ML20012F371

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/90-06 & 50-457/90-06 on 900201-0317.One Noncited Violation Identified
ML20012F371
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/30/1990
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20012F372 List:
References
NUDOCS 9004120061
Download: ML20012F371 (2)


See also: IR 05000456/1990006

Text

.

avO

~

,

.

!

-

-

.

1

-

!

'

!

MM 3 01990

l

i

Docket No. 50-456

f

Docket No. 50-457

l

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

!

Post Office Box 767

l

Chicago, IL 60690

l

Gentle.tien:

This refers to the routine safety inspection conducted by T. M. Tongue,

T. E. Taylor

R

thisofficefrom.N.Sutphin,D.R.Calhoun,andA.M.Bongiovanniof

i

february 1 through March 17, 1990, of activities at

i

the Braidwood Station, Units 1 and 2, authorized by NRC Operating

'

License Nos. NPT 72 and NPT-77, and to the discussion of our findings

with Mr. R. E. Querto and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of 4 selective examination of procedures and representative records,

observations, and interviews with personnel.

One non cited violation was identified during the course of this inspection.

I

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

l

of this letter, the enclosures, and your response to this letter will

'

be placed in the NRC Public Document Room.

!

The responses directed by this letter and the accompanying Notice are

-

not subject to the clearance procedures of the Office of Nanagement and

!

Budget as required by the Paperwork Peduction Act of 1980, PL 96-511.

i

!

,

1

-f o\\

-

!

%

l

l

9004120061 900330

FDR

ADOCK 05000456

.

'

o

PDC

.

'

.

-

-

.

.

.

Coracnwealth Edison Cornpany

2 MAR 8 61m

We will gledly discuss any questions you have concerning this inspction.

Sincerely,

  • 0riginal signed W W.D. M P

W. D. Shafer, Chief

Reactor Projects Branch 1

Enclosure:

Inspection Reports

No. 50 456/90006 DRP 1

No. 50-457/90006 DRP

cc w/ enclosure:

T. J. Maiman, Vice Presic' erit.

FWR Operations

T. Kovach, Nuclear

Licensing Manager

-

S. Hunsader, Nuclear

Licensing Administrator

R. C. Querio Station Manager

D. E. Cooper, Regulatory

Assurance Su

DCD/DCB (RIDS)pervisor

Licensing fee Managenent Branch

Resident Inspector, Rll!

Braidwood

Resident Inspector, R111 Byron

Resident Inspector, Rill Zion

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

j

)

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

E. Reis. OGC

Stephen P. Sands, NRR

TSS, R!l!

/

fr landsinan

C16yton

5,Me

oun/jp

r

3-w1o

ve**

3 goao

'