Text
I, o
e 1' ee f
V wo N A Us.HCT MIC AND l'OWUM Ch)MPANY Itu n woun,'a unix 4 unvoi March 12, 1990 U. S. Nuclear Regulatory Commission Serial No.
90 123 Attention: Document Control Desk NO/JMJ:Jmj j
Washington, D.C. 20555 Docket Nos.
50 338 50 330 License Nos. NPF 4 NPF 7 i
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATIO;2 UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 -
for the month of February 1990.
Very truly yours,
\\L J
W. L. Stewart Senior Vice President Nuclear Enclosures L
cc:
U.S. Nuclear Regulatory Cummission 101 Marietta Street, NW l
Suite 2900 Atlanta, GA 30323
+
Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station L
1 pp L
gensnuBr'-
g b=
1
- n-
.g
- f., ;
4 i
h s*-
l.
!9' j
1 l
I i
i l
VIRCINIA POWER C(MPANY 3
NORTH ANNA POWER STATION i
MONTHLY OFERATING RE. PORT MON 11I FEBRUARY YEAR 1990 APPROVED:
i A
TA? ION MANAUL.R
' )
a e
E i
w>
OPERATING DATA REPORT e
DOCKET NO.
50-338 p
DATE 03-02-90 4
COMPLETED BY Bob Tillack TELEPHONE (703) 894-2632 OPERATING STATUS 1.~
Unit Name North Anna 1 2.
Reporting Period::
February 1990 3.
Licensed' Thermal Power (MWt):
2893 1
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 j
6.
Maximum Dependable Capacity-(Cru, MWe):
963 7..
Maximum Dependable Capacity (Net MWe):
915 8.
If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A i
- 9.. Power Level To Which Restricted. If Any (Not MWe):
F/A
- 10. Reasons For Restrictions If Any:
N/A l
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672 1416 102.468 12 Number of Hours Reactor W'.s Critical 672 1404.4 72,646.9
- 13. Reactor Reserve Shutdown Hours 0
0 6,603.6
- 14. Hours Generator On-Line 672 1382 69,876
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,943,022 3,963,662 185.854,440
~
.17.
Gross Electrical. Energy Generated (MWH) 647,855 1,319,011 61,025,833
- 18. - Net Electrical Energy Generated (MWH) 617,097 1,256.341 57,751,554 _,
- 19. Unit Set uce Factor 100-97.6 68.2 20.- Unit Availability Factor 100 97.6 68.2-
- 21. Unit Capacity Factor (Using MDC Net) 100.4 97.0 63.1
~ ~ ~
.22.
Unit Capacity Factor (Using DER Net) 101.2 97.8 62.1 123.
Unit Forced Outage Rate 0
2.4 14.1 24.
Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period. Estimated Date of Startun:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRIC 11T COMMERCIAL OPERATION
di
^(
c
/
h.
i AVERACE DAILY UNIT POWER 12 VEL DOCKET NO.
50-338 UNIT NA-1 DATE 03-02-90 t
I' COMPLETED BY Bob Tillack TELEPHONE 703-894-263:
MONTil February 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I 1
918 17 920 i
f-2 918 18 921 3
919 19 920 4
919 20 919 5
918
'21 920 6
- 919, 22 918 l
7 918 23 904 8
919 24 918 9
916 25 918 I
10 919 26 917 p.
11 919-27 918
+-
12 920-28 918 e
13 919 29 14 920 30 15 920 31
.16 919 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i1
ll
'l UNIT SRUTDOURS AllB FUWER REDUCTIONS D00GT No.
50-338 UNIT BABE North Anna 1-DATE 03-42-90 REPORT MONTH FEBRUARY 1990 C0FFLETED BY Bob T111ack TELEFRONE (703) 894-2632 No.
~ Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Boers)
Shutting Event Code Code Actice to y
4 5
Down Reactor Report #
Prevent Recurrence No Entries This Month 3
4 1
2 Exhibit F - Instructions Method:
F: Forced Reason:
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Freparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continuations (NUREG-0161)
D-Regulatory Restriction SOperator Training / License Examination S-Load Reduction F-Administrative 9-Other S
G-Operational Error (Explain)
Exhibit H - Same Source H-Other (Explain)
- :~
j' ;
' p'
(;
4 4
.t l
i.
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPI.AhATION SHEET DOCKET No.
50-338 REPORT MONTH FEBRUARY UNIT MAME MA-1 YEAR 1990 DATE 03-02-90 COMPLETED BY Bob Tillack
'No Entry This Month
U 't J t. '..
.F
'e t
d' l
NORTH ANNA POWER STATION UNIT NO.
1 MONTH FEBRUARY St99tARY OF OPERATING EXPERIENCE l
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in i
significant non-load related incidents.
DATE TIME DATA Feb ruary 01, 1990 0000 Began month with Unit at 100%, 965 MW.
February 23, 1990 0923 Commenced Unit ramp down to 90% power.ffor Turbine Valve Freedom Test.
1045 Unit stabilized at 890 MW, 90% power for Turbine Valve Freedom Test.
r 1227 Completed Turbine Valve Freedom Test satisfactorily.
1344 Commenced rampup to 100%' power.
1514 tluit stabilized atf100% power, 967 MW.
February 28, 1990 2400 Ended month with unit at 100% power, 965 MW.
p t
0 m
?7:"-
^<
4 l
C OPERATING DATA REPORT l
DOCKET NO.
50-339 DATE 03-02-90 i
i COMPLETED BY Bob Tillack
~
TELEPHONE (703) 894-2632 L.
OPERATING STATUS Eli
~
i l.
'l.
Unit Name:
North Anna 2
?
2._-Reporting Period:
February 1990 h
3.
' Licensed Thermal Power (MWt):
2893 4.
Nameplate _ Rating (Gross MWe):
947 5..
Derign Electrical Rating (Net MWe): _
907 6.
Maximum Dependable Capacity (Gross MWo):
963 i
l.
'7.
-Maximum Dependable Capacity (Net MWe):
915
- 8. ~ If Changes,0ccur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A
- 9. - Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672 1416 80,736 12.
Number of 11ours Reactor Was Critical 672 1416 65,538.1
.13.
Reactor. Reserve Shutdown Hours 0
0 5,854.9 14 Hours Generater On-Line 672 1416 64,667.9
- 15. Unit Reserve Shutdown Hours 0
0 0
16.- Gross Thermal Energy Generated (MWH) 1,941,938 4,093,387 172,239,734 17.
Gross Electrical Energy Generated (MWH) 642,525 1,353,799
__,56,359,316
- 18. Net Electrical Energy Generated (MWH) 611,908 1,289,524 54.128,356
- 19. Unit Service Factor -
100 100 80.1 20.
Unit' Availability Tactor 100 100 80.1 22. Unit Capacity Factor (Using MDC Net) 99.5 99.5 74.7 21, -
Unit Capacity Factor (Using DER Net) 100.4 100.4 74.0
- 23. Unit Forced Outage Rate 0
0 7.0 24.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITT INITIAL ELECTRICITT
(;
COMMERCIAL OPERATION
Wls s
R i
'E-l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-339 r
UNIT NA-2 i
f DATE 03-02-90 COMPLETED BY Bob Tillack TELEPHONE 703-894-2632
. MONTil FEBRUARY 1990 DAY AVERAGE DA1LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 910 17 904 2
910 18 912 3
912 19 911 4-911 20 911 5
912 21 911 6
912 22 911
~7 911 23 911 8
912 24 912 9
912 25 912 10 912 26 911 L
11 913 27 911 12 912 28 911 13 912 29 14 912 30 15 912 31 l
16 890
-INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
r
d' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET ND.
50-339 UNIT MAME North Anna 2 DATE 03-02-90 REPORT MONTH FEBRUART 1990 COMFLETED BT Bob Tillack TELEPHONE (703) 894-2632 No.
Date Type Duration Reason Met u! oi Licensee System Camponent Cause and Corrective (Bours)
Shutting-Event Code Code 3
4 5
Down Reactor Report #
Prevent Recorrence NO ENTRY THIS MONTH I
2 3
4 F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source
~
e we M
y vm.,..
-m.
...,..,~
'9 4
. ';j Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.
50-339 REPORT MONTH FEBRUARY UNIT NAME NA-2 YEAR 1990 DATE 03-02-90 COMPLETED BY Bob Tillack
. NO ENTRY TIIIS MONTH 9
4 i
4 l
1.
l
't l
,e NORTH AlntA POWER STATION UNIT NO.
2 MONTH FEBRUARY St99tARY OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in
'significant non-load related incidento.
DATE TIME DATA February 1, 1990 0000 Began Month with Unit at 100% Power, 953 MW.
February 16, 1990 1200 Commenced ramp down to 90% for-Turbine Valve Freedom Test.
1242 Unit stabilized at 875 MW, 90% pcwer for Turbine Valve Freedom Test.
1317 Completed Turbine Valve Freedom Test satisfactorily.
1505 Commenced ramp up to 100% power.
1523 Secured ramp at 95% power, 914 MW for Chemistry hold.
February 17, 1990 0426 Released from Chemistry hold, commencing-ramp up to 100% power.
0455 Unit stabilized at 100% power, 955 MW.
February 28, 1990 2400 Ended month with Unit at 100% power, 953 MW.