4 UNITO STATES '
~
~
[;l.
(", '
,, NUCLEAR ME2ULATCRY COMMISSION
- i py -
Lc:Asmuovow e.c.soses j
9 w$
.q WL 3,,g FEB 11'1W x-4
.y K
'Dosket No. 50-293 1
7
.l Mr. Stephen J. Sweeney :
F
~ Chairman and Chief. Executive Officer Boston Edison Company q
800 Boylston Street-
- Boston,. Massachusetts. 02199.
Dear Mr. Sweeney:
n 3>
.On January 22 and 23.1990,_ NRC senior managers _ met to review the performance of nuclear power plants licensed to operate by the NRC.
This meeting is-conducted semiannually to focus NRC' resources on those plants and related -
J issues: of greatestu safety ; significance.
At this meeting, it was concluded Pilgrim has demonstrated. sustained improvement sufficient to warrant removal from the1 category.:ofi plants that' require increased attention. from both NRC s
_ Headquarters and-the Regional ~ office.
A summary of the discussions held-relating to Pilgrim is provided below:
- Boston Tdison-has effectively implemented a -. comprehensive corrective action plan' which addressed the root causes of their historical poor performance.iThe plaat's performance during the early phases of power L
ascension was. marked by both equipment problems and personnel error. The L
i licensee has. thoroughly ~ evaluatedi these events and extracted-important L - '
lessons learned.
' Corrective actions.have ~ been largely effective'. in p
addressing ttire root causes of. these events.
The-later phases'of power-L
' ascensioncwere well conducted including.a planned outage in October 1989 g-
' and a shutdown : from' outside the control room.
-The licensee has also ~
effectively' assessed ~1ts own performance and identified areas for continuing emphasis.. Three_of these' areas, procedure) upgrade, procedure
. adherence, and' management self-assessment will be the focus of ongoing l
Regional staff crersight.
The _ licensee,. State.and local officials' efforts in correcting Federal
- Emergency Management Agency (FEMA) identified planning deficiencies in the
~ off-site Emergency Response. Plans have-significantly improved emergency-
' /
preparedness.. A full-scale emergency drill-was conducted in October 1989,-
- which satisfied,the schedular exemption.to conduct a drill within 120 days
- of E completion of power ascension.
However, because FEMA has not yet
-issued.its exercha report nor reached conclusions on the. previous planning deficiencies, the Regional staff will continue to mnnitor off-site emergency preparedness progress.
)
p\\
9002260007 900212 PDR ADOCK 05000293 Ib i
I P
PDC o
[
..s e
r
+
c--
h,, ewe-
,u
r a
1 J
,c Mr. Stephen J. Sweeneyi -
q.
~ An NRC Comission meeting: open to the public har been scheduled for February 15 1990, to review' the results of the latest meting of-NRC managers.
Mr.
1 Wil"liamT. Russell,theRegionIAdministrator,hasdiscussed~thebasisforour j
conclusions-with regard to _ the Pilgrim facility 'with members of your staff, u
a If you have any questions, do not hesitate to call me.
l l.
1; 1
51ncereiy,.
L l'
- Original Signed By:
2 L
James M. Taylor James M. Taylor Executive Director for.
4 Operations cc: See Next Page 7
i r
l c,.
DISTRIBUT!QW sEcy
. Docket File OCA PDg OPA T. Murley-W. Russell EDO r/f OF C.
- 0EDO
- EDO H AME
- JDyer:emp :JMTi a
.D A T.E.. : 02 / 0 9 / 9 0... -... : 02 / 0 $/ 9 0........ :....._ -.... :._ _.....
2
- - L
n-jfi Mp St'ephen J.;Sweeney
-Pilgria Nuclear Power Station-y
.,~
x
- cc: -.
Mr. Richard N. Swanson, Manager Mr. K. L. Highfill
-Nuclear Engineering Department.
1 Vice Frasident of Operations /-
f
- and Station:
Boston Edison Compay Pilgrim Nuclear Power Station.
25.Braintree Hill Park
^
RFD #1' Rocky Hill Road-Braintree, Massachusetts :02184' Plymouth, Massachusetts- 02360 I
Ms. Elaine D. Robinson Resident-Inspector U. S. Nuclear Re pulatory Commission Nuclear Infomation Manager rim Nuclear Power Station
-Pilgrim Nuclear >ower Station-Pilg#1, Rocky Hill Road,
RFD
' Post Office Box 867-Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Chaiman Board of Selectmen Mr. Charles V. Barry 4
11'LincoInStreet Secretary of Public-Safety
- Plymouth, Massachusetts. 02360 Executive Office of Public Safety i
One Ashburton Place Office of the Commissioner Boston, Massachusetts' 02108 Massachusetts Department of Environmental Quality Engineering 1
One Winter Street-Boston, Massachusetts _ 02108 s
Office of the. Attorney General
'One Ashburton-Place 20th* Floor Boston, Massachusetts 02108 Mr. Robert M.' Hallisey, Director Radiation Control Program Massachusetts Department of Public Health
- 150 Tremont Street. 2nd Floor Boston, Massachusetts 02111 s
Regional Administrator, Region _I i
i
. U. S. Nuclear Regulatory Com ss on 475 Allendale Road' King of. Prussia, Pennsylvania 19406 Mr. John Dietrich l.
Licensing Division Manager-L Boston Edison Company 25 Braintree Hill Park 1
-Braintree, Massachusetts 02184 i