Forwards IE Insp Repts 50-361/83-13 & 50-362/83-12 on 830312-25 & Notice of Violation
ML20023C540
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/14/1983
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20023C541 List:
References
NUDOCS 8305170417
Download: ML20023C540 (2)


See also: IR 05000361/1983013

Text

-

qne:g

[pf

jo

UNITED STATES

g

g

NUCLEAR REGULATORY COMMISSION

g

j

REGION V

(s

g

1450 MARIA LANE. Sulf E 210

g

,d

WALNUT CREE K, CALIFORNIA 94596

  • ...*

APR 141983

Docket Nos. 50-361

50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay, Vice President

,

Advanced Engineering

Gentlemen:

_.

Subject:

Special NRC Inspection at San Onofre Units 2 and 3

This refers to the special inspection, conducted by Messrs. D. M. Sternberg,

D. F. Kirsch, H. L. Canter, A. E. Chaffee, and L. F. Miller of this office

during the period of March 12-25, 1983, of activities authorized by NRC

License Nos. NPF-10 and NPF-15, and to the discussion of our findings held

with Messrs. R. Dietch and H. B. Ray and other members of the Southern

California Edison staff at the conclusion of the inspection.

The inspection was an examination of the circumstances and events applicable

to the failure of certain reactor trip breakers to trip on deenergization of

the undervoltage coils. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

..

8305170417 830414

PDR ADOCK 05000361

0

PDR

[2 l

-

-

-

-

-

.

.

.

.

e

'

.

Southern California Edison Company

-2-

4g

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

/3!

T. W. Bishop, Chief

Reactor Projects Branch No. 2

Enclosures:

A.

Notice of Violation

B.

Inspection Report

Nos. 50-361/83-13

50-362/83-12

cc w/ enc 1:

R. Dietch, Vice President

Nuclear Engineering and Operations

H. B. Ray, (San Clemente)

bec: RSB/ Document Control Desk (RIDS)

)

Distributed by RV:

'

JBM

State of California

A. Johnson

Resident Inspector

Project Inspector

RV JVX

hty'

[JVy

iI

D. Kirsch:dh wA.Chaffee

pp/L.MiIler gl. Canter D.Stebberg

4/ y /83 4/

/83

4/ /J /83

4/ /JL/83

4/ /J. /83

t

.. .

._-_

.

-- _ _

. .

-

_-

--..

_ . - . , _ _ -

. . - _ .

. - - .