ML20012E507
| ML20012E507 | |
| Person / Time | |
|---|---|
| Issue date: | 11/11/1977 |
| From: | Higginbotham L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Cobb L NRC |
| Shared Package | |
| ML20011C478 | List: |
| References | |
| FOIA-89-376 NUDOCS 9004050293 | |
| Download: ML20012E507 (1) | |
Text
y,.p,u sh.~, w :ng -
ni h aNhsw<xda= *" ** **"'~.. a p' un...c
'~'
S[-
-I
)
.;p;,
J ::
b I.
4 4,
'8
- 's A
,f L[
L F
NOV 111977 1
O MEHORANDUM FOR:
L. I. Cobb W
[
_ j-
.FROM:
L. B. Higginbotham 4p 1
SU3 JECT:
INTERIM FUNDIt.G FOR ARGOWE NATIOML LABOMTORY i
TO PERFORM SURVEYS IN WEST CHICAGO. AREA i
~
A study of Thorium Residuals in the West Chicago, Illinois area was
,j contracted to ANL by NRC for fiscal. year 1977.(30-19-01/A21317)
This study has been completed and Argonne has used the small aacunt of remaining noney to perfonn some additional surveys o;utside of the i
scope of the FY 1977 contract.
]g of a recent aerial survey.
These surveys are to check the results E
j It is inportant that these additional surveys be completed as soon as 4~
-possible before inclenent weather prevents performing them.
H
- ly It is requested that the fiscal 1977 contract be s;pplenented with
.e g
$10.000 until a-new work statement and 189 is agreed to for FY 1978 a
work.
W 3,
y r
j j
Leo B. Higginbotham, Acting Director J
- i.
Division of Fuel Facilities and p
]
Materials Safety Inspection Office of Inspection and Enforcenent a
1 O
o tA 6
{ o wwqos{est e.NA 50 o n hepvM w a w oe.Q - 6 W D l
COMTACT:
.D. K. Sly f
I l
49-23103 p4. " {^ -
1:
e IE:FFHSI' IE:FFHSI IE:FFMSI DKSly:per
.LOCunningham LBHigginbotham h
(
11/
/77 11/
/77 11/
/ppam
)
i A
'3
~^"Y e
T'"*
'