Advises That 900202 Request for Schedular Extension of Commitments Re Seismic Margin Evaluation for Plant Capability to Withstand Seismic Events Beyond SSE Acceptable
ML20011F516
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/23/1990
From: Hannon J
Office of Nuclear Reactor Regulation
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 9003060177
Download: ML20011F516 (3)


Text

m.

o 4

, 7[

&F

-February 23, 1990.-

Docket No. 50-440 T

T d NRC & Local PDRs.

1

(

PDIII-3.r/f.

JZwolinski-JHannon TColburn PKreutzer-OGC-WF1 EJordan ACRS(10)

Mr.'Alvin Kaplan, Vice President PDIII-3 Gray DPersinko y

Nuclear Group' PBochnert HPastis-i

_The Cleveland Electric Illuminating RFraley JHopkins Company

-10 Center Road Perry, Ohio 44081

Dear Mr.' Kaplan:

^

SUBJECT:

SEISMIC MARGINS EVALUATION FOR THE PERRY NUCLEAR POWER PLANT,-

7~.c UNIT NO. I' We-have reviewed-your February 2,1990 request for schedular extension 1

of your comitments relative to seismic margin evaluation (a plant's L

capability to withstand seismic events beyond the safe shutdown earth-

. quake (SSE)) for'the Perry Nuclear Power Planthad comitted to:- (i) Unit No.1.

.Your previoust letter dated July-21, 1988 finalizing criteria and

.comencing preparatory work by the end of the first refueling. outage;

-(2) completing preparatory work, walkdowns and specific system, component W

and_ structure evaluations by the end of the second refueling outage; and (3)-implementing modifications including final documentation by the end L

of the third refueling outage. We approved your July 21, 1988 proposed.

L

_ schedule by.. letter dated March 30, 1989.

Intyour' February 2,1990 letter you indicated your intent-to conduct the Seismic Margins Evaluation Program for the Perry Nuclear-Power Plant

'within the context of resolving severe accident issues under the Individual Plant' Examination for External Events (IPEEE) Program. We concur with this approach. You further stated that your previous schedule assumed final NRC' staff guidance would become available in 1989. Since that guidance was not forthcoming, it is your intent to await issuance of the IPEEE Generic Letter which would contain additional guidance on seismic margin methodology a

and follow those options available to you under the IPEEE program for L

conducting seismic margins studies. The staff has consulted with the ACRS (Advisory Comittee for Reactor Safeguards) regarding your proposed schedule change.' The ACRS has no objections to that change.

Based upon the need to

' inject industry and regulatory guidance into the formulation and sco)e of your Seismic Margins Evaluation Program and the need to coordinate t1at program with other related NRC initiatives such as IPEEE, the staff finds a

b g

emmarb e

P

-,.,. h - -

j Mr.-Alvin Kaplan {

o-your proposed schedule to be acceptable.

Please note that in your_ response to the IPEEE Generic Letter, you should include a detailed schedule for implementing your Seismic Margins Evaluation Program.

Sincerely, a

John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear-Reactor Regulation-cc:

See next page

. i

't i

4 4

DOCUMENT NAME: SEISHIC MARGINS h

Office:

LA/PD}JI-3 PM/PDIII-3 PD DIII-3 Surname: 363btter TColburn/tg JHan n Date:

A gj /90 yL / A//90 pb 90 e

.g,,

4- -

1 Mr. Alvin Kaplan Perry Nuclear Power Plant

. The Cleveland Elec~tric '

Unit 1 Illuminating Company cc: Jay E. Silberg, Esq.

Mr. James W. Harris, Director.

Shaw, Pittman, Potts & Trowbridge Division of Power Generation 2300 N Street, N.W..

Ohio Department of Industrial Washington, D.C.

20037 Relations

~

P. O. Box 825 David E. Burke Columbus, Ohio 43216 The Cleveland Electric Illuminating Company The Honorable Lawrence Logan P.O. Box 5000 Mayor, Village of Perry Cleveland, Ohio 44101 4203 Harper Street Perry, Ohio 44081 Resident Inspector's Office U.S. Nuclear Regulatory Commission The Honorable Robert V. Orosz Parmly at Center Road Mayor, Village of North Perry Perry, Ohio 44081 North Perry Village Hall 4778 Lockwood Road Regional Administrator, Region III North Perry Village, Ohio 44081 U.S. Nuclear Regulatory Comission 799 Roosevelt Road Attorney General

' Glen Ellyn, Illinois 60137 Department of Attorney General 30 East Broad Street Frank P. Weiss, Esq.

Columbus, Ohio 43216 Assistant Prosecuting Attorney 105 Main Street Radiological Health-Program Lake County Administration Center Ohio Department of Health Painesville, Ohio 44077 1224 Kinnear Road Columbus, Ohio 43212 Ms. Sue Hiatt OCRE Interim Representative Ohio Environmental Protection 8275 Munson Agency Mentor, Ohio 44060 1800 Watermark Drive Columbus, Ohio 43266-0149 Terry J. Lodge, Este..

618 N. Michigan Steet Mr. Phillip S. Haskell, Chairman Suite 105 Perry Townsh'p Board of Trustees Toledo, Ohio 43624 Box 65 4171 Main Street John G. Cardinal, Esq.

Perry. Ohio 44081 Prosecuting Attorney Ashtabula County Courthouse State of Ohio Jefferson, Ohio 44047 Public Utilities Comission 180 East Broad Street Robert A. Newkirk Columbus, Ohio 43266-0573 Cleveland Electric Illuminating Company Michael D. Lyster Perry Nuclear Power Plant Cleveland Electric P. O. Box 97 E-210 Illuminating Company Perry, Ohio 44081 Perry Nuclear Power Plant P. O. Box 97 SB306 Perry, Ohio 44081