ML20011E194
| ML20011E194 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 01/31/1990 |
| From: | Knapp M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Frizzle C Maine Yankee |
| Shared Package | |
| ML20011E195 | List: |
| References | |
| NUDOCS 9002090024 | |
| Download: ML20011E194 (2) | |
See also: IR 05000309/1989024
Text
_
_
r,
a
,
-
V
l
JA!4 311990
1
Docket No. 50-309
Maine Yankee Atomic Power Company
ATTN: Mr. Charles D. Frizzle
-
President
i'
83 Edison Drive
August:, Maine 04336
i
Gentlemen:
Subject: Meeting No.~50-309/89-24
On January 9, 1990, a Management Meeting was held at the NRC Region I Office,
7
L
King of Prussia, Pennsylvania, to discuss the findings of the Special Physical
Security Inspection, No. 50-309/89-24, as requested by Ms. Brenda Castonguay of
i
your staff. The attendees are listed in Details, Paragraph 1 of the enclosed
,
meeting report. At the meeting, we discussed security events that prompted the
special inspection, the violations of your NRC-approved Physical Security Plan
,
,
which were identified during that inspection, the causes of the violations, and
the corrective actions you have taken, and plan to take, to prevent recurrence.
The details of our discussion of the security event have been determined to be
'
Safeguards Information.and are exempt from public disclosure in accordance with
10 CFR 73.21. Therefore, they are not included in the meeting report.
Although not on the original meeting agenda, we also discussed three
'
operations-related events which occurred in the last several months. The
i
'
outlines for the presentations made by members of your staff and an overview of
,
our discussions of the events are included in the enclosed meeting report.
.
We appreciate the information that was provided during the meeting and believe
i
L
that the meeting was mutually beneficial in understanding and resolving the
I
L
issues raised during the special inspection and the other recent events.
Your cooperation with us in this matter is appreciated.
Sincerely,
!
,y nm e ...
, . , . .
i
h. .
.j
4
Malcolm R. Knapp, Director
Division of Radiation Safety
,
.
and Safeguards
(
I
.rc
'
,
D'(
L
OFFICIAL RECORD COPY
MY MEETING RPT 89-24 - 0001.0.0
i
9002090024 900131
01/29/90
'
l'
tPDR
ADOCK.05000309
l
- O
1
,
e
I
o,
,
'
.
JAN st }gg3
i
Maine Yankee Atomic
2
Power Company
ec w/ enc 1:
J. Randazza, Assistant Chairman of the Board
J. H. Garrity, Vice President, Engineering and Licensing
E. T. Boulette, Vice President, Operations / Plant Manager
J. D. Firth, Vice President, Public and Governmental Affairs
P. L. Anderson, Project Manager
G. D. Whittier, Manager, Nuclear Engineering and Licensing
J. A. Ritsher, Attorney (Ropes and Gray)
!-
P. Ahrens, Esquire, Maine Deputy Attorney General
V. Vanags, Maine State Planning Office
Public Document Room (PDR)
Local- Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistent, DRMA (w/o enc 1)
J. Johnson, DRP
E. McCabe, DRP
H. Eichenholz, SRI - Yankee
E. Leeds, LPM, NRR
M. Conner, SALP Reports Only
J. Dyer, EDO
,
l
l
l
W
l
RI:
S
RI:
RI:DRSS)-
R: RSS
015
.k
Ke
Bellamy
Jo er
Kn p
01 # 9 /90
0149/90
014j /90
01
90
Q/
90
p
0FFICIAL RECORD COPY
MY MEETING /RPT 9-24 - 0002.0.0
01/19/90
l