ML20023A875
| ML20023A875 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 09/24/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20023A871 | List: |
| References | |
| NUDOCS 8211010005 | |
| Download: ML20023A875 (4) | |
Text
,
No UNITED STATES h
r y,
NUCLEAR REGULATORY COMMISSION g
,g WASHINGTON, D. C. 20555 COMMONWEALTH EDIS0N COMPANY DOCKET NO. 50-295 ZION STATION UNIT 1 AMENDMENT TO FACILITY OPERATING' LICENSE Amendment No. 76 License No. DPR-39 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated September 23, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
1 i
8211010005 820924 PDR ADOCK 05000295 i_
P PDR
k l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license -
amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-39 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 76, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
F THE NUCL AR REGULATORY COMMISSION
/
'a g e
/ Operating Reactor Ekanch#1 Division of Licen i
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 24, 1982
)..
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 76 TO FACILITY OPEPATING LICENSE N0. DPR-39 DOCKET NO. 50-295 i
Revise Appendix A as follows:
Remove Page Insert Page 165 165 l
l
- -..... - ~.
~.
..-3...~.._
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 3.8.1 4.8.1.A 1
and the discharge pressuio'is within +10% of a point on the pump heat curve.
2.
The centrifugal charging pump system power operated valves shall be stroked manually from the control room each month.
Performance will.be acceptable if valve motion is indicated upon actuation.
B.
The two centrifugal charging pump B.
Not Applicable systems shall be operable whenever the reactor is in hot standby or operating except as specified in 3.8.1.C.
~
C.
From and after the date that one of C.
When it is determined that one of the two centrifugal charging pump the two centrifugal charging. pump systems is made or found to be in-systems is inoperable, the rema~1n-operable for any reason, reactor ing centrifugal charging pump system, operation including recovery from both residual heat removal pump an inadvertent trip is permissible systems, and both safety injection only during the succeeding 7 days pump tystems, including the associated provided that during those 7 days str.ndby AC and DC power supplies the remaining centrifugal charging (see sections 4.15.1.B.2 and pump system is operable and both 4.15.1.E.1) shall be demonstrated residual heat removal pump systems to be operable.immediately and and both safety injection pump daily t,hereafter.
systems are operable.*
D.
If these conditions cannot be met D.
Not Applicable the reactor shall b.e brought to the
,gy' Unit 1 during the. period of 1440 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.4792e-4 months <br />, Sep'tember 26 througd hot shutdown condition within four hours.
After a maximum of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 1440 hours, September 29, 1982, reactor operation is allowed in the hot shutdown condition, if with the 1B charging pump inoperable, provided that the 1A charging pump system is operating, and both safety injection
~
r et r s al be br gh to e cold o
a shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
165
/mendment No. 76 ~