Notice of Violation from Insp on 900101-0220.Violation Noted:Licensee Did Not Perform Testing Required by Tech Spec 4.5.E.2 Until 900212 Due to Misinterpretation of Test Results
ML20012E445
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/27/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20012E444 List:
References
50-277-90-01, 50-277-90-1, 50-278-90-01, 50-278-90-1, NUDOCS 9004050165
Download: ML20012E445 (1)


Text

.

3

')

APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket No.

50-277 Peach Bottom Atomic Power Station License No. DRP-44 Unit No. 2 The inspection conducted on January 1 through February 20, 1990, identified the following violation, characterized according to the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy):

Unit 2 Technical Specification (TS) 4.5.E.2 requires that when one valve of l

the automatic depressurization system (ADS) is inoperable, the ADS subsystem 3

actuation logic for the other ADS valves and the HPCI subsystem shall be t

j demonstrated to be operable immediately and at least weekly thereafter, i

Contrary to the above, on February 7,1990, f ailure of Surveillance Test ST 1.8, " Automatic Depressurization System (ADS) 'A' Logic System Functional,"

l Revision 23, demonstrated that ADS valve "K" was inoperable.

The licensee did not perform the testing required by TS 4.5.E.2 until February 12, 1990, due to misinterpretation of the test results.

This is a Severity Level IV Violation (Supplement I).

l Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is l

required to submit to this office within thirty days of the date of the letter i

that transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps taken and the results; (2) corrective l

steps that will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.