ML20023C435

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/83-12 & 50-323/83-09 on 830306-0402.No Noncompliance Noted
ML20023C435
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/08/1983
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20023C436 List:
References
NUDOCS 8305170332
Download: ML20023C435 (2)


See also: IR 05000275/1983012

Text

_

.

.

nn

n sqn7

nrn

u n000

Docket Nos.

50-275

50-323

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

Attention:

Mr. Philip A. Crane Jr.

Assistant General Counsel

Gentlemen:

This refers to the routine, monthly inspection, conducted by Messrs. J.D.

Carlson and M. M. Mendonca of this office during the period of March 6, 1983

through April 2,1983, of activities authorized by NRC License No.DPR-76 and

Construction Permit No. CPPR-69, and to the discussions of our findings

held with Mr. Thornberry and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold inform:stion contained herein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

[

i

Kir%

RV g

%g

Carlson/ dot ygf endonca

M

sch

Bishop

gg4/f/83

4///83

4/6/83

4/ /83

8305170332 830408

PDR ADOCK 05000275

- '{';

G

PDR

,' -

-

--

_

_

.__ ._ .

.-

i

.

l

Pacific Gas and Electric Company

-2-

APR

81983

Should you have any questions about this inspection, we will be glad to

discuss them with you.

i

Sinceraly,

.L -

T. W. Bishop, Chief

Reactor Projects Branch No. 2

Enclosure:

NRC Inspection Report

Nos. 50-275/83-12

50-323/83-09

cc w/o enclosure:

J. L.Schuyler, PG&E

J. D. Shiffer, PG&E

W. S. Raymond, PG&E

cc w/ enclosure:

R. C. Thornberry, PG&E (Diablo Canyon)

bec: RSB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA

Resident Inspector

JBM

Sandra Silver (Report)

.

--,

a

s.v-

-

e

,,-n

,

y-,m-

, --

v~

r

~, ,,

- - - , - - - < ~ -

- - -

,-w-

,-

-e

rm---

.