r
o
,
- .N
a
DEC l 8 im
.
.
In Reply Refer To:
Docket:
50-267/89-22
Public Service Company of Colorado
ATTN:-
A. Clegg Crawford,.Vice President
Nuclear Operations
P.O. Box-840
' Denver, Colorado 80201-0840
Gentlemen.
.
This refers to the inspection conducted by Dr. D. B. Spitzberg of this office
and other accompanying personnel during the period November 14-16, 1989, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain
Nuclear Generating Station, and to the discussion of our findings with Mr. A.
Clegg Crawford,_ Vice President - Nuclear Operations and other members of your
staff at the. conclusion-of the inspection.
Areas examined during the inspection included the implementation of the
emergency plan and procedures during the annual emergency response exercise.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
The inspection findings are documented in the
enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Your staff response to the' exercise was considered to be excellent and assures
an emergency preparedness program adequate to protect the health and safety of
the public.
The enclosed report, however, identifies exercise weaknesses in
your emergency preparedness program. Weaknesses involved the following:
diversion of key control ~ room personnel from direct reactor evaluation and
control activities, failure of emergency response teams to follow adequate
health physics practices, and inadequacy of the plant public address system's
audibility in certain onsite locations.
Exercise weaknesses'according to 10 CFR Part 50, Appendix E.IV.F.5, are
inspection findings that need to be corrected by the licensee.
You are
requested to provide this office with a description of your corrective measures
l
and your schedule for completing these actions within 30 days after receipt of
this letter.
'!>
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph.2 of the enclosed report.
RIV':SEPS 7t.s-
C:SEPSN
@:DRSS'
D:
'
j
DBSpitzberg:lm
DAPowers
JABBeactg N\\
C lins
'
n/st-/89
n /G /89
pt/g/89
,
j
st
8912260170 691218
~
ADOCK 05000267
Q
ll fin
-
w
.
zan
.
'
'
. .
,
,,
Public Service Company of Colorado
-2-
,
Should you have any questions concerning this inspection, we will be pleased to
.
discuss them with you.
Sincerely,
/W
Samuel J. Collins, Director
Division of Reactor Projects
,
.
Enclosure:
Appendix - NRC Inspection Report
50-267/89-22
cc w/ enclosure:
Public Service Company of_ Colorado
ATTN:
D. W. Warembourg, Manager
Nuclear Engineering Division
P.O. Box 840
Denver, Colorado 80201-0840
GA International Services Corporation
Fort St. Vrain Services
ATTN:
David Alberstein, Manager
P.O. Box 85608
San Diego, California 92138
'
Public Service Company of Colorado
ATTN:
Charles H. Fuller, Manager
Nuclear Production and Station
Manager
16805 Weld County Road 19-1/2
Platteville, Colorado 80651
Public Service Company of Colorado
ATTN:
H. L. Brey, Manager, Nuclear
Licensing and Resource
Management Division
P.O. Box 840
Denver, Colorado 80201-0840
Public Service Company of Colorado
ATTN:
P. F. Tomlinson, Manager
'
Quality Assurance Division
l
16805 Weld County Road 19-1/2
L
Platteville, Colorado 80651
.
..
l
-
'p -
~
}
L
.r
..
-
<
.
'
.
Public~ Service Company of Colorado
-3-
!!
i
Public Service Company of Colorado
7'
'
ATTN:
D..D. Hock, President and
Chief Executive Officer
P.O.- Box 840
t
r-
Denver, Colorado 80201-0840
4
Public Service Company of-Colorado
e
- ATTN:
Commitment Control Program
. Coordinator
' 2420 W. 26th Ave. Suite -100-D
Denver, Colorado 80211
j
i
.Kelley, Standfield &.O'Donnell
'
v.
ATTN:
Mr. J. K. Tarpey
.
.
Public Service' Company Building
Room 900
550 15th Street
Denver, Colorado 80202
,
,
Chairman
[
Board of County Commissioners
Greeley, Colorado. 80631
Regional Representative
Radiation Programs
.
i"
Environmental Protection Agency
1 Denver Place
999 18th Street,. Suite 1300
'
Denver, Colorado 80202-2413
Department of Health
ATTN:
Robert M. Quillen, Director
Radiation Control Division
'4210 East lith Avenue
r
'
' Denver, Colorado 80220,
>
__
' Colorado Public Utilities Commission
ATTN:
Ralph.Teague, P.E.
1580 Logan Street OL1 '
Denver, Colorado 80203
i
U.S. Nuclear Regulatory Commission
ATTN:
Senior Resident. Inspector _
P.O. Box 640
Platteville, Colorado 80651
,
.
--
.--
- - - - - - - - - . - - - . - - - - - - - - . - -
-
T
p.
,
- <>
i
.
1.
^
Public Service Company of Colorado
-4-
P
,
,
U.S. Nuclear Regulatory. Commission.
'
ATTN:
Regional. Administrator, Region IV
>
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas .76011
,
L.
Dr. 01 son,.Rc71onal Director
FEMA Region ~8 .
. Denver Federal Center Bldg. 710
'
Box 25267
L
Denver, Colorado 80225-0267
bec to DMB (IE35) --SEPS
bec distrib..by RIV:
.
- R. D. Martin.
- Resident Inspector
- Section Chief (DRP/B)
- ProjectEngineer(DRP/B)
,
- DRSS-FRPS'
lisa Shea, RM/ALF
- MIS System'
.
- RSTS Operator
.
[
l
- P. Erickson,.NRR Project Manager-(MS:
13-D-18)
'
- RIV File
- DRS
- DRP
C. A. Hackney
,
- B. Spitzberg
- A. B. Beach-
,
- D.
Powers
.
<*w/766
'
i'
s
!
'
>
'
[
'
,
,
9
.,
+
$J
I
.
t.
i
,s
bWk