Text
9/@
.
.
.
April 27, 1983
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
P. C. Lovendale and D. E. Miller of this office on March 11, 14-17, and
22-23, and April 7, 1983, of activities at Zion Nuclear Power Station,
Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and No.
DPR-48 and to the discussion of our findings with Mr. Plim1 and others
of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix A.
A written response is required.
Certain other activities, set forth in Appendix B to this letter, appear to
be a deviation from commitments which you have made in previous correspondence
with the Commission.
Please advise us in writing within thirty days of the
date of this letter of the corrective action you have taken or plan to take,
'
showing the estimated date of completion with regard to this deviation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC Public Document Room unless you notify this office,
l
by telephone, within ten days of the date of this letter and submit written
l
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the re-
quirements of 2.790(b)(1).
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
8305170337 830427
PDR ADOOK 05000295
G
JK cQ
'
.
.
2
Commonwealth Edison Company
April 27, 1983
Thb responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ip
. l
. } j A 4t
'
C.
Pap riello, Chief
Radiological Safety Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Appendix B, Notice
of Deviation
3.
Inspection Report
No. 50-295/83-07(DRMS);
No. 50-304/83-06(DRMS)
cc w/encls:
D. L. Farrar, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Philip L. Willman, Esq.
Assistant Attorney General
Environmental Control Division
Reed Neuman, Esq., Assistant
Attorney General
Mayor John B. Spencer
City of Zion
RII
RII
RI
RIII
RII
=
-
W
'
{e
JQ
'
Love dale /jp
Mi er
ger
er
llo
'
4/23/83
$W