Forwards Requalification Program Evaluation Rept 50-293/89-14OL During Wks of 891204 & 11.Program Rated Satisfactory.Remedial Training Should Be Completed for All Operators & Crew That Failed Requalification Exams
ML20012A941
Person / Time
Site: Pilgrim
Issue date: 03/01/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20012A942 List:
References
NUDOCS 9003130036
Download: ML20012A941 (3)


See also: IR 05000293/1989014

Text

-

.

.-

y

..Q

s

MAR

1M

Docket No. 50-293

'

Boston Edison Company

[

ATTN: Mr. Ralph G. Bird

L

Senior Vice President - Nuclear

l

Pilgrim Nuclear Power Station

RFD #1 Rocky Hill. Road

Plymouth, Massachusetts 02360

Gentlemen:

Subject:

REQUALIFICATION PROGRAM EVALUATION Report No. 50-293/89-14(OL)

During the weeks of December 4 and December 11, 1989, the NRC conducted a

'

requalification program evaluation at the Pilgrim Nuclear Power Station. The

evaluation was conducted in ac:ordance with Revision 5 to NUREG-1021, " Operator

Licensing Examiner Standards," specifically, ES-601, " Administration of NRC

s

l

Requalification Program Evaluations." The evaluation had two purposes: (1)to

evaluate individual operator competency; and, (2) to evaluate the effectiveness

of the licensed operator requalification training program at Pilgrim. Generic

findings and preliminary results of the evaluation were discussed during the

interim and at the conclusion of the two week examination period with members

-of your staff identified in the enclosed report.

As a result of this evaluation, the Pilgrim requalification program has been-

rated as satisfactory.

The NRC results indicate two of nine Reactor Operators and

one of eleven Senior Reactor Operators failed at least one portion of the

exami'iation. Additionally, one of four crews was determined to be unsatisfac-

tory. Section 3.0 of the attached report contains the details of the program

evaluation.

As was discussed at the exit meeting held at the Chiltonv111e Training Center

on December 15, 1989, you are expected to complete remedial training for all

operators and the crew that failed the NRC requalification examinat;on.

Following the remedial training, the operators and crew may be returned to

,

L

shift duties and will be re-examined by the NRC within approximately six

months.

Further, we were concerned about the lack of involvement of a Senior Reactor

Operator from the operations staff in the requalification examination develop-

ment process.

From discussions held with your staff, we were assured this

situation will not recur during future program evaluations.

>

In accordance with 10 CFR 2.790 of the Commission regulations, a copy of this

letter and the enclosures will be placed in the NRC Public Documument Room.,

g)#

9003130036 900301

6

PDR

ADOCK 05000293

\\)

V

PDC :_

,

L

_

3

e

_,

.

-,

?

Boston Edison Company

2

No reply to this letter is required.

Should you have any questions regarding

this evaluation, please contact Mr. Richard Conte at (215) 337-5210.

Sincerely,

'Or'ir,inal Sicned Eyl

ROBERTf.i.GALLO

1

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosures: Operator Licensing Program Evaluation Report No. 89-14 (OL)

cc w/ enc 15.:

K. Highf111, Vice President, Nuclear Operations

R. Anderson, Plant Manager

J. Dietrich, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

The Honorable Lawrence R. Alexander

The Honorable Nicholas J. Costello

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams . Department of Labor and Industries, Commonwealth of Massachusetts

D. Tibbetts . Acting Massachusetts Secretary of Energy Resources

Sarah Woodhouse, legislative Assistant

A. Nogee, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

bec w/encis.:

Region I Docket Room (with concurrences)

-W. Russell, RA

J. Dyer, EDO

R. Wessman~, NRR

D. Mcdonald, NRR

J. Johnson, DRP

,

l

OFFICIAL RECORD COPY

SISC0/PIL. REQ./1/5/90 - 0002.0.0

01/05/90

. s.

L

.

.

,

.

[.

,

, Boston Edison Company

3

r.

bec w/encls, cont'd.:

R. Blough, DRP

J. MacDonald, SRI - Pilgrim (with concurrences)

R. Conte, DRS

Don Florek, Senior Operations Engineer, DRS

Richard Miller, Sonalysts

Marion Daniels, Sonalysts

John Hannek, EG&G

DRS Files (3)

F

bec w/o enclosures:

L-

Management Assistant. DRMA

(

,

r

DRS:RI

DRS:RI

RI

D :RI

Sisco/dmg

Conte,6k

allo

Hod s

i

024:3/90

.02/j/90

-se/, /90

02/

90

W

E

"]

Alf

0FFICIAL RECORD COPY

SISC0/PIL. REQ./1/5/90 - 0002.1.0

01/05/90

b

..