ML20012D242
| ML20012D242 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/12/1990 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20012D243 | List: |
| References | |
| NUDOCS 9003270091 | |
| Download: ML20012D242 (3) | |
See also: IR 05000245/1990004
Text
n
,%
,
4.y.
MAR 121990
e
'
Docket Nos. 50 245
50-336
50 423
j
Northeast Nuclear Energy Company
ATTN:
Mr. E. J. Mroczka
.!
Senior Vice President - Nuclear
Engineering and Operations Group
P. 0.. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Combined Inspection No. 50-245/90-04; 50-336/90-05; 50-423/90 05
j
A routine radiological controls inspection was conducted on February 12-16
i
1990. by Mr. R. L. Nimitz of this office ut the Millstone Nuclear Power Station
Haynes at~ the conclusion of the inspection.pection were discussed with Mr. H. F.
.
!
Units 1, 2, and 3.
The findings of the ins
.
The areas reviewed during the inspection are described in the enclosed
.
organization and staffing, and contamination control. previous NRC findings,
. inspection report. Areas reviewed included action on
,
,
1
One appeent violation was identified and is described in the enclosed Notice of
Violation
The violation involves three examples of personnel not following
radiolo!ogical centrolled zone without performing the required personnelThe first exam
feal centrols procedures.
+
a radio
contamination monitoring prior to exiting the zone. The second example-Involved
failcre to properly label drums of radioactive material.
The third example
-
involved performance. of work with an ir. adequate radiation work permit resultirg
',
in generation of uncontrolled airborr.e radioactivity contamination and
subsegunnt area and por;onnel contaminatien.
Although this latter example, failure to use an adequate radiation work permit,
l
was also identified by your staff, we have, after careful review, elected to
l
include this example in the enclosed Notice of Violation.
The bases for our
l
decision is discussed in the enclosed inspection report. We are particularly
l
concerned that the cause.of this latter example was apparently inadequate
,
planning and review of a work activity. The need to improve planning, review
l
and control of activities that could result in the loss of control of
I
radioactive material was discussed in our August 31, 1989 letter to you.
Our inspection also identified a number of concerns in the area of contamination
control and definition of the responsibilities of your radiological controls
organization.
These concerns are discussed in the enclosed inspection report.
,
9003270091 900312
{DR
ADOCK 05000243
i
D.0
. . .; - ..a ~ n
i
uo
~
~
~
.
o
.
c;
.. e
,
,
.
1.fAR 12 1993
Northeast Nuclear Energy Company
2
You are required to respond to the enclosed Notice of Violation and follow the
directions contained therein. In your response, please identify the actions
and control of
planned or taken by you to ensure adequate planning, review
activitiestoprecludelossofcontrolofradioactivematerIal.
Your cooperation with us is appreciated.
Sincerely,
c
' n n.g ay:
0:4 2! n. i.,% ;i.gr
!
Rons1d R. Bellamy, Chief
facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
,
and Safeguards
!
Enclosure:
2. Combined NRC Inspection Report Nos. 50-245/90-Ot. ;
50-336/90 05; 50-423/90 05
cc w/ enc 1:
I
Vice President, Nuclear Ope Ltions
W. D. Romberg,tation Supe-intendent
S
S. E. Scace,ist, Director of Quality S9rvices
D. C. NordqL
R
M. Kacfch, Managar,Superir.tendent, Haddam NeckGenerrtion Facilities Licensing
,
D. 6. Miller Station
.
'
Gerald Garfield, Esquire
PDR)
Public Document Rnom (Room (LPDR)
local Public Document
'
Nuclear Safety Information Ceater (NSIC)
NRC Resident Inspector
State of Connecticut
.
)
I
g,
s+
' c u bil 1
y
_ ,
, .
m-
-,
'~'
..
j
'
i
-
-,,
,.
-.
.. .
.
..
7
.,.
,
t x
L
Northeast Nuclear Energy Company
3
MAR 121990
i
I
Regio / encl:n I Decket Room (with concurrences)
bec w
Management Assistant, DRMA (w/o encl)
DRP Section Chief
J. Shedlosky$RI, Millstone 3
SRI, Haddam Neck
W.'Ra mond,
M. Bo le, LPM, NRR
,
D. Ja fe, LPM NRR
R. Bores,DRS$
.
J. Dyer, EDO
8
,
e
f
>
.
l
l
RI:DRSS
RI:DRSS
Nim
ak
Bellamy
3f4790
/ 3/ C/90
3/p/90
!-
i
i
g
-
.
.
-
-