Text
__
L
![...a UNITED STATES
+
NUCLEAR REGULATORY COMMISSION n
t WA6HINGTON, D. C. 20666 i
l o
YANKEE ATOMIC ELECTRIC COMPANY DOCKET-NO.50-029 YANKEE NUCLEAR. POWER STATION r
AMENDMENT.TO FACILITY OPERATING LICENSE i
i Amendment No.131 License No. DPR-3 i
1.
The Nuclear Regulatory Comission (the Comission or the NRC) has found that:
A.
The application for amendment filed by Yankee Atomic Electric Company (the licensee) dated January 18, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance: (i)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been shtisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. OPR-3 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.131, are hereby incorporated in the license.
The licensee shall operate the f acility in accordance with the Technical Specifications.
l 9003230040 90o319 fDR ADOCK 05000029 Q l
FDC b.-
a
i 2
I 3.
This license amendment is effective as of August 1,1990.
FOR THE NUCLEAR REGULATORY COW.lSSION A lk NM
~ e
- Richard H. Wessman, Director J
Project Directorate I.3
~
Division of Reactor Projects 1/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuence:
March 19, 1990 1
+
5
i ATTACHMENT TO LICENSE AMENDMENT NO.131 FACILITY OPERATING LICENSE NO.-DPR.3 00tKET.NO. 50 029 l
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and i
contain vertical lines indicating the aret of change.
Remove Insert 3/4 5 4 3/4 5-4 3/4 5 6 3/4 5 6
~
3/4 5 6a*
3/4 5 7 3/4 5-7 3/4 5 7a*
3/4 5 8 3/4 5 8 1
W P
- Denotes new page
l l-i a_,
.,',4
+
v
,6..
t 4
k j
RURDEftfAMPE REDUTREMENTE 4.5.2 Each ECCS safety injection subsystem, the recirculation subsystem, and l
the long-term hot leg injection subsystem shall be demonstrated OPERABLEt a.
At least once per 31 days on a STAGGERED TEST BASIS by:
1.
Verifyiag that each high pressure safety injection pumpt a)
Starts (unless already operating) from the control room.
b)
Develops a discharge pressure of 1850 psig on recirculation flow to the safety injection tank.
c)
Operates for at least 15 minutes.
2.
Verifying that each low pressure safety injection pumpt a)
Starts (unless already operating) from the control room.
b)
Develops a discharge pressure of 1 250 psig on recirculation flow through CS-MOV-532.
c)
Operates for at least 15 minutes.
b.
At least once per 31 days by:
1.
Verifying that the following valves are in the indicated positions with power to the valve operators removed by opening at least two breakers in series:
Valve Number Valve Function Valve Position a.
CH-MOV-522 a.
Charging Header /LPSI a.
Closed Isolation YANKEE-ROWE 3/4 5-4 Amendment No. 35, 52, #7, /(Jb',131
,M
..s
~
.v s
+
i t
EMERGENCY CORE COOLING SYSTEMS c.
SURVEILLANCE REDUIREMENTS (Continued) 3.
Verifying that the following valves are in their normally closed position with power to the valve operator removed by disconnecting the power cables as they leave the motor starter Valve Number Valve Function b.
CS-MOV-534 LPSI Pump Header Isolation Valve Bypass 4
Verifying that the following valves are in their normal position with power to the valve operator motors separated by dual contactors from the motor control centers Normal Valve Number Valve Function Position a.
CS-MOU-532 LPSI Recirculation Line Closed b.
CS-MOV-533 LPSI Pump Header Isolation Open c.
CS-MOV-535 LPSI Pump Header Isolation Open i
d.
SI-MOV-516 HPSI and LPSI Pump Header Suction Isolation Open e.
SI-MOV-48 HPSI and LPSI Minimum Recirculation Line Open f.
SI-MOV-49 HPSI and LPSI Minimum Recirculation Line Open g.
SI-MOV-515 Hot Leg Injection Isolation Closed i
h.
SI-MOV-514 Hot Leg Injection Isolation Closed l
- i. SI-MOV-516 V.C. Sump Isolation Closed J.
SI-MOV-517 V.C. Sump Isolation Closed k.
SI-MOV-46 HPSI Isolation Open i
1.
SI-MOV-4 LPSI Pump Crossover to HPSI Pump Open m.
CS-MOV-536 SI Header Isolation to Cold Leg Open n.
CS-MOV-537 SI Header Isolation to Cold Leg Open i
o.
CS-MOV-538 SI Header Isolation to Cold Leg Open l
p.
CS-MOV-539 SI Header Isolation to Cold Leg Open l
q.
MC-MOV-301 MCS Loop Isolation Open L
r.
MC-MOV-302*
MCS Loop Isolation Open s.
MC-MOV-309 MCS Loop Isolation Open p
t.
MC-MOV-310*
MCS Loop Isolation Open l-u.
MC-MOV-318*
MCS Loop Isolation Open v.
MC-MOV-319 MCS Loop Isolation Open w.
MC-MOV-325 MCS Loop Isolation Open x.
MC-MOV-326*
MCS Loop Isolation Open
- In Modes 2, 3*,
4*, $*, MCS loop isolation valves are required to be closed for main conlant pump (s) starting. After the pump (s) have been started, the valve (s) shall be reopened.
1 l
YANKEC-ROWE 3/4 5-6 Amendment No. #f, 52, 69,(T. pyr,131
i' *'
, +..,
i :2 's 4.
EMERCENCY CORE C001,ING SYSTEMS EURVEfLLANCE troUf REMENTS (continued) y.
SI-MOV-519 HPSI Flow Control Open z.
SI-MOV-520 HPSI Flow Control Closed aa. CH-MOV-524 Charging Line Isolation Open bb. CE-MOV-550 charging Line Isolation open Note: CS-MOV-532 may be opened for 1120 minutes per week for safety injection tank mixing or low pressure safety injection pun:p testing.
YANKEE-ROWE 3/4 5-6a Amendment No. 131
Y ;[:,u.,
- .=--
'.. ; ^l ' ' ' ?
~.
.m 9',
4 l,
EMERGENCY CORE COOLING SYSTEMS i
EURVE111.ANCE REQUIREMENTS (Continued) 5.
Verifying that each ECCS safety injection subsystem is aligned to receive electrical power from an OPERABLE emergency bus.
6.
Verifying that each pair of ECCS recirculation subsystem redundant valves is aligned to receive electrical power from separate OPERABLE buses.
7.
Verifying that each pair of ECCS long-term hot leg injection subsystem redundant valves is aligned to receive electrical power from separate OPERABLE buses.
8.
Verifying that the charging header flow metering instrument is OPERABLE by observing charging flow rate at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
9.
Verifying that the redundant HPSI header isolation / flow control valves are aligned to receive electrical power from separate OPERABLE buses.
- 10. Verifying that the redundant charging line isolation valves are aligned to receive power from separate OPERABLE buses.
- 11. Verifying that redundant pressurizer auxiliary spray flow control valves are aligned to receive power from separate OPERABLE buses.
By a visual inspection which verifies that no loose debris (rags, c.
trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:
1.
For all accessible areas of the containment prior to establishing containment integrity, and 2.
Of the areas affected within containment at the completion of each containment entry when containment integrity is established.
d.
At least once per 18 months by visual inspection of the containment sump and verifying that the subsystem suction inlets are not restricted by debris and that the sump components (trash racks, screens, etc.) show no evidence of structural distress or corrosion.
e.
At least once per 18 months, during shutdown, by:
1.
Cycling each power-operated valve in the flow path through at least one complete cycle of full travel.
2.
Verifying that valve CS-MOV-532 actuates to its correct position on a safety injection signal.
YANKEE-ROWE 3/4 5-7 Amendment No. 5 2, f'7',,B2'. 131 i
i e
- ; G. ;, ' b.', 'r
.e L :,-(,d t ;--
L,'
1 EERCENCY CORE COOLING SYSTEMS SURVEIiTAWEE REQUIREMENTS (Continued) 3.
Verifying that each of the following pumps start automatically upon receipt of a safety injection signals (a) High Pressure Safety Injection (HPSI) pump (b) Low Pressure Safety Injection (LPSI) pump v
i l
t l
l YANKEE-ROWE 3/4 5-7a Amendment No.
131
.e.
.. <., 7; 1,
EMERGENCY CORE COOLING SYSTEMS SURVEfft1NCE REQUIREMENTE (Continued)
I 4.
Verifying the proper positioning of hot leg injection throttle valve SI-V-645.
5.
Verifying that each charging pump stops automatically upon receipt of a safety injection signal.
6.
Verifying that the charging header flow metering instrument is OPERABLE by performing a CHANNEL CALIBRATION.
7.
Verifying the proper positioning of the HPSI throttle valves SI-V-671, 672, 673, and 674 by performing an inspection to ensure thatt (a)
Each valve locking device is in place and securely welded to the valve handle and to the valve yoke.
(b)
The scribe mark on each valve body aligns with the scribe mark on the valve yoke.
f.
During shutdown following completion of the modifications to the ECCS subsystems that alter the subsystem flow characteristics and/or any time either test under 4.5.2.e.7 is f ailed, by developing a backpressure of 875 psig in the high pressure safety injection header with two HPSI pumps operating as follows:
1.
Pressure to the suction of the HPSI pumps to be 170 + 10 psi.
2.
LPSI flow is isolated.
3.
Injection flow is to one loop with the other loops isolated by closing the appropriate injection gate valves CS-MOV-536, CS-MOV-537, CS-Mov-538, and CS-MOV-539.
4 The flow to the injection loops shall not be less than 200 gpm.
5.
The above test shall be repeated to include the operation of all HPSI pumps.
g.
During shutdown following completion of modifications to the ECCS subsystems that alter the subsystem flow characteristics as follows:
1.
For the Low Pressure Safety Injection (LPSI) pumps, verify that all combinations of two pumps develop a combined flow 1 2180 gpm.
2.
For the hot leg injection line, verify the proper positioning of throttle valve SI-V-645 by flow testing.
3.
For the pressurizer auxiliary spray line verify system performance by flow testing.
AmendmentNo.f,h,83,JgT,131 f
YANKEE-ROWE 3/4 5-8
!