Forwards Safety Insp Rept 50-336/89-24 on 891205-900119 & Notice of Violation
ML20012C271
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/09/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20012C272 List:
References
NUDOCS 9003200425
Download: ML20012C271 (3)


See also: IR 05000336/1989024

Text

,

y

%%

-

MR 0 91930

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN: Mr. . Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

'

P.O. Box 270

Hartford, Connecticut

06141-0270

Gentlemen:

Subject: NRC Region I Inspection No. 50-336/89-24

This refers to the routine resident safety inspection condv ced by

Mr. P. Habighorst of this office on December 5,1989 - January 19, 1990, at

Millstone Nuclear Power Station, Unit 2, Waterford, Connecticut, of activities

authorized by NRC License No. DPR-65 and to the discussions of our findings

held by Mr. Habighorst with Messrs. S. Scace and J. Keenan of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

inspection report which is enclosed with this letter. Within these areas, the

inspection consisted of observation of activities, interviews with personnel,

measurements and document reviews.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth-in the

Notice of Violation enclosed herewith as Appendix.A.

The licensee-identified

violation involved operation of the facility in cold shutdown for a period of

29 hours3.356481e-4 days <br />0.00806 hours <br />4.794974e-5 weeks <br />1.10345e-5 months <br /> without an operable containment gaseous and particulate radiation

monitor. You reported this event in Licensee Event Report (LER)89-009.

This

violation has been categorized by severity. level in accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy). You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

In review of the apparent violation, NRC inspection identified two deficiencies

not recognized or reported in LER 89-009; specifically, the failure to identify

an-additional technical specification limiting condition for operation appli-

cable to the event; and secondly, an inaccurate time interval for the

out-of-service radiation monitors. Our independent review determined that a

plant vulnerability existed based on plant decay heat rate and reduced

inventory operation at the time of the event. Therefore, in your response to

this letter .you are requested to address LER accuracy and your assessment of

plant vulnerability during the event.

OFFICIAL RECORD COPY

IR MILL 2 89-24 - 0001.0.0

03/08/90

g

9003200425 90030p

,

PDR

ADOCK 05000336

0

PDC

l {

}

7

'

N

- %) ,

.

g

L

Northeast Nuclear Energy Company

2

i

L

With regards to matters discussed in section 8.3 of the enclosed inspection

report regarding LER 89-011, we are concerned about the apparent untimely

notification and reporting of the incorrect location of the air supply check

valve for a service water isolation valve.

The deficiency was identified on

September 6,1989, but the event was not reported until. January 5,1990. You

are requested to respond to this concern.

Please submit to this office, within

thirty days of the date of this letter, a written explanation in reply,

including; (1) your assessment of when the service water system deficiency

should have been reported and (2) the steps which have or will be taken to

assure timely notification and reporting of events or. conditions as required by

.

10CFR 50.72 and 10CFR 50.73. This response may be appended to your response to

[

a similar request for an event at Millstone Unit 3 as documented in inspection

l

report 50-423/89-23.

!

The response directed by this letter and the accompanying notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL-96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

ORIGINAL StGNED BY:

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report No. 50-336/89-24

cc w/encis:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Nuclear Station Director, Millstone Station

.J. S..Keenan, Nuclear Unit Director, Millstone Unit 2

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

4

0FFICIAL RECORD COPY

IR MILL 2 89-24 - 0001.1.0

11/29/80

._

___

_ _ _ _ _ - _ _ - _ _ - _ _ - _ _ _ _ _ - _ - . _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ .

w,

.. _ .;n ,

.

-

. .

Northeast Nuclear Energy Company

3

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

D. Haverkamp, DRP

J. Shediosky, SRI, Haddam Neck

P. Habighorst, RI, Millstone 2

G. Vissing, NRR/PD14

R. Paolino, DRS (See Section 6.1.1 and 8.2.1)

M. Conner, DRP (3ee Section 7.2)

R. Keimig DRSS (See Section 7.2)

,

RI:DR

RI

R

P

PH

orst/geb

WRaymond

DHa

'r

mp

Ekiger

03/3/90

03/7/90

03/I/90

03

/90

0FFICIAL RECORD COPY

IR ILL2 89-24 - 0004.0.0

03/ 8/90