ML20012C322

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/90-04 on 900205-09.No Violations or Deviations Noted
ML20012C322
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/06/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20012C323 List:
References
NUDOCS 9003210032
Download: ML20012C322 (3)


See also: IR 05000302/1990004

Text

II

L

, ,.

.

.

.

t

N

l

mrch 6,1990

Docket No. 50-302

License No. DPR-72

. Florida Power Corporation

Mr. Percy M. Beard, Jr.

t.

.

l

Senior Vice President, Nuclear

'

Operations

ATTN: Manager, Nuclear Operations

Licensing

'

P. O. Box 219-NA-21

Crystal River, FL 32629

Gentlemen:

!

SUBJECT: NRC INSPECTION REPORT NO. 50-302/90-04

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

C. Smith on February 5-9, 1990. The inspection included a review of activities

authorized for your Crystal River 3 facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

-

identified in the enclosed Inspection Report.

,

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

!

In accordance with Suction R.700 of the NRC's Rules of Practicts," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NkC Fublic Document Room.

Should you have ony questions concerning this letter, please contact us.

Sincerely,

(ORIGINAL SIGNED BY C. A. CAS'IO FDR)

Thomas A. Peebles, Chief

,

Operations Branch

Division of Reactor Safety

.

Enclosure:

NRC Inspection Report

(cc w/enci - See page 2)

9003210032 900306

PDR

ADOCK 05000302

o

F,DC

h

l

~'

.

.

'

.

,

'

y

.

.

Florida Power Corporation

2

March 6, 1990

'

(cccont'd)

Gary L. Boldt

Vice President, Nuclear Production

Florida Power Corporation

P. O. Box 219-SA-2C

Crystal River, FL 32629

P. F. McKee, Director

Nuclear Plant Operations

Florida Power Corporation

P. O. Box 219-NA-2C

Crystal River, FL 32629

R. C. Widell, Director

Nuclear Operations Site Support

Florida Power Corporation

P. O. Box 219-NA-21

Crystal River, FL 32629

A. H. Stephens

General Counsel

Florida Power Corporation

MAC - A5D

P. O. Box 14042

' St. Petersburg, FL 33733

.

Attorney General

Department of Legel' Affairs

Tbs Capitol

Tallahassee, FL 32304

Jacob Daniel Nash

Oftlee of Radiction Control

Department of Heelth and

R2habilitative Settices

1317 Winewood Boulevard

Tallahassee, FL 32399-0700

Administrator

Department cf Environmental

Regulation

' Power Plant Siting Section

State of Florida

2600 Bleir Stone Road

Tallahassee, FL 32301

State Planning and Development

Clearinghouse

Office of Planning and Budgeting

Executive Office of the Governor

The Capitol Building

Tallahassee, FL 32301

(cc cont'd - See page 3)

I

-

.

.

.

i

'

l

Florida Power Corporation

3

March 6, 1990

1

(cccont'd)

Chairman

Board of County Comissioners

>

.

Citrus County

!

110 N. Apopka Avenue

>

'

Iverness, FL 36250

!-

Robert B. Borsum

-

Babcock and Wilcox Company

3f-

Nuclear Power Generation Division

1700 Rockville Pike Suite 525

Rockville MC 20852-1631

-

<

State of Florida

bec w/ enc 1:

A cument Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

15760 W. Power Line Street

<

Crystal River, FL 32629

R. Moore, DRS/0B

P. Fillion, DRS/EB

r.

,

!

RII:DR

RII:D

RII:DRS

RII:D S

RII:DR

KPo tner

ght

h

FJap

PFr

Err l ' CNb'M <

f

-QJ/ /90

p)//90

02/p/90

02/ /90

OJ//90

7

RII:DRS

gwW (u

-f4 TPeebles

D

,

1

05/5/90

'

e

l

l

N