MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability ML20217A5911999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics ML20212J7431999-09-30030 September 1999 Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel ML20212K7651999-09-29029 September 1999 Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation ML20212D5771999-09-15015 September 1999 Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl ML20211Q6451999-09-0808 September 1999 Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam ML20211Q4171999-09-0606 September 1999 Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump ML20211K5261999-08-31031 August 1999 Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted ML20211F6941999-08-27027 August 1999 Provides Individual Exam Results for Applicants That Took Initial License Exam in July & August of 1999.Completed ES-501-2,copy of Each Individual License,Ol Exam Rept, ES-303-1,ES-303-2 & ES-401-8 Encl.Without Encl NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months ML20211E8791999-08-24024 August 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Point Beach Nuclear Power Plant,Units 1 & 2.Licensees Provided Requested Info & Responses Required by GL 96-01 ML20211F1501999-08-24024 August 1999 Submits Summary of Meeting Held on 990729,in Region III Office with Util Re Proposed Revs to Plant Emergency Action Level Criteria Used in Classifying Emergencies & Results of Recent Improvement Initiatives in Emergency Preparedness 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached ML20210L9141999-08-0404 August 1999 Informs That Versions of Info Re WCAP-14787,submitted in 990622 Application for Amend,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210K5221999-08-0404 August 1999 Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 ML20210G6011999-07-30030 July 1999 Discusses 990415 Complaint OSHA Received from Employee of Wisconsin Electric Power Co Alleging That Employee Received Lower Performance Appraisal for 1998 Because Employee Raised Safety Concerns While Performing Duties at Point Beach NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal ML20210H0211999-07-28028 July 1999 Forwards Insp Repts 50-266/99-09 & 50-301/99-09 on 990528-0713.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210G2441999-07-26026 July 1999 Discusses 990714 Meeting with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 ML20209H5471999-07-14014 July 1999 Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20196J4161999-06-30030 June 1999 Discusses Relief Requests Submitted by Wisconsin Electric on 980930 for Pump & Valve Inservice Testing Program,Rev 5. Safety Evaluation Authorizing Relief Requests VRR-01,VRR-02, PRR-01 & ROJ-16 Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions ML20196D4931999-06-18018 June 1999 Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good ML20195J9471999-06-16016 June 1999 Discusses Ltr from NRC ,re Arrangements Made to Finalized Initial Licensed Operator Exam to Be Administered at Point Beach Nuclear Plant During Week of 990726 ML20196A2931999-06-16016 June 1999 Ack Receipt of Transmitting Changes to Listed Sections of Point Beach Nuclear Plant Security Plan & ISFSI Security Plan,Submitted IAW 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness ML20195J9251999-06-14014 June 1999 Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 ML20206T3691999-05-17017 May 1999 Ltr Contract,Task Order 242 Entitled, Review Point Beach 1 & 2 Conversion of Current TS for Electrical Power Systems to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20206N5561999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Point Beach Npp.Organization Chart Encl ML20206P2551999-05-12012 May 1999 Forwards Handout Provided to NRC by Wisconsin Electric at 990504 Meeting Which Discussed Several Recent Operational Issues & Results of Recent Improvement Initiatives in Engineering ML20206N5331999-05-12012 May 1999 Forwards RAI Re & Suppl by Oral Presentation During 980604 Meeting,Requesting Amend for Plant,Units 1 & 2 to Revise TSs 15.3.12 & 15.4.11 ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure ML20206K0391999-05-0707 May 1999 Forwards Insp Repts 50-266/99-06 & 50-301/99-06 on 990223- 0410.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure NPL-99-0242, Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage1999-04-27027 April 1999 Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage NPL-99-0246, Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl1999-04-27027 April 1999 Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl ML20206C2361999-04-22022 April 1999 Forwards 1998 Annual Rept to Stockholders of Wepc Which Includes Certified Financial Statements,Per 10CFR50.71 NPL-99-0230, Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC1999-04-19019 April 1999 Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic1999-04-16016 April 1999 Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italics NPL-99-0219, Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire1999-04-15015 April 1999 Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire 05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i1999-04-0808 April 1999 Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept NPL-99-0174, Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 9807141999-03-30030 March 1999 Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 980714 ML20206B8231999-03-30030 March 1999 Forwards Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981103 for Point Beach Power Plant.One Deficiency Identified for Manitowoc County.County Corrected Deficiency Immediately NPL-99-0177, Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.751999-03-30030 March 1999 Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.75 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics1999-03-10010 March 1999 Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics NPL-99-0122, Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 &1999-03-0303 March 1999 Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 & 2 NPL-99-0111, Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months1999-03-0303 March 1999 Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months NPL-99-0116, Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld1999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld NPL-99-0115, Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 21999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0114, Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage1999-02-25025 February 1999 Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure1999-02-24024 February 1999 Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure NPL-99-0101, Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld1999-02-19019 February 1999 Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld ML20203F7301999-02-10010 February 1999 Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld NPL-99-0067, Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 21999-02-0202 February 1999 Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 2 NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement1999-02-0202 February 1999 Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld1999-01-27027 January 1999 Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld 05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications1999-01-26026 January 1999 Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr1999-01-15015 January 1999 Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr NPL-99-0004, Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 21999-01-11011 January 1999 Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0012, Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld1999-01-0808 January 1999 Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld 1999-09-30
[Table view] |
Text
- . >
. Wisconsin 1 Bectnc .
POWER COMPATH 231 w Meman po sax 2cas.wwasea u 5320s g<a) 229-2345 ,
VPNPD-93-054 !
NRC 031 t March 2, 1993 ;
Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 '
L Gentlemen: :
DOCKETS 50-266 AND 50-301 PUMP AND VALVE INSERVICE TESTING PROGRAM ,
THIRD 10-YEAR PROGRAM SAFETY EVALUATION REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 I Your letter _ dated April 17, 1992, transmitted a Safety Evaluation Report (SER) by the Office of Nuclear Reactor Regulation and an attached Technical Evaluation Report (TER) concerning our Inservice Test (IST) Program, Third 10-Year Interval. Our initial respanse f
actions to this SER were transmitted to you in our July 30, 1992, letter (VPNPD-92-271/NRC-92-085). The' purpose of this letter is to provide you with an update to our July 30, 1992, response. ,
In our letter of July 30, 1992, we discussed the initiation of modifications to the boric acid transfer system which would enable us to withdraw several relief requests associated with that system.
Modifications to Unit 2 were completed during our Fall 1992 refueling outage. Modifications to Unit 1 are scheduled for completion during our Spring 1993 refueling outage, which will ;
start in late March. As a result, we are withdrawing the following relief requests:
PRR-11, " Boric Acid Transfer Pumps" PRR-12, " Boric Acid Transfer Pumps" VRR-26, " Boric Acid Transfer Pump Discharge Check Valves" Modifications to the ESF HVAC system discussed in our letter of July 30, 1992, have been completed. The modifications provide instrumentation enabling measurement of Code required test 9303090044 930302 22 0n[
l PDR ADOCK 05000266 '
P PDR gg g ,,, ,
j 1
l Document Control Desk March 2, 1993 ,
Page 2 ;
parameters. Since the following relief requests related to the l ESF HVAC system are no longer applicable, we are withdrawing them ,
at this time: :
. t
- j. -
PRR-15, " Cable Spreading Room Chilled Water Pumps l and Control Room Chilled Water Pumps" ;
VRR-31, " Chilled Water Pump Discharge Check Valves" l 5
As discussed in our letter of July 30, 1992, we are pursuing !
modifications to all 4 auxiliary feedwater pump minimum flow valve l control systems to enable Code required testing. Modifications to ;
2AF-04002 have been completed. Modifications to 1AF-04002 and j
^
, non-unit specific valves, AF-04007 and AF-04014, are scheduled for completion by the end of our Spring 1993 refueling outage. Conse-quently at this time, we are formally withdrawing the following )
associated relief request: j VRR-28, " Auxiliary Feedwater Pump Mini-Recirc Valves" We have reevaluated Relief Request VRR-19 based on information in .
TER Sections 3.3.3 and 5.26. Contrary to the information stated in !
VRR-19, CV-00300 A&B (Units 1&2) are neither tested nor required to l be tested under 10 CFR 50, Appendix J (Type C Local Leak Rate j Test). These are normally open (throttled) ranual valves which j are not relied upon to perform any safety function. Under ASME' !
Section XI (1986), IWV-1000, " Scope and Responsibility," these i valves are not required to be tested. Consequently, they have been l removed from our IST Program and we are withdrawing the following !
associated relief request:
l 1
VRR-19, " Reactor Coolant Pump Seal Injection Throttle Valves" l
\
In response to TER Sections 3.11.2 and 5.36, we have initiated modifications to replace the current auxiliary feedwater pump ;
cooling water solenoid valves, MS-02090 (Units 1&2), with valves l that have position indication. The new valves will permit stroke l time testing in accordance with the Code and eliminate the need for l Relief Request VRR-20. As a result, we are withdrawing the following relief request:
VRR-20, " Auxiliary Feedwater Pump Cooling Water .
Supp1f Valves" {
Our earlier letter of July 30, 1992, formally withdrew several ;
relief requests no longer required after completion of physical <
modifications to various systems. In addition to the requests
c l
1 I
. t Document Control Desk 1 March 2, 1993 Page 3 i l
r previously withdrawn, our review of Relief Requests PRR-17 and [
PRR-18 in response to TER Section 5.07_ finds that these relief t requests may also be withdrawn now that the necessary modifications !
to permit testing have been-completed. As a result, we are !
withdrawing the following two relief requests: -
PRR-17, " Safety Injection and Residual Heat Removal Pumps" '
PRR-18, " Auxiliary Feedwater Pumps" lt The SER and TER evaluated several relief requests as not being required, and neither granted nor denied these requests. Our F review of these relief requests concurs with the SER and TER ;
evaluations that they are not required. As a result we are '
withdrawing the following relief requests t
PRR-16, " Measurement of Differential Pressure; All Pumps" l VRR-32, " Instrument Air Supply Check Valves to i PORVs" i VRR-33, " Fuel Oil Transfer Pump Pressure Regulating i Valves" '
Interim relief for a period of 1 year was granted by the SER f
for Relief Request VRR-21, " Main Feedwater Check Valves." In j response to TER Sections 3.10.1 and 5.31, we have revised relief :
request VRR-21 to provide additional information justifying why !
unconditional relief should be granted. This revised request i (Enclosure 1) addresses those concerns identified in TER Sections 3.10.1 and 5.31.
Relief Request VRR-24, " Emergency Boration Check Valves," has i been listed as an "open item" by the SER. In response to TER i Sections 3.3.4 and 5.27, we have revised Relief Request VRR-24 i (Enclosure 2) to provide additional justification for relief. We believe that the additional information provided in this request is j sufficient to now enable the granting of full relief. :
i Recent discussions between representatives of Edward Valves, t Incorporated (formerly Rockwell-Edwards) and our engineering staff, have caused us to reevaluate Relief Request VRR-27, " Safety Injection Pump Mini-Recirc Check Valves." This request, granted j with provisions by the SER, established a disassembly and inspection program for Valves 1&2 SI-00891 A&B (4 valves) in !
lieu of Code required stroke testing.
i I
~
i Document Control Desk March 2, 1993 ;
Page 4 Our experience with lift check valves of this manufacturer, type, I and style indicates that there is a high probability that the threads on these valves will be destroyed by the disassembly process. The body to bonnet threads on these valves are fine, non-tapered, stainless steel, and highly susceptible to galling.
The risk of thread damage associated with disassembly has been confirmed by the manufacturer, and this thread style is no longer used on their newer valves. Since the disassembly and inspection program prorosed in VRR-27 may result in destroying these valves by damaging body to bonnet threads, we are withdrawing the following relief request: i VRR-27, " Safety Injection Pump Mini-Recirc Check Valves" ,
In lieu of disassembly and inspection as described in NRC Generic Letter (GL) 89-04, Attachment 1, Position 2, Check 5 Valves 1&2 SI-00891 A&B will be full stroke exercised quarterly ;
during safety injection pump tests, in accordance with the criteria in GL 89-04, Attachment 1, Position 1. A new relief request, VRR-37 (Enclosure 3), is being submitted to account for this test method. i Should there be any questions regarding this matter, please do not hesitate to contact us.
Sincerely, j' " l- .
Bob Link Vice President Nuclear Power i
DEK/jg Attachments cc: NRC Resident Inspector NRC Regional Administrator, Region III Adele DiBiasio, Brookhaven National Laboratory I
Enclosum 1 ,
RELIEF REQUEST VRRr21 j i
COMPONENTS: UNIT I (Drawing M-202 Sh. 2): CS-00466 AA&BB.
CS-00476 AA&BB. .
UNIT 2 (Drawing M-2202 Sh. 2): CS-00466 AA&BB.
CS-00476 AA&BB. ;
CATEGORY: A/C. l t
FUNCTION: !
The main feedwater line to each steam generator has two, normally open, in line, series check valves. The function of these valves is to close upon reversal of flow to ensure that ,
auxiliary feedwater flow is unimpaired to at least one of the two steam generators while main feedwater is not available. The series check valves also prevent simultaneous blowdown of .!
both steam generators in the event of a main feed pipe failum. ;
f SECTION XI REOUIREMENT: !
Check v <es shall be exercised at least once every 3 months, except as provided by j IWV-3$d. (IWV-3521)
Valves that are normally open during plant operation and whose function is to prevent
.{
mversed flow shall be tested in a manner that pmves that the disk travels to the seat j promptly on cessation or reversal of flow. Confirmation that the disk is on its seat shall be ,
by visual observation, by an electrical signal initiated by a position indicating device, by !
observation of pressure indications in the system, or by other positive means. (IWV-3522)
Category A valves shall be leak tested, except that valves which function in the course of j plant operation in a manner that demonstrates functionally adequate seat tightness need not be leak tested. In such cases, the valve record shall provide the basis for the conclusion that operational observations constitute satisfactory demonstration. (IWV-3421) l BASIS FOR RELIEF:
)
The main feed line to each steam generator consists of two series check valves. The Point <
Beach FSAR makes no assumptions that require both series check valves to function. There :
are no position indicators on these valves to verify disk position, nor are there any pressure I
taps between them to enable individual leak rate testing. It is physically impossible, given the present plant configuration, to verify individual valve closure. Closure and seat tightness 3 of at least one of the two series check valves can be verified by measuring the diffemntial pressure across, or the leakage past, the combination of both valves. Since the valves in i series are considered to be redundant, testing both valves as a single unit is adequate to I ensum that the safety function of the valve combination is verified and maintained. !
Page 1 l i
. .}
Enclosure 1 l
BASIS FOR RELIEF: (continued) ,
Prompt seating of each valve on cessation or reversal of flow cannot be verified at the instant j of closure since no direct indication of valve disk position is available. !
Valve testing can only be conducted during cold shutdowns, since flow of main feedwater to the steam generators must be secured in order to perform the tests.
ALTERNATE TESTING:
A valve exercise test of each series combination of main feedwater check valves will be conducted during cold shutdowns, in accordance with the provisions of IWV-3412(a) and '
IWV-3522 that address the exercising of valves which have had testing deferred to cold shutdown conditions. At least one of the series valves will be verified closed after flow is secured by measuring the differential pressure across, and the leakage past, the two valves in i series.
Leak rate testing to satisfy Category A requirements will meet the criteria outlined in .
IWV-3420, except that the two valves in series shall be treated as though they were a single ,
component. ,
Additionally, once every 10 yc.ars, each main feedwater check valve shall be opened and -
inspected. The split body constmetion of valves 1&2 CS-00466 AA and 1&2 CS-00476 AA limits access to the valve internals, and permits inspection only through use of a boroscope. i Complete disassembly of these valves is not practical since it would require the movement of ,
piping and the cutting of large pipe support stmetures. Valves 1&2 CS-00466 BB and 1&2 CS-00476 BB are constmeted with no such limitations.
S_TATUS:
Active. Interim relief granted with provisions for a period of one year by NRC SER, dated Ap-il 17,1992. Request revised as this submittal to incorporate the necessary pmvisions and address regulatory concerns in an effort to obtain unconditional relief.
i f
b 9
?
Page 2 i
Enclosure 2 j
~
RELIEF REQUEST VRR-24 COMPONENTS: UNIT 1 (Drawing 684J741): CV-00351. ,
UNIT 2 (Drawing 685J175): CV-00351. l CATEGORY: C. -
FUNCTION: ;
i These valves open to provide a flow path for emergency reactor coolant system (RCS) boration from the discharge of the boric acid tmnsfer pumps to the suctions of the charging ;
pumps.
SECTION XI REOUIREMENT:
Check valves shall be exercised at least once every 3 months, except as pmvided by i IWV-3522. (IWV-3521) :
i BASIS FOR RELIEF:
{
~
Stroke testing these valves in the open direction requires the introduction of highly concentrated boric acid solution from the boric acid makeup tanks to the suctions of the charging pumps. This results in the addition of an excessive amount of boron to the RCS which will adversely affect plant power, potentially causing a reactor trip. During cold- i shutdowns of shon duration, the introduction of excessive amounts of boron into the RCS ;
complicates the task of maintaining proper plant chemistry and creates difficulties with ,
subsequent startup, especially later in core life.
t In addition to the adverse effects on primary plant chemistry, pumping' high concentations of boric acid through the emergency boration line can cause reactor coolant pump (RCP) seal -
failure. The RCP seal water supply lines are not heat traced. Crystallization of concentrated boric acid in the RCP seal injection filters will occur and cause a loss of RCP seal water.
Consequently, it is only possible to perform stroke testing on I&2 CV-00351 when reactor coolant pumps are secured and the associated RCP seal water lines are isolated.
Crystallization of boric acid may also occur in instrumentation sensing lines as concentrated boric acid is pumped into the chemical and volume control system (CVCS) for the purpose of stroke testing 1&2 CV-00351.
The steps necessary to establish plant conditions to permit the testing of 1&2 CV-00351, and those which are required to recover from that testing, are sufficient to preclude the testing of the valves during cold shutdowns in which there is no reactor refueling. Extending a cold shutdown period for the sole purpose of providing the necessary time to allow for the test and recovery from test conditions is excessively burdensome to the licensee.
1 I
Page1 S
.y. . _ _ ._. .
' Enclosure 2-
. BASIS FOR RELIEF: (continued)
Point Beach operates on an annual refueling cycle for each unit, and non-refueling cold ~ ,
shutdowns between cycles are rare. Deferral of testing for 1&2 CV-00351 to refueling '
outages will test each valve on an annual basis and is in keeping with ASME OMa-1988, i Pan 10, Section 4.3.2.2(e). Testing during annual refueling outages provides adequate -
assurance of the ability of these valves to perform their safety function.
l ALTERNATE TESTING: ;
These valves will be full stroke exercised to the open position during reactor refueling outages. t STATUS: l Active. His request is an open item as evaluated by the NRC SER dated April 17, 1992.
Request revised as this submittal to address regulatory concerns in an effen to obtain ;
unconditional relief. ;
d b
i e
F 4
Page 2
Enclosure 3 RELIEF REQUEST VRR-37 COMPONENTS: UNIT 1 (Drawing Il0E017 Sh. 2): SI-00891 A&B.
UNIT 2 (Drawing 110E035 Sh. 2): SI-09891 A&B.
CATEGORY: C.
FUNCTION:
These valves open to pmvide flow paths from the safety injection (SI) pumps to the refueling water storage tank (RWST) to provide for minimum flow through the respective pumps in the event they are operating against reactor coolant system (RCS) pressures higher than pump shutoff head.
Flow through the mini-recirc lines is limited by the individual line orifices, and is small ,
enough to make the effects of bypass flow through an idle pump negligible with respect to i the running pump's ability to fulfill its safety function. During long-term recirculation, there is no path back from the RCS that would allow reverse flow through an idle pump. As a result, these check valves do not have a safety-related closure function.
SECTION XI REOUIREMENT:
Check valves shall be exercised to the position required to fulfill their function.
Confirmation that the disk moves away from the seat shall be by visual observation, by electric signal, by observation of substantially free flow through the valve, or by other .:
positive means. (IWV-3522) i If valve exercising is performed using flow through the valve as the means to verify that the disk has moved away from its seat, there must be quantitative measurement of flow which confirms that " maximum required accident condition flow" has passed through the valve. 1 Any flow rate less than this is considered a panial stroke exercise.
(GL 89-04, Attachment 1, Position 1) ,
BASIS FOR RELIEF: ;
There is no installed flow rate instrumentation available to verify valve full stroke exercising as required by GL 89-04, Attachment 1, Position I. These valves have no means of local or remote position indication. Disassembly and inspection in accordance with GL 89-04, Attachment 1, Position 2, risk destroying the valve due to galling of the body-to-bonnet threads. i Use of ponable instruments provides a suitable means to measure flow rate in the lines
-i containing these valves and enables testing per GL 89-04, Attachment 1, Position 1.
Although the portable instruments lack the accuracy and repeatability of pennanently installed instrumentation, these difficulties can be overcome.
Page1 h
' Enclosure 3 i
I
. BASIS FOR RELIEF: (continued) i Use of portable instmments can be sufficiently pmcedumlized to ensure reasonable repeatability and accuracy in measurements. Inaccuracies associated with equipment can be j applied conservatively when establishing check valve flow rate acceptance criteria, such that even with the worst possible instrument accuracy, the chec1; valve must pass the " maximum ;
required accident condition Dow" of GL 89-04, Attachme ,t 1, Position 1, if the acceptance ;
criteria is met. j Note that these portable flow rate instruments are only being used for the full stroke ,
exercising of Check Valves 1&2 SI-00891 A&B, and not for gathering any data related to i pump perfor:iance. Consequently, the strict Code requirements penaining to instruments l used in pump testing (IWP-4000) do not apply in this instance, and relief is not required ;
from these sections of the Code, j ALTERNATE TESTING:
During quarterly pump testing, each of these valves will be full stroked exercised via recirculation through the minimu n flow test circuits. Quantitative measurement of flow which confirms that " maximum requimd accident condition Dow" has passed through the ;
valve shall be accomplished using ponable flow rate instruments. The manner of use of these instmments shall be sufficiently proceduralized to ensure maximum repeatability and ,
accuracy of the measuremen'.s. Acceptance criteria established based on flow rate will take- l portable instmment accuracy into account in such a manner so as to ensure that the check valve must have passed the " maximum required accident condition flow" of GL 89-04, .,
Attachment 1, Position 1, if the acceptance criteia is met.
STATUS:
Active. Request submitted to the NRC for initial review and approval.
3 i
Page 2