ML20012D119
| ML20012D119 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/13/1990 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20012D120 | List: |
| References | |
| NUDOCS 9003260492 | |
| Download: ML20012D119 (3) | |
See also: IR 05000277/1989026
Text
7
,1
(
.
m
'4'
?..Q'
.:
.
..
.
a
.
AlMAR1980
,
L
Docket Nos. 50-277/DPR-44
!
"
. 50-278/DPR-56
Philadelphia Electric Company
j
L
Correspondence Control Desk
.
P
ATTN: .Mr. C. A. McNeill
'
Executive Vice President-Nuclear
P. O. Box 7520
l
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection Report 50-277/89-26; 50-278/89-26.
This-letter transmits the findings of the routine resident safety inspection by
,
Messrs. J. J. Lyash, L. E. Myers, R. J. Urban and others on November 20 to
December 31, 1989, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.
.These findings were ba' sed on observation of activities, interviews, and document
reviews, and have been di> cussed with Mr. J. F. Franz of your staff.
+
,
During the inspection period Unit 2 continued to operate, and the extended Unit.3
outage was concluded. The management review and self-assessment efforts applied
.
to the Unit 3 restart and pcwer ascension demonstrated a commendable safety
a
perspective. We encourage your continued efforts to implement an effective
- self-assessment program.
Based on the results of this inspection it appears that some of your activities
~
were not conducted in full compliance with NRC requirements. One violation for
failure to properly document Quality Control inspections was identified. .Our
review determined that this example satisfies the criteria for licensee identi-
"
fied violations as stated in 10 CFR 2, ' Appendix C,Section V.G.1, and as such
no Notice of Violation will be issued.
A second violation-was identified as set forth in the Notice of Violation
. enclosed as' Appendix A.
Several incidents involving failure of licensed
operators'to adhere to preapproved control rod manipulation sequences occurred.
3
~ As noted in the cover letter of In;pection Report 50-277/50-278/89-23 we are
~
cnneerned that incidents of this type may be indicative of underlying personnel
- performance weaknesses. Significant management action to analyze and address
,~
I
these errors was evident during the inspection period.
Because review and
corrective action efforts undertaken appear well focused, no written response
to this violation is required.
We will review your final root cause analysis
and will continue to monitor this area closely. Your continued careful atten-
L
tion is warranted to ensure that the underlying root causes are identified and
~
!
addressed.
g
j@f2kO$k$b0
7
'
,
rs
l
OFFICIAL RECORD COPY
CIR PB 89-26/26 - 0001.0.0
I
02/28/90
n:
-
q
[3
.
<
..
,
^!s
.
.
g
. Philadelphia Electric Company-
~ 2
i
.[
)
O
,
w
'
This violation has been categorized by severity level in accordance with the
" General. Statement of Policy and Procedure for NRC Enforcement Actions,"
.
'
r-
10 CFR 2,- Appendix C (Enforcement Policy).
A copy of this. letter and the enclosures are being placed in the NRC Public
Document Room. Your cooperation with us is appreciated.
Sincerely,
l
!
A. R. Blough, Chief
.
.
'
Projects Branch 2
Division of Reacto, Projects
Enclosures:
1. Appendix A, Notice of Violation
2.; Region I Combined Inspection Report No. 50-277/89-26; 50-278/89-26
cc w/encis:
C. A. McNeill, Executive Vice President-Nuclear
D. M. Smith, Vice President, Peach Bottom Atomic Power Station
D. R. Helwig, Vice President, Nuclear Services
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
E. J. Cullen, Jr., Esquire, Assistant General Counsel
G. A. Hunger, Jr. , Director, Licensing.Section
J. P. Wilson, Project Manager (Acting), Peach Bottom Atomic Power Station
R. J. Lees, Chairman, Nuclear Review Board
T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power
W. H. Hirst, Director, Joint Generation' Projects Dept., Atlantic Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.
l
. T. B. Conner, -Jr. ,' Esquire (Without Report)
R. L. Hovis, Esquire (Without Report)
l
T. E. Magette, Power Plant Siting, Nuclear Evaluations
.D. Poulsen, Secretary of Harford County Council
Public Document Room (PDR)
g
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
l
!
0FFICIAL RECORD COPY
CIR PB 89-26/26 - 0001.1.0
02/28/90
L
i
l
. .
e
' oe :-
, c. :
.
.
4:;,:r'
18 MAR 1990
-
Philadelphia-Electric Company
3
- .
v.
bec w/encis:
~
-Region I Docket Room (with concurrences),
'
ManagementAssistant,-DRMA(w/oenclosure)
SRI, Limerick 1- and 2 -
Karl Abraham, Public Affairs Officer -(2)
-G. Y. Suh, Project Engineer, NRR
4
I
!
!
j
!
i
l
$0
JO
9
l
RI:DRP
DRP
<
'(pxLyash
Doerflein
Blough
03/I'l/90
03/l4/90
03//y/90
'
0FFICIAL RECORD COPY
CIR PB 89-26/26 - 0002.0.0
03/01/90
1
.
. .
.