ML20012B721
| ML20012B721 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/02/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20012B722 | List: |
| References | |
| NUDOCS 9003160170 | |
| Download: ML20012B721 (2) | |
See also: IR 05000289/1989026
Text
- .-
.-
,o.
.u
..(,
,
MAR 0 21990
a
Docket 6'o. 50-289
GPU Nuclear Corporation
ATTN: Mr. H. D. Hukili
Vice President and Director, TMI-1
P. O. Box 480
Middletown, Pennsylvania 17057
Gentlemen:
Subject:
Inspection Report No. 50-289/89-26
During the period from December 19, 1989 to January 23, 1990, members of the
NRC Region I staff. conducted routine safety inspections at your facility. We
have documented.the results of those inspection findings in the enclosed
,
report. At the conclusion of the inspection period, Mr. D. Johnson of my
staff, summarized the inspection findings to you and other members of your
staff.
This report includes a violation of NRC requirements. The violation concerned
the improper conduct of a reactor building local leak rate test which resulted
in separate inadvertent reactor protection system, and engineered safeguards
system actuations. -The violation indicated that sufficient guidance is
contained in some surveillance procedures for technicians with minimal know--
ledge of system response.
You should address this concern in your response to
the violation as instructed in Appendix A.
Additionally, the staff noted your' smooth transition into the present BR outage
activities which was acccmplished in an overall safe manner. The violation and'
other deficiencies identified in this report do not indicate any. major problem
areas, however improvements are still needed in upgrading facility procedures
in the surveillance area.
Your cooperation in these matters is appreciated,
hfi frI8 gh4
,/77d/}7'7{.
(Allh/K
dward C. Wenzinger,' Chief ,Q
Projects Branch No. 4
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
'2.
. Inspection Report 50-289/89-26
Attachments:
1.
Mid SALP Meeting Agenda
2. _8R Outage Meeting Agenda
'
OFFICIAL RECORD COPY
IR TMI C9-26/2 - 0001.0.0
m\\
mem/*
,om , _ o . ., = .,
i
.s\\
.
o
.
-
0
PNU
tg
.
.. .
,
_
.,
..
.,: ,
.n>-
<
.
.
i-
GPU Nuclear Corporation
2
E R 0 1 1990'
cc w/ encl:
E. L. Blake, Jr., Esquire
T. G. Broughton, Operations and Maintenance Director, TMI-1
R. J. McGoey, Manager, PWR Licensing
C. W. Smyth TMI-1 Licensing Manager
Commonwealth of Pennsylvania
local Public Document Room (LPDR)
'NRC Resident Inspector
,
Nuclear Safety. Information Center (NSIC)
Public Document Room (PDR)
Susquehanna Valley Alliance
'
TMI Alert
bec w/ enc 1:
K. Abraham, PA0 (RI)
,
F. Young, Acting DRP Section Chief, RI
,
E. Wenzinger, DRP Branch Chief, RI
R. Hernan, PM, NRR/PDI4
~D.-Johnson, RI
'
T.~Moslak, RI
.
L. Thonus, NRR/PD14
R. Brady, RI
Management Assistant, DRMA, RI _(w/o enc 1)
-
Region 1 Docket Room (with concurrences)
'
e
,
t
>
b
l
RI:h
RI:DRP
RI
1'
0 Johnson /pjjm
FYoung-
/,EWenzinger
l
$.$/90
b /g)/90
f "J// /90
0FFICIAL RECORD COPY
IR TMI 89-26/2 - 0002.0.0
02/23/90
v
_i
_
.
-
. _ .
--
.
-
.
.
--
-
-
- .