ML20012G541

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-69,revising TS Sections 1.0, Definitions & 3/4.3.6, Control Rod Block Instrumentation to Replace Designation for GE Critical Power Correlation GEXL W/More Generic Term
ML20012G541
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/27/1993
From: Sylvia B
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012G542 List:
References
NMP2L-1370, NUDOCS 9303090033
Download: ML20012G541 (2)


Text

l I

I l i M Y NIAGARA R UMOHAWK  :

NtAGARA MOHAWK POWER CORPORATION 'NINE t/lLE POINT PO BOX 63 LYCOMING NY 13093/TEt FPHoNE (315) 349-2882 i

B. Ralph SyMa

, Executwe %ce President Nuclear February 27,1993 U. S. Nuclear Regulatory Commission NMP2L 1370 Attn: Document Control Desk Washington, D. C. 20555

! Re: Nine Mile Point Unit 2 l Docket No. 50-410 NPF-69 i

Gentlemen:

Niagara Mohawk Power Corporation hereby transinits an Application for Amendment to Nine Mile Point Unit 2 Operating License NPF-69. Also enclosed are the proposed changes to the Technical Specifications set forth in Appendix A of the above mentioned license.

Supporting information and analyses demonstrating that the proposed changes involve no significant hazards consideration pursuant to 10 CFR f 50.92 are included as Attachment B.

l The proposed Technical Specification changes contained herein represent revisions to Section l 1.0, " Definitions," and Section 3/4.3.6, " Control Rod Block Instrumentation." Definition l 1.9, " Critical Power Ratio," is being proposed for revision to replace the designation for the l General Electric critical power correlation, "GEXL," with a more generic term. Proposed changes to Bases Section B2.1, " Bases for Safety Limits," are included to reflect the change to Definition 1.9. The setpoints for the Recirculation Flow Upscale Rod Block contained in Table 3.3.6-2, " Control Rod Block Instrumentation Setpoints," are being proposed for revision to facilitate operation at up to 105% rated core flow.

Finally, additional Bases changes to Sections B2.1, " Bases for Safety Limits," and B3/4.2,

" Power Distribution Limits," unrelated to the Technical Specification changes detailed above, are provided. These Bases changes incorporate revisions to General Electric's approved analytical techniques, update references, and reflect changes made to the Reload Section of the Nine Mile Point Unit 2 Updated Safety Analysis Report. Discussion of these Bases changes is included in the supporting information, but since they are unrelated to the proposed Technical Specification changes, the Bases changes are not addressed in the l Affidavit or the Significant Hazards Analysis. I l

080023 003414LL 9a0a0,0032 eao m PDR P ADOCK 05000410 PDR

[7 8 h

/

~' '

Page 2 To support end of cycle operation, Niagara Mohawk requests approval of this Application by July 1,1993. Pursuant to 10 CFR 6 50.91(b)(1), Niagara Mohawk has provided a copy of this license amendment request and the associated analyses regarding no significant hazards to the appropriate state representative.

Very truly yours, gf2 lb B. Ralph Sylvfa Exec. Vice President - Nuclear TDF/sek 003414LL Attachments xc: Regional Administrator Mr. W. L. Schmidt, Senior Resident Inspector Mr. R. A. Capra, Director, Project Directorate I-1, NRR Mr. J. E. Menning, Project Manager, NRR Ms. Donna Ross Division of Policy Analysis New York State Energy Office Agency Building 2 '

Empire State Plaza Albany, NY 12223 Records Management 1

i I

i