2, APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No.
50-336 Millstone Nuclear Power Station, Unit 2 License No. DPR-65 As a result of the inspection conducted on December 5,1989 - January 19, 1990, and in accordance with the " General Statement of policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy), the following violation was identified.
Plant technical specification 3.3.2.1 " Engineered Safety Feature Actuation System Instrumentation", Table 3.3-3, item 7a, requires one operable containment radiation gaseous and particulate monitor for Mode 5 (cold shutdown) plant operation.
Contrary to the above, from October 24 at 1:10 p.m. until October 25 at 6:00 p.m., no containment radiation gaseous or particulate monitor was operable in that the monitors were isolated.from the containment.
This is a Severity Level IV Violation (Supplement I).
Pursuant to the provisions _of 10 CFR 2.201, Northeast Nuclear Energy Company is_
hereby required to submit to this office, within thirty days of the date of the letter which transmits this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to' avoid further violations; and, (3) the date when full compliance will be achieved. -Where good cause is shown, consideretion will be given to extending this response time.