ML20012C783

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/90-05 on 900201-28 & Notice of Violation.Nrc Concerned That Personnel & Procedural Deficiencies Resulted in Unavailability of Turbine Driven Auxiliary Feedwater Pump
ML20012C783
Person / Time
Site: Wolf Creek 
Issue date: 03/16/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20012C784 List:
References
NUDOCS 9003230211
Download: ML20012C783 (4)


See also: IR 05000482/1990005

Text

-

-

-

-

-

j.

.

t

m,

x

!

h[ 7,f*

.,,.(

f

~

3

~

.-

,,

'

g

-

MR16 WOL

.

-

L

, In Reply Refer To:.

s

,

n

Docket: STN 50-482/90-05

,

,

'

<

b,

,

.

L

Wolf Creek Nuclear Operating Corporation

. ATTN: Bart D. Withers

"

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

e

Gentlemen:>

p

This refers to the inspection conducted by Messrs. M. E. Skow, B. L. Bartlett,

J

and R. A. Caldwell of this office during the period February 1-28, 1990. -This

.

inspection pertained to activities authorized by NRC Operating License

No. NPF-42 for the Wolf Creek Generating Station, and our findings were

!

.

.

discussed with you and other members of your staff at the conclusion of the

-'

inspection.

Areas examined during the inspection included plant status, operational safety

verification, monthly surveillance observation, monthly maintenance

'

observation, onsite followup of an event at' operating power reactors, follownp

of previously identified'NRC items, and review of licensee event reports.

Within these areas, the inspection consisted of selective examination of

procedures and' representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

The NRC staff is concerned that personnel and procedural deficiencies resulted

in the unavailability.of the turbine driven auxiliary feedwater pump. Proper

management controls should provide assurance that licensed operators are

cognizant of each-applicable system status prior to assuming shift

responsibilities.

.

During this inspection, it was found that certain of your activities were in

violation of- NRC requirements.

Consequently. you are required to respond.to

these. violations, in writing, in accordance with the provisiuns of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

9003230211 900316

Q

PDR

ADOCK 05000482

q

O

PDC

j

Y

W

W

ha

R : SRI-

ffSRI

AC:0RP/D

DRSS M

BLBartlett

MESkow

llins DPowers

MESkow;sa

40

3//3/90'

3/0/90

3/4 /90

90

3/13 /90

I

'\\\\

-

..

. - .

.

1

_ . ..

I

3, .; .

, ,4:

~..

..

l

. Wolf Creek Nuclear Operating

-2-

Corporation.

i

'

,

'Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

!

Sincerely,

'

Original Signed By:

Samuel J. Collins

L

. Samuel J. Collins, Director

Division of Reactor Projects

Enclosures:

Appendix A

Notice of Violation

Appendix B-- NRC Inspection Report

50-482/90-05

,

cc w/ enclosures:

Wolf Creek Nuclear Operating Corp.

1

ATTN: _ Gary Boyer, Plant Manager-

P.O. Box 411-

Burlington, Kansas 66839-

Shaw, Pittman, Potts & Trowbridge

ATTN: Jay S11 berg, Esq.

1800 M Street, NW

Washington, D.C.

20036

Public Service Commission

ATTN: Chris R. Rogers, P.E.

Manager, Electric Department

P.O. Box 360

Jefferson City, Missouri 65102

'

U.S. Nuclear Regulatory Commission

ATTN: Regional Administrator, Region III

799 Roosevelt Road

Glen Ellyn, Illinois 60137

Wolf Creek Nuclotr Operati.ng Corp.

ATTN: Otto Maynard, Manager

Regulatory Services

P.O. Box 411

s

l

Burlington, Kansas 66839

p

l

l

'

.

.

.

-

-

- --

- ---

fim--

~

orq

_ 'n - ,+

. . .

.,

"'

'

t

..

2

. . . .

.!

< .*-

it :

"'

Wolf Creek Nuclear Operating

-3--

'

'

Corporation

>

~

r

-.

Kansas Corporation Commission

ATTN
: Robert Elliot, Chief Engineer

!

Utilities Division

~ 4th Floor'- State Office Building -

'

-

Topeka, Kansas - 66612-1571-

0ffice of the Governor

,

State of Kansas

t

Topeka, Kansas f66612-

,

-Attorney General _

.

1st Floor - The Statehouse'

^

. Topeka, Kansas :66612

j

4

Chairman, Coffey County Commission

~Coffey County Courthouse

Burlington, Kansas . 66839

Kansas Department of Health

-and. Environment-

'

Bureau of Air Quality & Radiation-

-

control

ATTN
Gerald Allen, Public

Health Physicist

. Division of Environment

Forbes Field Building 321-

>

3

Topeka,-Kansas- 66620

t

U.S. Nuclear Regulatory Commission

1

. ATTN:

Senior Resident Inspector

~

P.O. Box'311

Burlington, Kansas 66839

U.S. Nuclear Regulatory Commission

.

ATTN

Regional Administrator, Region.IV

'

611 Ryan Plaza Drive, Suite 1000

' Arlington, Texas 76011

bec:

(see next page)

,

.

--

-- -

- - -

,; ;

-

-y

.

-

.

,

< s1

-

.l,- {: .,'_ ~

a

,

(,

.

. . -

1

,

'

.l

,

,

4

'

- . .

-

.

.

)

f Wolf Creek Nuclear Operating

-4-

~1

,

'

Corporation

,

n

N bec to DMB (IE01)--

bec distrib. by RIV:

+

.

  • R. D. Martin, RA

' *Section Chief (DRP/D)-

DRP

.*RPB-DRSS

'

R. DeFayette, RIII

  • RIV File

SRI Callaway, RIII

,

- Project Engineer, DRP/D.

  • DRS'
  • MIS System
  • RSTS Operator
  • L.-Shea,RM/ALF

,

  • SRI, Wolf Creek

v

  • D. V. Pickett, NRR Project Manager (MS:

13-D-18)

  • R. A. Caldwell

o.

D. Powers

t

  • w/766

'!

' i

I

\\

9

.r

-

,

-

-