ML20011F028
| ML20011F028 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/02/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20011F029 | List: |
| References | |
| NUDOCS 9002230483 | |
| Download: ML20011F028 (2) | |
See also: IR 05000245/1989021
Text
a:
-p , .;<-
.r
,
- } l st
e
c
- s
V.'
F
)
.
m
,
t
Docket No. 50-245
E
EE
'
Northeast Nuclear Energy Company
ATTN: Mr. E.. J. Mroczka
_
,
j
n
Senior Vice President - Nuclear
-
Engineering and Operations
,
P. 0. Box 270
Hartford,~ Connecticut 06141-0270
-
Gentlemen:
'
'
Subject:- ' Inspection'No. 50-245/89-21
This refers toithe routine safety inspection conducted by A. Finkel of this
[
office.on December- 4-8,' 1989 at'M111 stone Unit 1. Waterford Connecticut of
--
' activities authorized by:NRC License No. DPR-21.and to the discussions of our
i
findings held by Mr 'Finkel- with Mr. S. Scace~ and other members of your staff
'
.
at the conclusion of.the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
~
,
tion Report which is encl; sed with this letter. ~ Within these areas, .the
' inspection: consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
~
Based on.the~results of this inspection, it appears that one of your activities
was not condu::ted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General' Statement of
Policy.and Procedure for NRC Enforcement Actions," 10 CFR Part 2,-Appendix C.
.(Enforcement Policy). You are required to. respond to this letter and in
preparing your1 response, you shou'd follow the instructions in= Appendix A.
The response directed by this letter and the accompanying-Notice are not' subject
to the clearance procedures' of the Office of Management and Budget as required
by the Paperwork Reduction Act of-1980, PL 96-511.
LYour cooperation with us in this matter is appreciated.
Sincerely,
R00cny M. cAtto
Robert M. Gallo, Chief
Operations Branch
Division of Reactor Safety
Enclosures:
1.
Appendix A,' Notice of Violation
y
2.
~NRC Region 11 Inspection Report Number 50-245/89-21
0FFICIAL RECORD COPY
ML DL MILL 1 89-21 - 0001.0.0
02/01/90
,(/0g(
900223048390bObl'45
'i
2
4
\\ /
PDR: ADOCK 05
'
G.
PDC --
A
,
,
,
.
-
-
1,_
'
.:
.
.
'
.
i: ff
. - -
.t
.
..
..
I
[NortheastNuclearEnergyCompany-
2
)
"
,
)
cc w/encls::
.
.
..
s
W. D. Romberg,.Vice President, Nuclear Operations
i
S.' E. Scace, Station Superintendent-
.
'
D. 0. Nordquist, Director of Quality Services
.
i
R..M.' Kacich, Manager, Generation Facilities' Licensing
D. B. Miller,' Station Superintendent, Haddam Neck
Gerald Garfield, Esquire
i
'
Public Document Room (PDR).
-Local- Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
-State of Connecticut
t
-bcc w/encis: .
.
l
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
DRP Section Chief
W. Raymond, SRI', Millstone
,
- M.:Boyle, LPM, NRR
J. Shediosky, SRI,-Haddam Neck
i
N; Blumberg, DRS'
'A. Finkel, DRS
,
DRS Files (3)
,
s
4
=
8
oft,
RI:DRS
RI:DRS
S
- FinkeJ/ajk
Blumberg
12 V /89
12/ /0i
89
.
9-/i /@
- ,,
OFFICIAL RECORD COPY
ML DL-MILL 1 89-21 - 0002.0.0-
01/02/90
,
.
. .
-
.
-
.--
-