ML20012C274

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 891205-900119.Violation Noted:No Containment Radiation Gaseous or Particulate Monitor Operable for Over 24 H
ML20012C274
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/09/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20012C272 List:
References
50-336-89-24, NUDOCS 9003200427
Download: ML20012C274 (1)


Text

x g

2, APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No.

50-336 Millstone Nuclear Power Station, Unit 2 License No. DPR-65 As a result of the inspection conducted on December 5,1989 - January 19, 1990, and in accordance with the " General Statement of policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy), the following violation was identified.

Plant technical specification 3.3.2.1 " Engineered Safety Feature Actuation System Instrumentation", Table 3.3-3, item 7a, requires one operable containment radiation gaseous and particulate monitor for Mode 5 (cold shutdown) plant operation.

Contrary to the above, from October 24 at 1:10 p.m. until October 25 at 6:00 p.m., no containment radiation gaseous or particulate monitor was operable in that the monitors were isolated.from the containment.

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions _of 10 CFR 2.201, Northeast Nuclear Energy Company is_

hereby required to submit to this office, within thirty days of the date of the letter which transmits this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to' avoid further violations; and, (3) the date when full compliance will be achieved. -Where good cause is shown, consideretion will be given to extending this response time.

0FFICIAL RECORD COPY IR MILL 2 89 0005.0.0 9003200427 900309 PDR ADOCK 05000336 O

PDC y

_2