Forwards IE Insp Repts 50-295/83-04 & 50-304/83-04 on 830305-0429 & Notice of Violation
ML20023D981
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/19/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20023D982 List:
References
NUDOCS 8306060218
Download: ML20023D981 (2)


See also: IR 05000295/1983004

Text

.

' M>

hl718

.

May 19, 1983

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. R. Waters,

P. L. Hartmann and F. R. Dunaway of this office on March 5 through April 29,

1983, of activities at Zion Nuclear Power Station authorized by NRC Operating

License No. DPR-39 and No. DPR-48 and to the discussion of our findings with

K. L. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear from you in this regard withia_

the specified periods noted above, a copy of this letter, the enclosure (s)','and

your response to this letter will be placed in the Public Document Room.

B306060218 830519

PDR ADOCK 05000295

JEd /

G

PDR

4

_

-

_ . _ ,

_

.

_

_.

_ - _-_

.

!

'

.

2

>

Commonwealth Edison Company

May 19,1983

Fe will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

,,

6

. .

[ 'j

k

,

. \\, \\', . ' , <.

_s

,

- i -. .

g ,

i

W. D. Shafer, Chief

.h';

\\

'

Projects Branch 2

'

$ 1

s

g

ii

Enclosures:

'\\

.f*j

'

1.

Appendix, Notice

'f,

'

of Violation

2.

Inspection Reports

g

.No. 50-295/83-04(DPRP)

t

"

,

,j

and No. 50-304/83-04(DPRP)

';

.

' s, \\

i

n

!

cc w/encls:

-

D. L. Farrar, Director

,

of Nuclear Licensing

,,

i

K. L. Graesser, Station

'

' ,

Superintendent

'a

DMB/ Document Control Desk (RIDS)

e

Resident Inspector, RIII

,

,,

!

Philip L. Willman, Esq.

w-

Assistant Attorney General

Environmental Control Division

i

Reed Neuman, Esq., Assistant

Attorney General

,

l

Mayor John B. Spencer

'

City of Zion

,

N

>

4

..

1

_.7

't

>

f

4

RI I

RIII

i

&

idih[a er

oyd/sv

05/18/83

5%

i

. . _ .

.

.

.

.

_

. .

.

. .

_

.