APPENDIX A NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-295 Docket No. 50-304 As a result of the inspection conducted on March 11, 14-17, and 23-24, and April 7, 1983, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified:
Technical Specification 6.2.B states that radiation control procedures shall be maintained, made available to all station personnel and adhered to.
a.
Procedure ZRP 1470-4, " Decontamination of Personnel," requires documenta-tion of all personal contamination surveys in which internal contamina-tion is suspected or a major portion of the body is involved.
Contrary to the above, on March 1, 1983, personal contamination surveys of transfer canal workers who exhibited nasal contamination were not documented.
b.
Procedure ZRP 1310-11, " Air Sampling and Posting of Suspected and Known Radioactive Airborne Areas," requires that air samples be collected in close proximity of the workers to ensure that a representativ: sample is obtained.
Contrary to the above, on March 1 and 2, 1984, no air samples were collected in the transfer canal before or during performance of work.
c.
Procedure ZRP 1310-11, " Air Sampling and Posting of Suspected and Known Radioactive Airborne Areas," requires that all air samples be counted l
for gross beta and gross alpha.
Contrary to the above, during the current Unit 2 refueling outage, job specific air samples collected by the contracted technicians have not l
been counted for gross beta and gross alpha.
l l
This is a Severity Level IV violation (Supplement IV).
i 8305170344 830427 DR ADOCK 05000295 PDR
Appendix A 2
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:
(1) cor-rective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
Dated C. J. Paperiello, Chief Emergency Preparedness and Radiological Safety Branch l