Forwards Safety Insp Repts 50-277/90-01 & 50-278/90-01 on 900101-0220 & Notice of Violation.Corrective Actions Requested Re Inadequate Review & Disposition Surveillance Test Results
ML20012E443
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/27/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20012E444 List:
References
NUDOCS 9004050164
Download: ML20012E443 (3)


See also: IR 05000277/1990001

Text

,

.

%

.

.

.

,

4

.

.

Docket Nos. 50-277/DPR-44

27 MAR 1980

50-278/DPR-56

Philadelphia Electric Company

Correspondence Control Desk

ATTN: Mr. C. A. McNeill

Executive Vice President-Nuclear

P. O. Box 7520

Philadelphia, PA 19101

Gentlemen:

Subject: Combined Inspection 50-277/90-01; 50-278/90-01

This letter transmits the findings of the routine resident safety inspection

by Messrs. J. J. Lyash, R. J. Urban, L. E. Myers and D. Moy from January 1

through February 20, 1990, at the Peach Bottom Atomic Power Station Delta,

Pennsylvania. Direct observation of activities, interviews, and document

reviews form the basis for these findings.

The inspectors discussed the

details of the inspection with Mr. J. F. Frant of your staff.

Based on the results of this inspection it appears that some of your

activities were not conducted in full compliance with NRC requirements. One

violation for failure to adhere to the provisions of a radiation work permit

resulted in an unplanned personnel radiation exposure.

This incident was

self-identified and aggressively addressed by plant management. We have

determined that this example satisfies the criteria for licensee identified

violations as stated in 10 CFR 2, Appendix C, Section V.G.1, and as such no

Notice of Violation (NOV) will be issued.

The inspection identified one additional violation of NRC requirements for

failure to comply m i th Technical Specification (TS) 4.5.E.2, regarding

l

performance of re: tred surveillance tests with an inoperable ADS valve. The

NOV enclosed as 2'pendix A describes the specific violation. The severity

level was chart,terized according to the " General Statement of Policy and

Procedure for hRC Enforcement Actions," 10 CFR 2, Appendix C (Enforcement

Policy).

In responding, please follow the instructions contained in the

Appendix.

It appears that inadequate review and disposition of deficient surveillance

test r.sults led to the failure to implement the TS required actions.

This

review involved both technical and operations staff and supervision.

In

responding to the violation please include your corrective actions to address

this area.

OFFICIAL RECORD COPY

CIR PB 90-01 - 0001.0.0

9004000164 900327 ,

03/26/90

ADOCK0500k2['

(

FDR

g

-

.

.

'

.

)

Philadelphia Electric Company

2

'

27 MAR BSO

A copy of this letter and the enclosures will be placed in the NRC Public

Document Room. We appreciate your cooperation.

Sincerely,

A. Randolph Blough, Chief

Projects Branch 2

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Combined Inspection Report 50-277/90-01; 50-278/90-01

cc w/ enc 1:

C. A. McNeill, Executive Vice President-Nuclear

D. M. Smith, Vice President, Peach Bottom Atomic Power Station

D. R. Helwig, Vice President, Nuclear Services

J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station

E. J. Cullen, Jr., Esquire, Assistant General Counsel

G. A. Hunger, Jr., Director, Licensing Section

J. P. Wilson, Project Manager (Acting), Peach Bottom Atomic Power Station

R. J. Lees, Chairman, Nuclear Review Board

T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station

J. Urban, General Manager, Fuels Department, Delmarva Power

W. H. Hirst, Director, Joint Generation Projects Dept., Atlantic Electric

B. W. German, Manager-External Af fairs, Public Service Electric & Gas Co.

T. B. Conner, Jr., Esquire (Without Report)

R. L. Hovis, Esquire (Without Report)

T. E. Magette, Power Plant $tting, Nuclear Evaluations

D. Poulson, Secretary of Harford County Council

Public Document Room (DPR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

OFFICIAL RECORD COPY

CIR PB 90-01 - 0002.0.0

03/26/90

- _

- _ _ _ . - _

_ - _ _ _ _ _ _

_ _ _ _ _ _ - _ - - - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .

_ - - - _ _ _ _ _ _ _ _ _ _ -

-

,

.

  • -

,

,

i

i

Philadelphia Electric Company

3

27 MAR 1980

l

bec w/ enc 1:

!

>

Region ! Docket Room (with concurrences)

!

Management Assistant. DRMA (w/o enclosure)

,

SRI, Limerick 1 and 2

K. Abraham, Public Affairs Officer (2)

'

G. Y, Suh, Project Manager, NRR

R Bellamy, RI

]

t

i

i

"

.

i

'

'

i

)

I

I

r

l

I

i

,

I

i

l

i

t

i

!

I

'

!

.i

!

s

I

!

I

!

ht

RI:0RP

RI:DRP

RI:DRP

I

QLyash

Doerflein

glough

j

34r,/90

3A8/90

3[h90

!

r

OFFICIAL RECORD COPY

CIR PB 90-01 - 0003.0.0

[