%)

O

.:.ES3 {

{D s

<j

    • ( _
  • ollint.

/y e

.n.

\\

... e 30 0

s g

'Q css j

s.

. m_ y..

1 {.

a k.. i.

c:.

I

g i;

d

\\

y, s-i i suis initi e sin i t

,r win f

-u F l xcel Environmental Honitoring Station (a l r s amp l e8rs),

5 4

ES 4

  • ngges teel Areas in wl.ich to Obtain Addit lonal Ai r Sample s

EPIP 300-12 Revision 1 ATTACHMENT B - SURVEILLANCE STATIONS q

A.

The following is a list of the Dresden Station Surveillance Stations and types of samples collected at these stations.

Type of Sample 5 5 m

g g

g r

5 3

& W s

k U E 5 "$

y y f j Station No.

Name a

< r u. x m u o r 2 i

D-01 On-site Station 1 Behind house at Dam)

X X

D-02 On-site Station 2 Behind Station).

X X

D-03 On-site Station 3 In-coming Road)

X X

D-04 Collins Road X

X D-05 Bennitt Fann X

X D-06 Pheasant Trail X

X D-07 Clay Products (In-coming Road)

X X

D-08 Prairie Park X

X D-09 Coal City X

X D-10 Goose Lake Village X

X D-11 Morris X

X

~-

( ).

0-12 Lisbon X

X

~

~~

D-13 Minooka X

X D-14 Channahon X

X D-15 Joliet Brandon Road X

X j

D-16 Elwood X

X D-17 Wilmington X

X D-18 Inlet Canal i

X D-19-1 Discharge Canal X

D-20-2/3 Discharge Canal X

D-21 Illinois River at EJ&E RR Bridge jX D-22 Illinois River at Morris (Morris Water Works) jX D-23 Thorsen Well - GE t

X D-24 Yunker Fann X

D Dorin Farm X

D-26 Mather Fann X

D-27 Dresden Lock & Dam X

D-28 Dresden Pool of Illinois River D-29 Sanitary' Lagoon - GE

~

X X

D-30 Evaporator Pond - GE.

X D-31 Goose Lake Corp. of Eng. - GE X!

D-32 L. A.W. Well - GE X

D-33 Pond West of MFRP X

gppa0VED 8 of 14 l@l 11 D.O.S R-

l

~

EPIP 300-12 Revision 1 l

i B.

AERIAL DISTANCE AND DIRECTION OF ENVIRONMENTAL SURVEILLANCE STATIONS FROM DRESDEN STATION h

1.

Air Samplers.

l Location Distance (miles)

Direction (o) a.

On-site Station #1 0.6 300 b.

On'-site Station #2 0.3 50 c.

On-site Station #3 0.4 180 d.

Collins Road 0.9 260 e.

Bennitt Farm 0.9 60 f.

Pheasant Trail 0.9 140 2.0 180 g.

Clay Products h.

Prairie Park 4.0 230 1.

Coal.Ci ty 7.5 190 j.

Goose Lake Village 3.8 210 k.

Morris 8.0 250 l.

Lisbon 10.0 310 m.

Minooka 4.5 5

n.

Channahon 3.5 40 o.

Joliet 12.5 60 p.

Elwood 8.0 80 q.

Wilmington 8.0 130 2.

TLD.

m Same as 1.

3.

Milk.

Location Distance Direction a.

Davidson Farm 6

10 b.

Mather Farm 16 40 c.

Yunker Farm approx. 5 approx. 315 4.

Fish.

Location Distance Direction Dresden Lock & Dam 0.5 270 APPRoygg a

l 9 of 14 W II 'a3 D. O.S. R.

l

EPIP 300-12 Rtvision 1 5.

Surface Water.

Location Distance Di rection m

3 Illinois River 1

270 at EJ & E RR Bridge 6.

Cooling Water Sample.

~ '

Location Distance

, Direction T

s a.

Inlet Unit 1 At Station b.

Discharge (1) Unit i At Station (2) Unit 2/3 s

7.

Sediment.

Location Distance

[

Direction Dresden Lock and Dam 0.5 -

270 h,

i J

..h..

N s

~\\

N-q j

1 i

i 4

q' s

s 5

4 i

APPRoygg.

.,MN13.g3 10 of 14 L

e

{

1.[D. O,3, g, 1

u

\\.['

'~

g x_

s, J

l

~

(

EPIP 300-12 R1 vision 1 C.

Detailed instructions for locating the Air Particulate Stations i

are given below.

m 1.

.ON-SITE INDICATOR STATIONS

.a.

D On-site Station #1 - Northwest -

Turn right off of Collins Road just past GE Midwest s

Facility at Corps of Engineers sign.

Follow this road to the dam.

Station is in the fenced area behind the first house on the right.

b.

0 On-site Station #2 - Northeast -

Station is located approximately 100 yards east of the sewage treatment plant.

c.

D On-site Station #3 - South -

Station is located approximately % mile south of the gatehouse, next to the silver emergency trailer.

i' d.

D Collins Road - Southwest -

1 From the plant, turn west on Collins Road. Go past GE Midwest Facility to access road on the right just before the road leading to the dam. Station is in p)

U the fenced area behind shed.

2.

OFF-SITE INDICATOR STATI0fiS

(

'L.

a.

D Clay Products - South -

s Statfon is approximately 2-miles south of the plant on the west side of the road.

s r

3 ;

N b.

D Bennitt Farm,- flortheast -

l Turn south off of I-80 at the Minooka Exit onto l

Ridge Road. Follow Ridge Road to Hansel Road.

l Turn left on Hansel Road for 0.9 miles to Bennitt Road. Turn sosth on Bennitt Road for 1.0 mile te the fannhouse. Station is 150 feet east of the house in the field.,

?

x

.c-APPROVED s

s 11 of 14 s'

NW 1113 t

s Tp

~

gq 's 4 D. O. S. R.

s 1

s 'r hx-.

[ Y

ff' EP!P 300-12 Revision 1

.i D Prairie Park - Southwest -

i c..

m From the plant, turn west on Lorenzo Road and go to

/

Jugtown Rcad. Turn north on Jugtown Road. Station

~~

is approximately k mile from Lorenzo Road on the wast side.

d.

D Pheasant Trail - Southeast -

Fran the plant, turn east on Lorenzo Road to Will County Road. Turn north and ge to Pheasant Trail

/

Road. Turn. west and go to thvend of the road.

Station is located in the poder*line. corridor.

/

3.

CFF-SITE BACKGROUND STATIONS e

a.

D Coal City - South -

In Coal City, go on Broadway, past.the Santa Fe tracks to Chestnut Street.. Turn right on Chestr.ut and go to the substation on the left. Monitoring j

station is in the substation.

b.

0 Goose Lake Village - Southwest Fran the plant, turn west on Lorenzo Road and go to Goese' Leke Road. (Immediately east of Drake's t'-

Fann Restaarant).

Turn couth of Goose Lake Road.

)

Station is approximately 100 feet south from s,

Lorenzo Road.

f c.

0 Morris - Wast -

Cross bridge to Morris on Illinois 47. Turn west at Jefferson Street and go to Nettle Street. Turn north for k mile to the gravel alley on the west side. Station is in the substation at the end of the gravel road.

d.

D Lisbon - Northwest -

Go north on Illinois 47 for about 8-h miles past Morris to where the highway angles northwest.

Turn sharply south and go to substation J24 on the west side of the road.

i e.

D Minooka - North -

t Go south from I-80 on Ridge Road, '(Minooka Exit), to the first stop sign, (County Road). Turn east and go mile to the center of town. Turn south and go two blocks. Station is in the substation on the left.

APPROVED s

12 of 14 MAY 11 '83 D.O.S. R.

  1. ~

= -

fa

EPIP 300-12 Revision 1 f.

D Channahon - Northeast -

Go west on Route 6 from I-55 to Channahon. Turn south (lef t) on Center Street. Station is about 1 block south on the west side of the street.

g.

D Joliet - Brandon Road -

Take Illinois 6 east from I-55.

Turn south on Brandon Road. Station is on the east side of Brandon Road, about 1-k miles from Illinois 6.

h.

D Elwood - East -

From Lorenzo Road and I-55, go north to the first exit (Wilmington exit). Go southeast to Route 53.

Turn north (left) on Route 53 and go to Elwood.

Turn left on St. Louis Street and go to Spencer Street. Turn left on Spencer Street. Station is in the substation on the right.

1.

D Wilmington - Southeast -

From Lorenzo Road and I-35, go north to the first Turn south (gton exit).

exit (Wilmin Go southeast to Route 53.

right) on Route 53 and go into Wilmington.

Station is in the substation just past the river bridge on the right hand side.

's

(

4.

Figure 2 shows approximate locations of Air Particulate,and TLD Stations.

APPROVED ley 11 '83 13 of 14 D.O. S. R.

e

--r-

EPIP 300-12 8tavision I w.

r0,.,

iL t-i! T s

p.Q r

=Q. -. 1 2

c

.3.s am 3'

Nickr..

.e %...q e

o

'e d'

KQ Dit' i$n n

i nk er,r g

1 u.i

.s n 2 g

..o i.

+

s m

s c.

3,-

~

< n-8 q..

rs 3

mi e

]!

a I

1 1.

I O

f w

=

t

<e.<

v

\\

a a

3 we C

2 (m L t

i 3_+=

3 g

a

=

m.

D 0

m

~

^

~

APPROVED NAY 11 '83

~ n m

o 3!

E

=

E Q> 0.S.R.

1

-w 14 of 14 (FINA5.)

4 "e

E C

D p

=

e C

C g

.har C

  • C4 3

e E

t=

0 b.

O 9

,O

_4 J

e e

-g.

=

  • E C

O.

W C) are n

.aur '

C we C

1 o

~

.T_

g D

e o

c vs

=

6 Op

,4 w

c g-

=

a w

e

=

.,a

.,=g c

o o

o h, f, f',

=

=

=

=

=

3 w

G O

O w

w w"

w w

9 w

4 w

9

,o w

M O

se

.c

~

m

~

a n

~

t=.

==

l

N Commonwealth Edison O ) Dresden Nuclear Power Station

) C1R. C1 3

(

/ Morris. It:Inolo 60450 L/ -Telephone 815/942 2920

(

Date May 16, 1983 1

DJS LTPt 81-264 l

Mr. Harold R. Denton, Director.

Office of Nuclear Reactor Regulation j

U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Emergency Plan Implementing Procedures for Dresden Station Units 1, 2, and 3; NRC Docket Nos. 50-10, 50-237, and 50-249

References:

(a) D. J. Scott letter to H. R. Denton, dated March 12, 1981 (b) Title 10, code of Federal Regulations, Appendix E, i

Part V

Dear Mr. Denton:

Enclosed are ten (10) copies of revisions to Dresden Station Emergency Plan Implementing Procedures.

No return of transmittals is.necessary.

Sincerely, 1

O D.

. Scott Station Superintendent Dresden Nuclear Power Station