r ORL 33 A

~

t OFFICIALTRANSCRFr OF PROCEEDINGS t

i l-NUCLEAR REGULATORY COMMISSION

/

Qency; i

Tide:

TAPE NO. 850/851, SIDE A, SIDE B BLANK 1

Docket No.

LOCATION:

1. 20 Dece:nher 18, 1989 gg m

L

?

C l

I 9003260068 900320 O

.J fg gy g gg g

DR ADOCK 0500 3

1612 K St. N.W. Suite 300 mshington, D.C. 20006 (202) 293-39 %

l l

i..

j C-r,-

I l-l THIS TRANSCRIPT WAS PREPARED TROM A CLIENT-FUkNISHEL. UNFONITORED TAPE RECORDING 9

kn

l l

1 1

TAPE No. 850/851, SIDE A 2

SEABROOK CONTROL ROOM /TRED ANDERSON, JR.

3 START TIME:

2251 4

DECEMBER 18, 1989 5

6 SPEAKER:

The date is 12/18.

The time is 10:52 7

p.m.

8 VOICE:

Tim, come up.

9 (Transmission noise.)

10 VOICE:

Jeff, what's your location?

11 (Transmission noise.)

12 VOICE:

Are you watching those cycle

[ inaudible).

13 (Transmission noise.)

14 VOICE:

Okay, thanks, Jeff.

35 (Pause.)

16 (Transmission noises) 17 VOICE:

(Inaudible).

10 (Transmission noise.)

19 1?OICE:

Copy, Jef f.

20 Hr.va you got A guesstimate on how nuch flow?

21 (Transmission noise.)

22 VOICE:

Copy.

23 Is that coming out of the service water piping, 24 Jeff, or the circ water piping?

25 (Transmission noise.)

l

a I'

1 VOICE:

The pipe on the side.

The real big, big 3

2 pipe or the not so big pipe?

3 (Transmission noise.)

4 (Pruse.)

5 (Transmission noise.)

6 VOICE:

Hey, Jeff, are you still on top up there?

7 (Transmission noise.)

8 VOICE:

Keep looking down, Jeff.

We think we've 9

got a valve up here that might be a little open.

10 (Transmission noise.)

11 OICE:

We don't seem to be getting any more out 12 of that valve, but if you could go into the discoarge 13 structore house and see if you could manually operate it, 14 it would be cire water valve three, eight.

See if you can 13 tycle that valve manually a little closed, please.

I 16 (Transmission noise.)

t 17 VOICE:

Correct.

18 (Trar.stalasion poise. )

19 iTranLvission noise.)

20 TPause.)

21 VOICE:

Tim, come up.

22 (Pause.)

23 VOICE:

Jeff, I'm going to assume you can hear 24 me, but I can't hear you.

So, I'm going to stroke the 25 valve about ten percent open here in about 20 seconds.

So,

E l

,I '

o i

3 i

l' if you could position yourself by the valve, I'll stro):o it i

2 ten percent open and then closed.

3 (Pause.)

4 VOICE:

I'm finished cycling the valve, so if you i

5 could get to a phone.

6 (Pause.)

Y (Transmission noise.)

8 (Transmission noise.)

9 (Transmission noise.)

10 (Transmission noise.)

11

[ Transmission noise.)

12 (Transmission noise.)

13 (Transmission noise.)

14

['iransmission noite.)

15 VOICE:

Go ahead, Pet.

16 (Transmission noise.)

17 VOICE:

Thank you, Pat.

18 (Pause.)

7.9 VOTCS

Tiu, come up.

20

{Peuse.)

21 VOICE:

Would you increase service water flow to 22 the SCC heat exchangers, please, j

23 (Pause.)

24 VOICE:

Pat Leary, come up.

l' 25 (Transmission noise.)

l

b 4

1 VOICE:

Pat, would you increase the service water j

2 flow to the SCC heat exchangers, please.

3 (Transmission noise.)

4 (Pause.)

5 VOICE:

This is the control room.

6 (Pause.)

7 VOICE:

Our indication up here hasn't changed a t

8 lot, Pat, but we'll just hold off here and see if we've got 9

an indication of -- have you been up to see how much water 10 is still pouring out?

11 (Pause.)

12 VOICE:

Just hold on a second, Pat.

13 VOICE:

Juff (inaudible), cona up.

14 (Transmission noine.)

'15 VOICE:

J e f t',

have you still got an indication 16 that you're filling those lines?

17 (Transmission noise.)

18 VOICE:

So, we do seem to be making progress "J 9 then; correct?

20 (Transmission noise.j i

21 VOICE:

Okay, Pat, we'll just give up here.

As 22 long as we've got air coming out the vent, we must be

]

23 filling.

1 24 (Pause.)

l i

25 (Transmission noise.)

V~"

5 l

1 (Pause.)

i 2

(Transmission noise.)

3 (Pause.)

4 (Transmission noise.)

5 (Pause.)

6 VOICE:

Gay it again, control.

The high 7

temperature SCCW alarm has reset at this time.

8

[ Transmission noise.)

9 (Pause.)

10 VOICE:

(Inaudible), control.

11 (Pause.)

r 12 (Transmissior, noise.)

13 VOICEt Sem, this is Neal.

14 I'n getting ready to shut down the VAB 15 ventilation and the on1'J thing I need you to do is to 16 reposition damper 1003 to the field handling position.

17 That's the damper by the intake filtern for the PAB.

38 (T nraswission noise.)

19 VOICE:

Cory.

20 When you get there, let me know and I'll start 21 shutting things down.

22

[ Transmission noise.)

23 (Pause.)

24 (Transmission noise.)

25

[ Transmission noise.)

i l

s,..

n L

6 1

VOICE:

Copy,.1003.is closed.

The ventilation 2

. stands are shut down.

The enclosure ventilation fan is on e

i:

b 3-recire.

I'll shut that down a little bit'later.- I'll let 4

you know when that occurs.

5 (Transmission noise.)

6 (Transmission noise.)

7 (Pause.)

8:

VOICE:

Damper 1003 in the. fuel handling I

91 position.

j 10 (Transmission noise.]

i 11 (Transmission noise.]

l 12 (Pause.)

l l

1 13-VOICE:

That would be the correct position..

t 14 (Transmission noise.]

I

(,

15 VOICE:

Copy.

l 16 (Pause.)

l^

\\

i 17 (Transmission noise.)

i li 18 VOICE:

L'ome in, John.

j i

i l

19 (Transmission noise.)

l I

20 VOICE:

Just write them down and bring them up 21 later, okay.

i 22 (Transmission noise.)

j l-23 VOICE:

[ Inaudible), John.

24 (Pause.)

i 25 (Transmission noise.)

E

-l L

7 L

j 1

(Pause.)

"l 2

VOICE:. Come up.

L' 3

[ Transmission noise.)

l 4

4 VOICE:

I just got the low SCCW temperature alarm s

5 in.

l 6

(Transmission noise.)

t 7

(Pause.)

8 VOICE:

Sam, come up.

9 (Transmission noise.)

i 10 VOICE:

Jeff, when you went out to look for the 11 leaky valve _in the circ water system, did you look in both 12

'the intake and the discharge structures or did you only 13-look-in the discharge structure?

14-

[ Transmission noise.)

1 15 VOICE:' Okay, Jeff, thanks, o

16-VOICE:

Pat-and Larry, come up.

17-(Pause.)

18-VOICE:

Where are you, Pat?

19 (Pause.)

20 VOICE:

Would you swing over to the intake 21 structure and take a peak down in there and see if we're 22 blowing water through?

23 (Pause.)

24 VOICE:

Correct, Pat.

l 25 We're losing in the discharge structure, but l

r.

e"-

8

(:-

.7 1.

we're not' making any more progress here.

Hopefully, maybe 2

we're blowing a lot out with the intake and.you can-tighten 3'

up that a little bit.

4

'[ Pause.)

l i

5 (Transmission noise.)

6 (Pause.)

7 VOICE:

All right, John.

8' (Transmission noise.)

9 VOICE:

Copy, John.

10 Go ahead and open a breaker for 180-A.

11 (Transmission noise.)

12 VOICE:

Copy.

13 In about 30 seconds, I'll be ready for 31-Alpha.

14

[ Transmission noise.)

L 15 (Pause.)

L=

16 VOICE:

Ready for 31-Alpha.

17 (Transmission noise.)

18 (Transmission noise.)

19 VOICE:

Copy.

L 20 (Pause.)

21 (Transmission noise.]

22 (Transmission noise.)

23' (Transmission noise.)

24 (Pause.)

25 VOICE:

Sam (inaudible), control.

l l

s 9

i 1

(Transmission noise.)-

l I

2 VOICE:

Do you have a field storage building 3

temperature?

4

[ Transmission noise.)

5 VOICE:

Copy.

l 6

(Pause.]

[

VOICE:

Sam, control.

8-(Pause.)

9 VOICE:

They are closing up some more on the circ 10 water valves.

We need you to go up to the vent by the a

11 water boxes, to see if you got some_more air blowing out.

12

.(Pause.)

13 (Transmission noise.)

14-VOICE:

Control, go ahead.

15.

(Pause.)

16 VOICE:

You want us to_go open on momentarily?

17

[ Pause.)

18 VOICE:

You're breaking up.

Did you say circ 19 water valve three, nine?

20

-(Transmission noise.]

^

21-VOICE:

Circ water valve three, eight.

L 22 (Pause.)

l~

23 VOICE:

So, we go momentarily open on circ water l-l 24 valve three, nine -- excuse me -- three, eight and then go l

25 back to close?

l l

l i

b

'10 1

(Pause.)

2 VOICE:

[ Inaudible), control.

3

[ Pause.)

4 VOICE:

You want us to go open momentarily on 5

three, eight and then go back to closed, correct?

6 (Pause.)

7 VOICE:

Mark, I couldn't make out your 8

transmission.

9 (Pause.)

10 VOICE:

Mark, I'm going to do it at this time.

11 (Pause.)

12 VOICE:

I went to open momentarily _on three, 13 eight.

Did you hear anything?

14 (Pause.]

15 VOICE:

McCarthy, come up.

16 (Pause.)

17 VOICE:

Greg, we are making headway on this fill.

l l

18 Jeff Kim reports that we have water on the inlet side now 19 of the condenser, the water box.

20

[ Pause.)

I 21 VOICE:

Come up.

22 VOICE:

Go ahead, Mike.

23 VOICE:

Just for your info, we picked up the 24 discussing hot water expansion tank pressuro low.

25 VOICE:

Waste process.

1

~

1 i

l

g 3y l'

VOICE:~ That's correct.

2 VOICE:

Okay,=thanks, Mike.

3 (Pause.)

-4 VOICE:

Larry, come up.

5 (Pause.)

6 (Transmission noise.)

7 (Pause.]

8 (Transmission noise.)

4 9

(Transmission noise.)

10 (Pause.)

Il (Transmission noise.)

12 VOICE:

[ Inaudible), come up.

1

.l 13 (Pause.)

14 (Transmission noise.)

15 VOICE:

John, if you can hear me,_you're coming 16 in with static.

Call Pat Leary at 3937.-

17

[ Transmission noise.)

18 (Pause.)

19 (Transmission noise.)

20

[ Pause.)

21-VOICE:

Finnegan, come up.

22 (Transmission noise.)

23 VOICE:

All right, I think we're going to shift l

l 24 gears a little bit on this circ water filling vent.

We may 25 finish off with [ inaudible) filling vent.

l

[ w'

]

a

+_

12 1

Would.you give.me a. call, please, 3380..

2 (Transmission' noise.)

3 (Pause.]

4 (Transmission noise.]

5 (Pause.)

6 (Transmission-noise.)

7 (Pause.]

8 VOICE:

(Inaudible), come up.

9 (Pause.]

10 VOICE:

(Inaudible), come up.

l i-l 11

[ Transmission rioise.)

12 VOICE:

John, I've got that tag-out for battery I

l-13 charger 1-Delta.

i.

l-14 (Transmission noise.)-

15 VOICE:

You can send it on the elevator.

-16 (Transmission noise.]

l 17~

(Pause.)

18' VOICE:

John, the elevator is broke.

l-19 (Transmission noise.]

1 20 (Pause.]

21 VOICE:

Control.

(

22 (Pause.)

l 23 VOICE:

(Inaudible), are you up at the fire pump i-24 house?

l 25 VOICE:

Okay, because the fire pump house low

r-c j

' 4, (

13-1

~

J..

1 temperature alarm just reset..

t II L

2-(Pause.)

l 3

VOICE:

Copy.

4 I thought-you might have been out there making it j

I 5

work.

6 (Pause.)

7 VOICE:

(Inaudible).

-8

[ Pause.)

9

[ Transmission noise.]

l l

10 VOICE:

Copy.

11 (Transmission noise.)

12 (Pause.)

13 VOICE:

Sam, come up.

14 (Pause.]

15' VOICE:

Did you~ever get the feed pump lube oil 16 purifier going?

17 (Pause.]

I' 18 VOICE:

Okay, Jeff.

l.

19 Would you turn that over to your relief to light 20 that off on the A-main feed pump sump.

21 (Pause.)

22 (Transmission noise.)

23 (Pause.)

24 (Transmission noise.)

25 (Pause.)

1 e

I 14 4-1 VOICE:

[ Inaudible), this is Murray Timmons, come 2-up.

3

[ Pause.)

3; 4

VOICE:

Control room, this is Timmons.- Come u p ',

5 please.

-6 VOICE:

Timmons, go ahead.

7 1 VOICE:

Be advised, we are going to be opening a

8 hydrant on the south access road to fill a [ inaudible) 9 machine.

You'll probably get a fire pump start.

10 VOICE:

Can you hold on one second, please.

11 VOICE:

Affirmative, we will.

12 VOICE:

Who did you say this is, Timmons?

13 VOICE:

That's correct.

14

[ Pause.)

15 VOICE:

Okay, Timmons, go ahead and use that fire 16 protection hydrant to fill that roller.

17

[ Pause.)

18 VOICE:

Control, this is Timmons.

19

[ Pause.)

20 VOICE:

Control room, this is Timmons.

21 VOICE:

Go.

22 VOICE:

Are you going to advise me when I'm okay l'

23 to open a hydrant?

24 VOICE:

[ Inaudible), go ahead, Bill.

25 VOICE:

Okay, thank you.

4 4.

15.

t1 l'

(Pause.)

2 VOICE:- Go ahead.

3' VOICE:

Loud and clear.

L4-(Pause.)

5 (Transmission noise.)

6 VOICE:

(Inaudible).

I VOICE:-

Control room, go ahead.

8.

(Transmission noise.)

9 VOICE:- Loud and clear.

I 10 (Transmission noise.)

l 11 (Pause.)

12 VOICE:

Danko,-control.

13 VOICE:

Yeah, Dave, could you.tell me what SCCW 14

. header temperature:is right now?

?

15

_(Pause.]

16

~ VOICE:

When_you get a chance to'do it, I just 17-want you to know that I'd like to maintain that. temperature 18 about 80 to 85 by, you know, just adjusting your service 19 water flow at the outlet for the pony heat exchanger in 20 service.

t 21 (Pause.)

22-VOICE:

Okay, I think Mark Mc Carthy on his way l

23 out might have kicked it in one notch.

24 (Pause.)

25 (Transmission noise.)

L

1 p,

4 16 I

j S-1

.[ Transmission noise.)

2' VOICE:

Okay, Rex.

3=

(Transmission noise.)

4 VOICE:

Copy, Rex..

5-(Pause.);

6' VOICE:

Hugh Hawkins, control room.

7-(Transmission noise.)

8 VOICE:

I've got the oil water (simultaneous 9

transmissions).

L 10 VOICE:

Rick Escanio, control room.

11 ICB-124 is [ inaudible) tank level high alarm is 12 in.

Please check that out.

13 (Transmission noise.)

14 VOICE:

Copy, Hugh.

15.

I've got the oil water separator.

Number one 16 trouble oil water separator holding tank high alarm, please 17 check that out.

18 (Transmission noise.]

19 VOICE:

Okay, you're right, Hugh.

I'll have 20 somebody else go out there and take a look at that.

Thank

.21 you.

22 (Transmission-noise.)

23 (Transmission noise.]

24 VOICE:

Go ahead, Rick.

25 (Transmission noise.]

h (;'

17 s

):

0 1

' VOICE:

Complete.

3

2' (Transmission noise.]

~3-

{ Pause.]

4 (Transmission noise.]

5 (Paune.]

6 VOICE:

Come up.

7 (Pause.]

r 8'

VOICE:

Dave, go ahead.

9 (Pause.]

10 VOICE:

Go ahead.

11 VOICE:- Tom, I'd like you to.open RMW -- I'd liko 12 you to close.RMW valve 19 and shut off the RMW tank recirc.

13 When you get down in that area, you can shut that: valve and 14' -

let me-know when you do it.

15

[ Pause.]

-16

[ Transmission noise.]

17-VOICE:

Control-room.

18 (Transmission noise.]

19 VOICE:

Yes, I've got somebody on the.way now.

20 (Transmission noise.]

21 (Pause.]

22 VOICE:

Hawkins, this is the control room.

23 The oil water separator alarms have both cleared.

24-

[ Transmission noise.]

25 (Pause.]

<-d-a t

-18 N-1 VOICE:' Danko, control room.

2 (Pause.)

~

3-VOICE:

You have verified, have you not, that

-4 both main feed pump A and B are on the turning gear, right?

5

'[ Pause.)

6 VOICE:

Say again, please.

7

[ Transmission noise.]

8 (Pause.)

9 (Transmission noise.)

j 10 (Pause.)

1 11 VOICE:

Hawkins, control.

12 (Pause.]

13 VOICE:

[ Inaudible) Danko, control.

)

14 (Pause.)

15 VOICE:

(Inaudible), come up.

16 (Pause.)

l 17 VOICE:

Fanning, control.

(

18 (Pause.)

1 r

L 19 VOICE:

Control.

. 20

      • END TAPE 850/851, SIDE A.

SIDE B IS BLANK.***

~!