ML20023C071
| ML20023C071 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/04/1983 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | William Cahill GULF STATES UTILITIES CO. |
| References | |
| NUDOCS 8305090602 | |
| Download: ML20023C071 (3) | |
Text
m ew,;qro
. il s:
DISTRIBUTION:
yay 4 1983 Document Contre,1 (50-458);
NRC PDR L PDR NSIC PRC Docket Nos. 50-458/459 LB#2 Rdg.
EHylton EJWeinkam DRepka, OELD ACRS (16)
ELJordan, DEQA:IE Mr. William J. Cahill, Jr.
JMTaylor, DRP:IE Senior Vice President Region IV, RA River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker
Dear Mr. Cahill:
Subject:
Turbine Maintenance Program Enclosed is the staff position regarding turbine maintenance. A commit-ment from you to meet the enclosed staff position is required to classify the turbine missile issue as confirmatory.
If you have any questions concerning this topic, please contact NRC Project Manager, Edward Weinkam.
Sincerely, gei r/F.cd L7 A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page
@305090602 830504 PDR ADDCK 05000450 A
PDR Y
llW th(tvlL#hC0a Yevnlt-No kt US nt.:dg/e.n...m../ b.c..
~
omc.,
suRm. >
.g.W.e.1.4.e.a.:.kw. AS c.h e,n,c e,r,
. 5L!.tl.83....
St...l83 om>
NRC FORM 318 (10-80) NRCM Cao OFFICIAL RECORD COPY usa m mi_.us.m
River Send Mr. William J. Cahill, Jr.
Senior Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J.E. Booker cc:
Troy B. Conr.er, Jr., Esquire Doris Falkenheiner, Esq.
Conner and Wetterhahn Attorney at Law 1747 Pennsylvania Avenue, N. W.
355 Napoleon Street Washington, D. C.
20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.
Ian Douglas Lindsey Director - Nuclear Licensing Staff Attorney Gulf States Utilities Company Department of Justice Post Office Box 2951 7434 Perkins Road Beaumont, Texas 77704 Suite C Baton Rouge, Louisiana 70808 Stanley Plettman, Esquire Orgain, Bell and Tucker H. Anne Piet.tinger Beaumont Savings Building 712 Carol Marie Drive Beaumont, Texas 77701 Baton Rouge, Louisiana 70806 William J. Guste, Jr., Esquire Ms. Linda B. Watkins Louisiana Attorney General Attorney at Law 7434 Perkins Road 355 Napoleon Street Baton Rouge, Louisiana 70808 Baton Rouge, Louisiana 70802 Richard M. Troy, Jr., Esquire Assistant Attorney General in Charge State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana 70112 Ross Brown Resident Inspector Post Office Box 1051 St. Francisville, Louisiana 70775 Gretchen R. Rothschild Louisianians for Safe Energy, Inc.
1659 Glenmore Avenue Baton Rouge, Louisiana 70808 James W. Pierce, Jr., Esq.
P. O. Box 23571 Baton Rouge, Louisiana 70893
-4 f.,
ENCLOSURE TURBINE MAINTENANCE COMMITMENT FOR THE RIVER BEND TURBINE MISSILE ISSUE We have reviewed the River Bend facility with regard to the turbine missile issue and conclude that the probability of unacceptable damage to safety-related systems and components due to turbine missiles is acceptably low (i.e., less than 10" per year) provided that the turbine missile
-5 generation probability is maintained to be 10 per reactor year or less for the life of the plant by an acceptable maintenance program.
In reaching this conclusion, the staff has factored into consideration the unfavorable nrientation of the turbine generator.
The staff considers the turbine missile issue as a confirmatory item if the applicant agrees to:
a) submit for NRC approval, within three years of obtaining an operating
~
license, a tu'rbine system maintenance program based on the manu-facturer's calculations of missile generation probabilities, or b) volumetrically inspect all low pressure turbine rotors at the second refueling outage and every other (alternate) refueling outage thereafter until a maintenance program is approved by the staff, and c) conduct turbine steam valve maintenance, (following initiation of power output) in accordance with present NnC recommendations as stated in SRP Section 10.2 of NUREG-0800.
_