ML20023C652
| ML20023C652 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/18/1983 |
| From: | Scarano R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20023C653 | List: |
| References | |
| RTR-NUREG-0660, RTR-NUREG-660 NUDOCS 8305170515 | |
| Download: ML20023C652 (2) | |
See also: IR 05000361/1983014
Text
_--
- - _ . = -
[
Katt
&
UNITED STATES
[
g
NUCLEAR REGULATORY COMMISSION
g
- j
REGION V
Q,
g
1450 MARIA LANE,sulTE 210
%
,d
WALNUT CREE K. CALIFORNI A 94596
APR 1 G 1983
Docket Nos. 50-361, 50-362
.
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, California 91770
.
Attention:
Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject:
NRC Inspection - San Onofre Units 2 and 3
This refers to the routine inspection conducted by Mr. G. P. Yuhas of this
office on March 21-30, 1983, of activities authorized by hPC License
Nos. NPF-10, NPF-15 and to the discussion of our findings held by Mr. Yubas
with Mr. P. Knapp and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
!
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
l
.,
l
8305170515 830418
i
PDR ADOCK 05000361
G
l
_-
-
_
. . .
- . . - -
-
. . -
- -
. -
. -
- _ _
--
-
.
.
Southern California Edison Company
-2-
APR 1819fC.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by tae Paperwork Reduction Act of 1980, PL 96-511.
Sincerely,
/s/
R. A. Scarano, Director
Division of Radiological Safety and
Safeguards Program
Enclosures:
A.
B.
Inspection Report
Nos. 50-361/83-14
50-362/83-14
cc w/o enc 1:
R. Dietch, SCE
H. B. Ray, (San Clemente)
bec: RSB/ Document Control Desk (RIDS)
Distributed by RV:
JBM
State of California
A. Johnson
Resident Inspector
Project Inspector
R\\
.M
.-/
G. u
- dh
F.Wenslawski
H. Rook
R . Sca ra no
A. Johnson
4/19 /83
4/ F/ /83
4/ltL /83 4/j[/83
4/ly/83