ND-20-0003, (Vegp), Unit 3 - Schedule Date for Initial Loading of Fuel

From kanterella
(Redirected from ML20013F991)
Jump to navigation Jump to search
(Vegp), Unit 3 - Schedule Date for Initial Loading of Fuel
ML20013F991
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/13/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0003
Download: ML20013F991 (3)


Text

^Southern NucIear Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro. GA 30830 Vogtle 3 & 4 706-848-6459 January 13, 2020 Docket No.: 52-025 10 CFR 52.103(a)

ND-20-0003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant(VEGP)- Unit 3 Schedule Date for Initial Loading of Fuel Ladies and Gentlemen:

Pursuant to 10 CFR 52.103(a), Southern Nuclear Operating Company (SNC), the licensee for Vogtle Electric Generating Plant (VEGP) Unit 3 Combined License (COL) Number NPF-91, is hereby notifying the U.S. Nuclear Regulatory Commission (NRC) of the scheduled date for initial loading of fuel at VEGP Unit 3 on November 23, 2020. SNC is submitting this notice in parallel with the Notice of Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) to support publication of the notice of intended operation 285 days prior to scheduled fuel load.

SNC respectfully requests that the notice of intended operation be published in the Federal Register in accordance with 10 CFR 52.103(a).

Updates to the scheduled date for initial loading of fuel will be made every 30 days in accordance with the 10 CFR 52.103(a) and VEGP Unit 3 COL condition 2.D.(11).

This letter contains no regulatory commitments. This letter has been reviewed and confirmed to not contain security-related information.

Should you have questions regarding this information, please contact me at 706-848-6459.

Respectfully submitted.

Michael J. Yox Regulatory Affairs irector Vogtle 3 & 4 MJY/KJD/sfr

U.S. Nuclear Regulatory Commission ND-20-0003 Page 2 of 3 cc:

Southern Nuclear Operating Company/ Georgia Power Company Mr. 8. E. Kuczynski Mr. P. P. Sena III Mr. M. D. Meier Mr. D. H. Jones Mr. G. Chick Mr. M. Page Mr. D. L. McKinney Mr. T. W. Yelverton Mr. B. H. Whitley Ms. C. A. Gayheart Ms. M. Ronnlund Mr. D. L. Fulton Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. S. Agee Mr. M. Humphrey Ms. A. C. Chamberlain Mr. S. Leighty Mr. N. Kellenberger Mr. E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Document Services RTYPE; VND.LI.LOO File AR.01.02.06 Nuclear Reaulatorv Commission Mr. W. Jones Mr. M. King Mr. C. Patel Mr. C. Santos Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. C. J. Even Mr. A. Lerch Mr. S. Walker Mr. N.D. Karlovich Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Ms. K. P. Carrington Mr. M. Webb Mr. P.J. Heher

U.S. Nuclear Regulatory Commission ND-20-0003 Page 3 of 3 State of Georgia Mr. R. Dunn Oalethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani Mr. T. Rubenstein Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8.W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham