Revised Monthly Operating Rept & Unit Shutdowns & Power Reductions for Beaver Valley Power Station,Unit 1
ML20012F597
Person / Time
Site: Beaver Valley
Issue date: 01/31/1990
From: Winger M
DUQUESNE LIGHT CO.
To:
Shared Package
ML20012F596 List:
References
NUDOCS 9004160262
Download: ML20012F597 (2)


Text

-______

(MsIT SeUtDOWes Ae9 PowE2 WEDUCTIOes sectet me.

_59-334 Unit samme SVPS W t #1 s-Dete Scrit 19. 1999 Coupleted Sy _m.m. Wiw REPoti fecuta JanuatY 1990 Telep8eene 141D 393-/621 I

feethod of Licensee Cowse & Corrective Dwretion Shotting twent Systee Component Action to so.

Dete Typet (sours) seesen2 Doun seecter3 Report #

Code 4 Code $

Prevent seewrrence 1

900181 5

e a

4 s/A

  1. C FWELNE Unit opereted et feduced evtput for fwet pre-conditlening and core flua emppine.

2 900108 F

G S

3 m/A et lesfew Unit's output reduced to M to perform esintenance on tt,musener 1 seet 9/P troneeltter for the

'A' coetent pump.

3 900119 F

3.2 A

1 1-90-801 Et SEsESA Unit stavedoun to repef r inverter for the number 3 Vitet Sue.

4 900119 5

44.4 4

9 D/A CG welwER Unit remained seswedoun to repetr teeking relief welwee en the merest letdoun time and the regeneretive heet + C.m..

1 2

3 4

F-Forced Recoen:

Stethed:

Embibit G-instructions for S-Scheduled A-E wipner.t Feltwre (Emplain) 1-stenuel Properation of Dete Entry S8ecets 8-80eintenance er Test 2-80enuel Scree for Licensee Event Report (LER) File C-tefweling 3-Avtomotic Scres (uUWEC4141).

3-segutetwy Restrict ten 4-Cent'd. frees previews seenth M4 E-Operster Training & License Enem 5-Reduction 5

00 F-Administrative 9-Other Ezhibit 8-Some Sewrce.

G-Operationel Error (Emplain)

N-Other (Emplain)

D&

CO OM 0 0*

Xt9 04 OIO n r>

no.A 6

OWO CM b

}

E OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE: 02/07/90 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 l

QffAATINC STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JANUARY 1990
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLAYE RATING (Gross NWe):

923

5. DESIGN ELECTRICAL RATING (Not NWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEFENDARLE CAPACITY (Not MUe):

810 l

ff. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT GIVE REASONS:

I

~

9. POWER LEVEL TO VHICH RESTRICTED. IF ANY (Not NWe):

Nana

10. REASONS FOR RESTRICTIONS. IF ANY:

N/A i

THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

744,0 744.0 120576.0

12. NO. OF HRS REACTOR WAS CRITICAL:

701.8 701.8 72840.3 l

13. REACTOR RESERVE SHUTDOWN HOUR $:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

696.4 696,4 71163.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1717462.0 1717462.0 167797517.5

17. CROSS ELECT. ENERGY GEN. (MWH):

566020.0 566020.0 53835709.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

532940.0 532940.0 50230090.0

19. UNIT SERVICE FACTOR: (PERCENT) 93.6 93.6 61.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 93.6 93.6-61.2
21. UNIT CAPACITY FACTOR (MDC): PCT 88.4 88.4 54.4
22. UNIT CAPACITY FACTOR (DER): PCT 85.8 85.8 52.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.5 0.5 17.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE.AND DURAT
25. IF SHUT DOWN AT FSD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1