-______
(MsIT SeUtDOWes Ae9 PowE2 WEDUCTIOes sectet me.
_59-334 Unit samme SVPS W t #1 s-Dete Scrit 19. 1999 Coupleted Sy _m.m. Wiw REPoti fecuta JanuatY 1990 Telep8eene 141D 393-/621 I
feethod of Licensee Cowse & Corrective Dwretion Shotting twent Systee Component Action to so.
Dete Typet (sours) seesen2 Doun seecter3 Report #
Code 4 Code $
Prevent seewrrence 1
900181 5
e a
4 s/A
- C FWELNE Unit opereted et feduced evtput for fwet pre-conditlening and core flua emppine.
2 900108 F
G S
3 m/A et lesfew Unit's output reduced to M to perform esintenance on tt,musener 1 seet 9/P troneeltter for the
'A' coetent pump.
3 900119 F
3.2 A
1 1-90-801 Et SEsESA Unit stavedoun to repef r inverter for the number 3 Vitet Sue.
4 900119 5
44.4 4
9 D/A CG welwER Unit remained seswedoun to repetr teeking relief welwee en the merest letdoun time and the regeneretive heet + C.m..
1 2
3 4
F-Forced Recoen:
Stethed:
Embibit G-instructions for S-Scheduled A-E wipner.t Feltwre (Emplain) 1-stenuel Properation of Dete Entry S8ecets 8-80eintenance er Test 2-80enuel Scree for Licensee Event Report (LER) File C-tefweling 3-Avtomotic Scres (uUWEC4141).
3-segutetwy Restrict ten 4-Cent'd. frees previews seenth M4 E-Operster Training & License Enem 5-Reduction 5
00 F-Administrative 9-Other Ezhibit 8-Some Sewrce.
G-Operationel Error (Emplain)
N-Other (Emplain)
D&
CO OM 0 0*
Xt9 04 OIO n r>
no.A 6
OWO CM b
}
E OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE: 02/07/90 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 l
QffAATINC STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JANUARY 1990
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLAYE RATING (Gross NWe):
923
- 5. DESIGN ELECTRICAL RATING (Not NWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEFENDARLE CAPACITY (Not MUe):
810 l
ff. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT GIVE REASONS:
I
~
- 9. POWER LEVEL TO VHICH RESTRICTED. IF ANY (Not NWe):
Nana
- 10. REASONS FOR RESTRICTIONS. IF ANY:
N/A i
THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
744,0 744.0 120576.0
- 12. NO. OF HRS REACTOR WAS CRITICAL:
701.8 701.8 72840.3 l
- 13. REACTOR RESERVE SHUTDOWN HOUR $:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
696.4 696,4 71163.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1717462.0 1717462.0 167797517.5
- 17. CROSS ELECT. ENERGY GEN. (MWH):
566020.0 566020.0 53835709.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
532940.0 532940.0 50230090.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 93.6 93.6 61.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 93.6 93.6-61.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 85.8 85.8 52.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.5 0.5 17.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE.AND DURAT
- 25. IF SHUT DOWN AT FSD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1