| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20023C541 | List: |
| References | |
| NUDOCS 8305170417 | |
| Download: ML20023C540 (2) | |
See also: IR 05000361/1983013
Text
-
qne:g
[pf
jo
UNITED STATES
g
g
NUCLEAR REGULATORY COMMISSION
g
- j
REGION V
(s
g
1450 MARIA LANE. Sulf E 210
g
,d
WALNUT CREE K, CALIFORNIA 94596
- ...*
APR 141983
Docket Nos. 50-361
50-362
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay, Vice President
,
Advanced Engineering
Gentlemen:
_.
Subject:
Special NRC Inspection at San Onofre Units 2 and 3
This refers to the special inspection, conducted by Messrs. D. M. Sternberg,
D. F. Kirsch, H. L. Canter, A. E. Chaffee, and L. F. Miller of this office
during the period of March 12-25, 1983, of activities authorized by NRC
License Nos. NPF-10 and NPF-15, and to the discussion of our findings held
with Messrs. R. Dietch and H. B. Ray and other members of the Southern
California Edison staff at the conclusion of the inspection.
The inspection was an examination of the circumstances and events applicable
to the failure of certain reactor trip breakers to trip on deenergization of
the undervoltage coils. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
..
8305170417 830414
PDR ADOCK 05000361
0
[2 l
-
-
-
-
-
.
.
.
.
e
'
.
Southern California Edison Company
-2-
4g
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Sincerely,
/3!
T. W. Bishop, Chief
Reactor Projects Branch No. 2
Enclosures:
A.
B.
Inspection Report
Nos. 50-361/83-13
50-362/83-12
cc w/ enc 1:
R. Dietch, Vice President
Nuclear Engineering and Operations
H. B. Ray, (San Clemente)
bec: RSB/ Document Control Desk (RIDS)
)
Distributed by RV:
'
JBM
State of California
A. Johnson
Resident Inspector
Project Inspector
RV JVX
hty'
[JVy
iI
D. Kirsch:dh wA.Chaffee
pp/L.MiIler gl. Canter D.Stebberg
4/ y /83 4/
/83
4/ /J /83
4/ /JL/83
4/ /J. /83
t
.. .
._-_
.
-- _ _
. .
-
_-
--..
_ . - . , _ _ -
. . - _ .
. - - .