ML20012E760
| ML20012E760 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/28/1990 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Beard P Florida Power Corp |
| Shared Package | |
| ML20012E761 | List: |
| References | |
| NUDOCS 9004060256 | |
| Download: ML20012E760 (3) | |
See also: IR 05000302/1990007
Text
,
_
- *
SAFEGUARDS INFORMATION
)
.-
.
"
NAR t 3 990
1
Doctet No. 50-302
License No. DPR 72
ggtM
Florida Power Corporation
cygdg \\
Mr. Percy M. Beard, Jr.
Senior Vice President, Nuclear
Operations
ATTN: Manager. Nuclear Operations
Licensing
P. O. Box 219-NA-21
Crystal River, FL 32fs29
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/90-07
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Ms. Orysia M. Masnyk on February 20-23, 1969. The inspection included a review
of activities euthorized for your Crystal River facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed luspection Report.
Areas examined during the inspection are identified in the report.
Within
these erets, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
ectivities in progress.
Within the scope of the inspection, violations or deviations were not
identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure.
Therefore, the enclosure
to this letter with the exception of the report cover page., which presents a
nonexempt surrnary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
CRIGINAL $10NED BY
DAYiD R. McGUIRE
William E. Cline, Chief
Nuclear Materials Safety and
9oo40602g {,9,Q ,$..o2
Safeguards Branch
FDR
AoC
FDC
Division of R&diation Safety
I
O
and Safeguards
p
Enclosure:
(See page 2)
-
__
- _
- ,, ,,,
o
.
SAFEGUARDS INFORMATION =:",.:.J.TA..,
~~
_ ,n, ~ ~
e
.y
-
S'AFEGUARDS INFORMATIDN
- - - -
~
.
"
"
m
-s
f '
>
' 'orida Power Corporation
MS8 M
k.
F1
2-
' '
.,
i
- Enclosure;
NRC Inspection Report
- y'
(SafeguardsInformation)
cc w/cnc1:
' Gary L. Boldt
Vice President, Nuclear Production
r,
, Florida Power Corporation
P. O. Box 219 SA ?C
Crystal River, FL 32029
P. F. McKee, Director .
Nuclear Plant Operations
"
Florida Power Corporation
P. O. Box 219-NA-20
Crystal River, FL 32629
cc w/ Inspection Suninary:
.R. C. Wide 11. Director
Nuclear Operations Site Support
Florida Power' Corporation
P. O. Box 219-hA-21
Crystal Piver, FL 32629
.A. H. Stephens
General Counsel
i'
Florida Power Corporation
MAC - ASD-
P. O. Box.14042
St. Petersburg, FL- 33733
Attorney General
Departmeret of. Legal Affairs
The Capitol
Tallahassee FL 32304
Jacob Daniel Nash
' Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
Administrator
,
.-
Department of Environnental
'
Regulation
Power Plant Siting Section
. State of Florida
2600 Blair Stone Road
Tallahassee, FL -32301
(ce w/ Inspection Summary cont'd - See page 3)
g,
SAFEGUARDS INFOR~M ATION .. --..,-;a~;,;;;='n.a
,
o
f ~ ~' ., 0
SAFEGUARDS INFORMATION
,
,. .. .. ...,... -"*~~'
-
Florida Power Corporation
3
(cc w/ enc 1 cont'd)
.
State Planning and Development
l
Clearinghouse
i
Office of Plar.ning and Budgeting
!
Executive Office of the Governor
The Capitol Building
'
l
Tallahassee, FL 32301
1
!
Chairman
Board of C M.ty Commissioners
Citrus County
110 N. Apopka Avenue
Iverness, FL 36250
!.
j
l
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
1700 Rockville Pike, Suite 525
Rockville, MC 20852-1631
State of Florida
bcc w/ encl:
NRR/DRIS/SB
i
bec w/ inspection Summary:
Document Control Desk (RIDS IE04), 016
NRC Resident inspector
!
_ .
,
, _ , .. , ~ , =,. c,,.
w
=::=. =.
,
,,,am e m,.
Rn:DRss
- ' ss
,s
p
""&
fo34l0
'5%EGUARDS INhkkATl0N
!o'
f
-
os
<