ML20011F028

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-245/89-21 on 891204-08 & Notice of Violation
ML20011F028
Person / Time
Site: Millstone 
Issue date: 02/02/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20011F029 List:
References
NUDOCS 9002230483
Download: ML20011F028 (2)


See also: IR 05000245/1989021

Text

a:

-p , .;<-

.r

,

} l st

e

c

- s

V.'

F

)

.

m

,

t

Docket No. 50-245

E

EE

'

Northeast Nuclear Energy Company

ATTN: Mr. E.. J. Mroczka

_

,

j

n

Senior Vice President - Nuclear

-

Engineering and Operations

,

P. 0. Box 270

Hartford,~ Connecticut 06141-0270

-

Gentlemen:

'

'

Subject:- ' Inspection'No. 50-245/89-21

This refers toithe routine safety inspection conducted by A. Finkel of this

[

office.on December- 4-8,' 1989 at'M111 stone Unit 1. Waterford Connecticut of

--

' activities authorized by:NRC License No. DPR-21.and to the discussions of our

i

findings held by Mr 'Finkel- with Mr. S. Scace~ and other members of your staff

'

.

at the conclusion of.the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

~

,

tion Report which is encl; sed with this letter. ~ Within these areas, .the

' inspection: consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

~

Based on.the~results of this inspection, it appears that one of your activities

was not condu::ted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the " General' Statement of

Policy.and Procedure for NRC Enforcement Actions," 10 CFR Part 2,-Appendix C.

.(Enforcement Policy). You are required to. respond to this letter and in

preparing your1 response, you shou'd follow the instructions in= Appendix A.

The response directed by this letter and the accompanying-Notice are not' subject

to the clearance procedures' of the Office of Management and Budget as required

by the Paperwork Reduction Act of-1980, PL 96-511.

LYour cooperation with us in this matter is appreciated.

Sincerely,

R00cny M. cAtto

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosures:

1.

Appendix A,' Notice of Violation

y

2.

~NRC Region 11 Inspection Report Number 50-245/89-21

0FFICIAL RECORD COPY

ML DL MILL 1 89-21 - 0001.0.0

02/01/90

,(/0g(

900223048390bObl'45

'i

2

4

\\ /

PDR: ADOCK 05

'

G.

PDC --

A

,

,

,

.

-

-

1,_

'

.:

.

.

'

.

i: ff

. - -

.t

.

..

..

I

[NortheastNuclearEnergyCompany-

2

)

"

,

)

cc w/encls::

.

.

..

s

W. D. Romberg,.Vice President, Nuclear Operations

i

S.' E. Scace, Station Superintendent-

.

'

D. 0. Nordquist, Director of Quality Services

.

i

R..M.' Kacich, Manager, Generation Facilities' Licensing

D. B. Miller,' Station Superintendent, Haddam Neck

Gerald Garfield, Esquire

i

'

Public Document Room (PDR).

-Local- Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

-State of Connecticut

t

-bcc w/encis: .

.

l

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

DRP Section Chief

W. Raymond, SRI', Millstone

,

M.:Boyle, LPM, NRR

J. Shediosky, SRI,-Haddam Neck

i

N; Blumberg, DRS'

'A. Finkel, DRS

,

DRS Files (3)

,

s

4

=

8

oft,

RI:DRS

RI:DRS

S

FinkeJ/ajk

Blumberg

12 V /89

12/ /0i

89

.

9-/i /@

,,

OFFICIAL RECORD COPY

ML DL-MILL 1 89-21 - 0002.0.0-

01/02/90

,

.

. .

-

.

-

.--

-