MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
I, o e f
1' ee ,.
V wo N A Us.HCT MIC AND l'OWUM Ch)MPANY Itu n woun,'a unix 4 unvoi March 12, 1990 U. S. Nuclear Regulatory Commission Serial No. 90 123 Attention: Document Control Desk NO/JMJ:Jmj j Washington, D.C. 20555 Docket Nos. 50 338 50 330 :
License Nos. NPF 4 NPF 7 i Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY :
NORTH ANNA POWER STATIO;2 UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 - ,
for the month of February 1990.
Very truly yours, l
\L J !
W. L. Stewart !
Senior Vice President Nuclear Enclosures ,
L cc: U.S. Nuclear Regulatory Cummission 101 Marietta Street, NW -
l Suite 2900 Atlanta, GA 30323 +
Mr. J. L. Caldwell -
NRC Senior Resident inspector North Anna Power Station L
1 pp L gensnuBr'- g b= "
1
.g . : n-
- f. , ; 4 , i h !
s*- :. .;
- l. !9' j
1 l
I i
i l
I VIRCINIA POWER C(MPANY !
3 NORTH ANNA POWER STATION i MONTHLY OFERATING RE. PORT MON 11I FEBRUARY YEAR 1990 APPROVED:
i' ATA? ION MANAUL.R
' ),
a e ;
E i
w>
OPERATING DATA REPORT e > ,
DOCKET NO. 50-338 ,
p DATE 03-02-90 4 COMPLETED BY Bob Tillack TELEPHONE (703) 894-2632 OPERATING STATUS I'
1.~ Unit Name North Anna 1
- 2. Reporting Period:: February 1990
- 3. Licensed' Thermal Power (MWt): 2893 1
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907 j
- 6. Maximum Dependable Capacity-(Cru , MWe): 963 7.. Maximum Dependable Capacity (Net MWe): 915
- 8. If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, '
Give Reasons:
N/A i
- 9. . Power Level To Which Restricted. If Any (Not MWe): F/A ,
- 10. Reasons For Restrictions If Any: N/A l
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672 1416 102.468 12 Number of Hours Reactor W'.s Critical 672 1404.4 72,646.9 '
- 13. Reactor Reserve Shutdown Hours 0 0 6,603.6
- 14. Hours Generator On-Line 672 1382 69,876
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,943,022 3,963,662 185.854,440 ~
.17. Gross Electrical. Energy Generated (MWH) 647,855 1,319,011 61,025,833
- 18. - Net Electrical Energy Generated (MWH) _
617,097 1,256.341 57,751,554 _,
- 19. Unit Set uce Factor 100- 97.6 68.2 20.- Unit Availability Factor 100 97.6 68.2- .
- 21. Unit Capacity Factor (Using MDC Net) 100.4 ~ ~ ~
97.0 63.1
.22. Unit Capacity Factor (Using DER Net) 101.2 97.8 62.1 123. Unit Forced Outage Rate 0 2.4 14.1
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startun: ___ _
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRIC 11T COMMERCIAL OPERATION
di ^( .
.. c
/
h.
i AVERACE DAILY UNIT POWER 12 VEL DOCKET NO. 50-338 '
UNIT NA-1 DATE 03-02-90 t
I' COMPLETED BY Bob Tillack TELEPHONE 703-894-263: ,
MONTil February 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
I 1 918 17 920 i
f- 2 918 18 _
921 3 919 19 920 4 919 20 919 5 918 '21 920 6 919, 22 918 l 7 918 23 904 8 919 24 918 9 916 25 918 I
10 919 26 917 p.
! +- 11 919- 27 918 12 920- 28 918 e
13 919 29 14 920 30 15 920 31
.16 919 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i1
ll
'l D00GT No. 50-338 UNIT SRUTDOURS AllB FUWER REDUCTIONS UNIT BABE North Anna 1-DATE 03-42-90 FEBRUARY 1990 C0FFLETED BY Bob T111ack REPORT MONTH TELEFRONE (703) 894-2632 Method of Licensee System Component Cause and Corrective No. ~ Date Type Duration Reason Actice to Shutting Event Code Code (Boers) y 4 5 Down Reactor Report # Prevent Recurrence No Entries This Month 3 4 1 2 .
Method: Exhibit F - Instructions F: Forced Reason:
for Freparation of Data S: Scheduled A-Equipment Failure (Explain) 1-Manual 2-Manual Scram. Entry Sheets for Licensee B-Maintenance or Test Event Report (LER) File C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuations (NUREG-0161)
SOperator Training / License Examination S-Load Reduction F-Administrative 9-Other S
G-Operational Error (Explain) Exhibit H - Same Source H-Other (Explain)
- :~ ,
j' ;
' p'
(; 44
, .t l
- i. ,
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPI.AhATION SHEET DOCKET No. 50-338 REPORT MONTH FEBRUARY UNIT MAME MA-1 YEAR 1990 DATE 03-02-90 COMPLETED BY Bob Tillack
'No Entry This Month
U 't J t . ' . .
.F 'e
l NORTH ANNA POWER STATION UNIT NO. 1 MONTH FEBRUARY _
St99tARY OF OPERATING EXPERIENCE l
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in i significant non-load related incidents.
DATE TIME DATA Feb ruary 01, 1990 0000 Began month with Unit at 100%, 965 MW.
February 23, 1990 0923 Commenced Unit ramp down to 90% power.ffor .
Turbine Valve Freedom Test.
1045 Unit stabilized at 890 MW, 90% power for Turbine Valve Freedom Test.
r 1227 Completed Turbine Valve Freedom Test satisfactorily.
1344 Commenced rampup to 100%' power.
1514 tluit stabilized atf100% power, 967 MW.
February 28, 1990 2400 Ended month with unit at 100% power, 965 MW.
p t
0
?7:"-
^<
$' l C <
OPERATING DATA REPORT ,
l DOCKET NO. 50-339 ;
DATE 03-02-90
~
i l
i COMPLETED BY Bob Tillack TELEPHONE (703) 894-2632 L. OPERATING STATUS Eli
~
i
- l. 'l. Unit Name: North Anna 2
? 2._-Reporting Period: February 1990 h 3. ' Licensed Thermal Power (MWt): 2893 ;
.. 4. Nameplate _ Rating (Gross MWe): 947 :
5.. Derign Electrical Rating (Net MWe): _ 907 i 6. Maximum Dependable Capacity (Gross MWo): 963
- l. '7. -Maximum Dependable Capacity (Net MWe): 915 *
- 8. ~ If Changes,0ccur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, !
Give Reasons: .
N/A
- 9. - Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions. If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672 1416 80,736
- 12. Number of 11ours Reactor Was Critical 672 1416 65,538.1 ,
.13. Reactor. Reserve Shutdown Hours 0 0 5,854.9 14 Hours Generater On-Line 672 1416 64,667.9
- 15. Unit Reserve Shutdown Hours 0 0 0 16.- Gross Thermal Energy Generated (MWH) 1,941,938 4,093,387 172,239,734
- 17. Gross Electrical Energy Generated (MWH) 642,525 1,353,799 __,56,359,316 -
- 18. Net Electrical Energy Generated (MWH) 611,908 1,289,524 54.128,356
- 19. Unit Service Factor - 100 100 80.1 .
- 20. Unit' Availability Tactor 100 100 80.1 21, - 99.5 99.5 74.7 22 . Unit UnitCapacity CapacityFactor Factor (Using (Using MDC Net)
DER Net) 100.4 100.4 74.0
- 23. Unit Forced Outage Rate 0 0 7.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITT INITIAL ELECTRICITT
(; COMMERCIAL OPERATION
WlsR s
i
'E- .
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 ;
r UNIT NA-2 i f
DATE 03-02-90 COMPLETED BY Bob Tillack TELEPHONE 703-894-2632
. MONTil FEBRUARY 1990 DAY AVERAGE DA1LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 910 17 904 2 910 18 912 3 912 19 911 4- 911 20 911 5 912 21 911 6 912 22 ,_
911
~7 911 23 911 8 912 24 912 ,
9 912 25 912 10 912 26 911 L
11 913 27 911 ,
12 912 28 911 13 912 29 -
14 912 30 ;
15 912 31 l 16 890
-INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
r
d UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET ND. 50-339 UNIT MAME North Anna 2 DATE 03-02-90 REPORT MONTH FEBRUART 1990 COMFLETED BT Bob Tillack TELEPHONE (703) 894-2632 No. Date Type Duration Reason Met u! oi Licensee System Camponent Cause and Corrective (Bours) Shutting- Event Code 4
Code 5
3 Down Reactor Report # Prevent Recorrence NO ENTRY THIS MONTH I 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain)
~
5 H-Other (Explain) Exhibit H - Same Source e
we M
.. . - . . . . . , , . . . . . . . . . y vm.,.. __ -m. _.. ..-.. . - .... . . . , ..,~
'9 4 . ';j Page 1 of 1 !
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH FEBRUARY UNIT NAME NA-2 ;
YEAR 1990 DATE 03-02-90 COMPLETED BY Bob Tillack
. NO ENTRY TIIIS MONTH 9
4 i
4 l
1.
l
>- 't l ,e NORTH AlntA POWER STATION UNIT NO. 2 MONTH FEBRUARY St99tARY OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in
'significant non-load related incidento.
DATE TIME DATA February 1, 1990 0000 Began Month with Unit at 100% Power, 953 MW.
February 16, 1990 1200 Commenced ramp down to 90% for-Turbine Valve Freedom Test.
1242 Unit stabilized at 875 MW, 90% pcwer for Turbine Valve Freedom Test.
1317 Completed Turbine Valve Freedom Test satisfactorily.
1505 Commenced ramp up to 100% power.
1523 Secured ramp at 95% power, 914 MW for Chemistry hold.
February 17 , 1990 0426 Released from Chemistry hold, commencing-ramp up to 100% power.
0455 Unit stabilized at 100% power, 955 MW.
February 28, 1990 2400 Ended month with Unit at 100% power, 953 MW.