HMUWrIVE SL30mRY OF N:stnE3 OrtsmTDa3 IXRRIENCE LMIT I MMO( 1990 Manh 1 The Unit operated at a trainal value of 100% output.
thnugh Marth 16 Mardi 17 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> the Urdt's cutput was rataoed to 70% to permit partial stroke tasting of the Unit's main steam line isolation valves.
At 0308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br /> the Unit's output was incransed to 85% to load follow. At 0604 hcurs the Unit's output was emoalated to a nainal value of 100%.
Marth 18 me Unit operated at a nainal value of 100% output.
through Matth 29 Marth 30 At 1541 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.863505e-4 months <br /> the Unit tripped when the 'C' main feedwater flew control valve failed to ocotrol steam generator water level in the 'C' stamm generator.
Marth 31 The Unit runnined shut dcWn to rupair the 'C' main feed water flow control valve.
9004160264 900410 ADOCK 0500 4
{DR I
Uelf SNUTDOWes $me POWER REDUCT10e5 Decket so.
.30-334 Unit Gene SWPS Unit #1 9ete _marit 19_ 1999 Completed By e.A. W 6fearr
- EPoti feceTa sea #CR 1990 Telephone (412) 393-7621 feethod of Licensee Ceesse & Corrective Desretion Sheett ing Event Syst m Component Action to so.
Dete Typel (Boesrs)
Seeeen2 Doun Reector3 Seport 8 Cedes Code 5 Prevent Secesreente 5
900317 5
8 3
5 s/A CP watytu unit's outpest see redesced to 79E to permit pertlet stroke teetins of the Unit's mein eteen line f eetetten vetwes.
6 900330 F
32.3 A
3 1-90-807 Ce test 99 Unit tripped uhen 'C' sein feediseter flow contret wolve felled to control towet in the 'C' steen Senereter.
1 2
3 4
F-Ferced Ressen:
shethed:
EmhIbit G-Instrisctions fer C-Scheduled A-Equipment Fellesre (Emplain) 1-stoneset Preperation of Dete Entry Sheets 5-seeintenance er Test 2-stoneset Scram for Licensee Event Report (LER) File C-sef eset ing 3-Avtomotic Scram
(#UeEG0161).
D-eegistetery aestriction 4-Cent'd. f rom Previews scenth E-Operater Training & License Esse 5-teduction 5
F-Administrettwe 9-Other Exhibit I-Some Source.
G-operstienet Error (Emplain) n-Other (Emplain)
...m
.y.
s--4
.]
AVI! RAGE IAILY LNIT POWER IZYEL Dock /t No.
50-334 Unit BVPS Unit 1 Date Anril 10. 1990 Ocupleted by M. A. Wimer Teleghone f412) 393-7621 KNIH Mant 1990 IAY AVIRAGE DAILY PCSER 12 VEL IRY AVERAGE IAILY PJWER 1AVEL (M)
(We-Het) i 1
825 17 763
{
2 825 18 813 3
821 19 821 4
821 20 813 i
5 825 21 821 i
6 821 22 813
[
t 7
825 23 818 i
8 821 24 824 9
813 25 817 10 821 26 821 I
i 11 808 27 817 i
12 808 28 821 i
i 13 808 29 829 l
f l
14 808 30 498 L
15 804 31 0
16 804 l
i i
nemocricus On this femat, list the average daily unit power level in We-Net for each day
(
in the reporting month, ocmpute to the nearest Wie megawatt.
l l
t f
OPERATING DA*lA REPORT DOCKET NO.:
50 334 REPORT DATE:
04/06/90 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATINC STATUS
- 1. UNIT NAME: BT. AVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: MARCH 1990
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPIATE RATING (Cross NWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):
Eena
- 10. P.fASONS MR RESTRICTIONS. IF ANY:
b /A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 2160.0 121992.0
- 12. NO. OF HRS REACTOR WAS CRITICAL:
711.7 2085.5 74224.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS CENERATOR WAS ON LINE:
711.7 2080.1 72547.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1862208.0
$345894.0 171425949.5
- 17. CROSS ELECT, ENERGY GEN. (MWH):
612280.0 1764730.0 55034419.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
578830.0 1666840.0
$1363990.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 95.7 96.3 61.7
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 95.7 96.3 61.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 93.2 92.4 53.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 4.3 1.7 17.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE.AND DURATION OF
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
t NARRATIVE 8099&t OF i
i Inf1MLY OR3ETING EXPIRIDKZ f
LNIT II I
MMoi 1990 b
I l
I l
March 1
'Ihe thit cperated at a ncainal value of 85% output to f
I thrtugh stretch the current fuel cycle, j
i March 2 j
r t
Manh 3 At 0327 hours0.00378 days <br />0.0908 hours <br />5.406746e-4 weeks <br />1.244235e-4 months <br /> the thit's output was reduced to 50% output to i
stzwtch the current fuel cycle.
l l
Mard 4
'Ihm thit operated at a naminal value of 50% output to stretch the current fuel cycle.
March 5 At 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> the thit's cutpat was escalated to 85% to I
stretch the current fuel cycle.
\\
Marth 6
'Ihe thit operated at a ncninal value of 85% cutput to through ser.tch th. current fuel cyci.
Marth 9 j
l March 10 At 0033 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> the thit's output was reduced to 50% to out stretch the current fuel cycle.
l l
t Marth 11
'Ihe thit operstad at 50% cutput to stretch the current fuel i
cycle.
1 March 12 At 0407 hours0.00471 days <br />0.113 hours <br />6.729497e-4 weeks <br />1.548635e-4 months <br /> the thit's output was escalated to 85% output to.L.tdi the current fuel cycle.
Marth 13 At 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> the Unit's outprt was reduced frta 85% to 68%
i to iniprtue suboooling in the hotwell of the unit's main i
oordensar.
At 2017 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.674685e-4 months <br /> the thit's cutput was escalated to apprrwimately 854 to stzwtch the current fuel cycle.
March 14
'Ibe thit operated at agproximately 85% cutput to stretch the thrtugh current fuel cycle.
l March 16 Marth 17 At 0006 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the thit's output was reduced to approximately I
50% to stzwtch the current fuel cycle.
Marth 18
'Ihe thit operated at approximately 50% output to stretch the i
current fuel cycle.
i March 19 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> the Unit's output was escalated to t
approximately 85% output to stretch the current fuel cycle.
Marth 20
'Ihe Unit operated at approximately 85% output to stretch the-
{
thrtugh current fuel cycle.
Mardt 23 i
i l
f
_.~
j Mum m y - Or N:3CHLY OETRTDC DRRIIHCE TWIT II NWM 1990 l
(contifund)
Marth 24 At 0008 hcurs the thits cutput was reduced to aspecocinately 50% to stretd) the current fuel cycle.
Marth 25 The thit cperated at appetecinately 50% cutput to stretch the curn nt fuel cycle.
March 26 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the thit's cutput was emoalated to w-Ately 85% to stretch the current fuel cycle, Marth 27
'2he thit cperated at apprtacimately 85% cutput to strstch the through curn nt fuel cycle.
Marth 29 March 30 At 1748 hours0.0202 days <br />0.486 hours <br />0.00289 weeks <br />6.65114e-4 months <br /> the thit's cutpit was emoalated to 100% at system regnest.
Marth 31
'Ihm thit operated at a ncainal value of 100% cutpat.
I 1
i i
l
u
't AVDW2 ! AIM LWIT PCMDt 2 VEL Docket No. 50-412 Unit EVPS thit 2 Date Arril 10, 1990 l
Ocupleted by M. A. Wip*
l 74tlaghens f4121393-7621 M3f!N Martfi 1990 CAY AYDW2 IAIM RMDL IZYF.L IAY AVERMit IAIM POWER EVEL (Mee-Het)
(Mee-Net) 1 694 17-372 2
689 18 352 3
360 19 609 4
335 20 712 5
631 21 7 12 6
697 22 7 04 7
705 23 713 8
706 24 381 9
692 25 352 l
10 364 26 619 11 324 27 718 12 601 28 718 13 626 29 715 14 671 30 730 l
15 683 31 799 l
16 712 i
i DWINUCTICNS l
on this format, list the average daily unit pcwor level in M4e-Net for each day i
in the reporting merith. Ocupute to the nearest Wole megawatt.
j
?
l l
l
J C>
el LMelf SauTDoues Ame PouER RESUC788WS Socket ::c.
50-412 Unit some Sws tenit 82 Dete Amrii 19. 1999 Ce W eted 9y W.A. wiruarr
- EPoef meets mARCW 1999 Telephone -[412] 393-Tall method of Licensee Cowse & Corrective Dwretten Shutting Event System Component Action to so.
Dete Type 1 (souro) seeeenz Down seecter3 seport 8 Cedo4 Cees 5 Prevent esewerence 4
900303 S
9 s
5 s/A 22 222222 eeduced output from ME to SSE to stretch the current twet cycle.
t 5
900318 s
e s
5 m/4 22 222222 eeduced evtput from ME to Set to l
stretch the current feet cycle.
6 900313 F
S A
5 m/A
- F ENNNNE tutput reduced to 4SE te leprove tendoneer woewme.
7 900317 s
9 m
5 m/A 22 222222 eeduced output frw ME to Set to stretch the current fwet cycle.
S 900324 s
8 s
5 s/A 22 222222 eeduced output frse ME te SSE to stretch the current fwet cycle.
l 1
2 3
4 F-Forced esosent feethed:
Exhibit G-Instructione for S-Scheduled A-Epipamt Feltwre (Emplain) 1-seenuel Properetten of Dete Entry sheets e-mointenance er Test 2-esnuel Scram for Licensee Event soport (LES) File C-eefweling 3-Automatic scres (sumEG0141).
3-eegutetery meetriction 4-Cont'd. from Prewtowe stenth E-eyerster Training & Licenee Emee 5-eeduction 5
F-A M etetretIwe 9-Other Eshibit t Some 5euree.
G-operationet Error (Emplain) u-Other (Emplain) c-w
-,--.-ws.
,e..,._.
-m-,v,,,
,wy.,-..
,ee,wo_.-y
-.---w~
--,-,-m
.n--
,---,,-._me.
,---,-._e
-.---,-------,-----------e--w.
=.
v
=
o OPERATING DATA REPORT DOCKET NO.:
50 412 REPORT DATE: 04/07/90 COMPLETED SY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STAM!S l
l
- 1. UNIT NAME: SEAVER VALLEY POWER STATION, WIT 2 Notes j
- 2. REPORTING PERIOD: MARCH 1990
- 3. LICENSED THERMAL POWER (NWt):
2660 l
l
- 4. NAMEPIATE RATING (Gross NWe):
923
- 5. DESIGN ELECTRICAL RATING (Net NWe):
836 l
- 6. MAX. DEPENDA8LE CAPACITY (Gross NWe):
885 l
- 7. MAX. DEPENDA8LE CAPACITY (Not NWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
i
- 9. POWER LEVEL TO WICH RESTRICTED IF ANY (Not NWe):
Na
{
- 10. REASONS FOR RESTRICTIONS, IF ANY:
1 /A i
THIS NONTH YEAR TO DATE CUNULATIVE I
- 11. HOURS IN REPORTING PERIOD:
744.0 2160.0 20775.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744.0 2160.0 17716.8
- 13. REACTOR RESERVE SHUTDOW HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
744.0 2160.0 17586.9 l
1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GEN. (NW):
1476919.0 4358313.0 43171057.4
}
- 17. GROSS ELECT. ENERGY GEN. (NWH):
478100.0 1412900.0 13879000.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
457708.0 1336189.0 13092664.0 i
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.7
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 84.7 i
- 22. UNIT CAPACITY FACTOR (DER): PCT 73.6 74.0 75.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 5.9 t
i
- 24. SHUTDOWNS SCHEDULRD OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
"Mt UNITE tarnun arr Jtt TMC OTict it ENthUt pn To tro1N IN wit 1Y REPTEMhtR L990 AMn 12 ti-Entftr % TO At EMI thith 1M NOVNkt* 1990.
- 25. IF SHUT DOW AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO CONNERCIAL OPERATION):
b FORECAST ACHIEVED f
INITIAL CRITICALITY N/A N/A I
INITIAL ELECTRICITY N/A N /A CONNERCIAL OPERATION N/A N/A l
I i
l i
-