Forwards Insp Rept 50-285/90-01 on 900108-12 & Notice of Violation.Violation Re Environ Qualification of Reactor Containment Bldg Sump Temp Instrumentation Not Cited
ML20011E347
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/01/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20011E348 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9002130275
Download: ML20011E347 (3)


See also: IR 05000285/1990001

Text

.

.

- -_

_

[ f.

4

- *

s

( . ,

,'

.

..

,

FEB -l BIO

-

In Reply Refer To:

Docket: 50-285/90-01

'

Omaha Public Power District

ATTN: Kenneth J. Morris, Division Manager

Nuclear Operations

444 South 16th Street Mall

Omaha, Nebraska 68102-2247~

Gentlemen:

This refers to the inspection conducted by a team of HRC and NRC consultant

personnel during the period January 8-12, 1990, of activities authorized by NRC

Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our

findings with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included the implementation of the

commitments to the provisions of Regulatory Guide 1.97

"Postaccident

Monitoring Instrumentation." Within these areas, the inspection consisted of

,' -

selective examination of design documentation, procedures and representative

l

-records, interviews with personnel, and observations by the inspectors. The

-

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities, as

1.-

discussed in paragraphs 3.3.4 and 3.3.5 of the enclosed report, were in

violation of HRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

'in the Notice of Violation enclosed with this letter.

In addition to the activities mentioned above, another activity was also found

to be in violation of NRC requirements. This activity related to the

environmental qualification of the reactor containment building sump

temperature instrumentation and is discussed in paragraph 3.1.6 of the enclosed

l'

report. However, 'n accordance with the provisions of Section V.C.1 of the

'

NRC's Enforcement Policy, no citation is being issued for this violation and no

written response is required.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Eudget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

D:DRS* Ngo

D:DRP S

RIV:RI:PS$*

C:PSS*

E0*

PWagner

TStetka

GSanborn

LJCallan

SJCollins

/ /90

/ /90

/ /90

/ /90

.2 // /90

  • previously concurred

900213027G 900201

\\\\

^

PDR

ADOCK 05000285

Q

PDC

g}

.

.

.

. .

- - -

-

-.

,

(

-

,

,,

.,

,).

% '}.

>

$

1

-

7

.,

.

l

.

s,; y

,-

'

g ..;

Omaha Public Power District'

-2-

j

i>

_w

,

Should you have any questions-concerning this inspection, we will be pleased to

g

discuss them with you.

e

,

,

p

,

'

Sincerely,

t-

,

I

Original Signed By:

c

i.

Samuel J. 00llins

c/

i

Samuel J. Collins, Director

Division of Reactor Projects

p

t

i'

Enclosures:

i

1.

Appendix A - Notice of Violation

L

2.

Appendix B - itRC Inspection Report

50-285/90-01 w/ attachments

cc w/ enclosures:

LeBoeuf Lamb Leiby & MacRae

' ATTN: Harry H. Voigt, Esq.

- 1333 New Hampshire Avenue, NW

Washington, D.C.

20036

Washington County Board

-

of Supervisors

ATTN: Jack Jensen, Chairman

-

Blair, Nebraska 68008

Combustion Engineering,-Inc.

ATTN: Charles B.~Br_inkman, Manager

. Washington Huclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville, PD 20852

Department of Health

ATTN:- Harold Borchert, Director

Division of Radiological Health

301' Centennial Pall, South

P.O. Box 95007

Lincoln,= Nebraska 68509-

.

'

- Fort Calhoun Station

ATTN:1 G.-R. Pcterson, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

U.S. Nuclear Regulatory Comission

ATTN: Resident. Inspector

' P.O. Box 309

Fort Calhoun, Nebraska 68023

,

c.

l.-

4 -

4

j

!

[

-

7 -

_

,

'

r

z

-

.

.

.

e. .

< . n,,

,

'

,

-

-

.

, ,

.

,,

q

.x .

<

,.

.

.

v.

,

'-

,. ' Omaha Public Power District

-3-

%

'

.

.

U.S. Nuclear Regulatory Comission

l

,' ATTH:-..-. Regional Administrator, Region IV

'

-611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011.

.

(

.

bcctoDMB(IE01)

bec distrib, by RIV:

  • R. D. Martin
  • Resident Inspector

,

  • DRSS-FRPS
  • SectionChief(DRP/B)-
  • Mis. System
  • RIV File

i

'

'

  • DRPJ
  • RSTS 03erator-
  • ProjectEngineer(DRP/B) ~

Lisa Slea, RH/ALF

  • DRS

.

13-D-18)

,

  • A. Bournia, NRR Project Manager (HS:

>

t

4

  • T. Stetka

'

  • P.' Wagner.
  • C. Paulk
  • B.'Marcus, NRR (2 copies)
  • w/766:

1

4

'

>

,

-

,

d

,

,

i

(

).

,

4','

.;

. g

'

.e.

%

,

'

[.l,

I

l

l

!

!

i

,

t

'y

N

s.

'