f;; ~',;y

~(

(

w..

p

. 4_.

?',

ENCLOSURE 2 l

tu F

TENNESSEE VALLEY AUTHORITY NUCLEAR POWER GROUP SEQUOYAH NUCLEAR PLANT CORRECTIONS T0 a;

MONTHLY' OPERATING REPORT TO THE-NUCLEAR-. REGULATORY COMMISSION OCTOBER 1989 l

i f

4 I

L l-l!

l l~

l' 1.

1 1

8912210177 891215

- )3DR ADOCK 05000327

-l

[-.

my

w-g,4,

g

.yc.

'.\\,_

)y V

?>l

~

.y OPERATING DATA REPORT =

DOCKET NO.

50-328.

DATE 11-2-89 COMPLETED BY T. 1. Hollomon TELEPHONE (615) 843-7528 glERATING STATUS

! Notes

1. ' Unit Nasse:

Seouavah Unit Two 2.

Reporting Period:

October 1989 l'

j 3.

t.icensed Thermal Power (MWt): 3411.0 1

4. = Nameplate Ratintf (Gross Mee): 1220.6 j
5. ; Design Electrical Rating (Net Mee): 1148.0-l 6.

Maximum Dependable Capacity fn oss We): 1183.0

.7., Maximan Deperdable Capacity (kJ; mee): 1148.0

8. :If Clianges occur in capacity Ratings (Items Ntaber 3 Through 7) Since Last Report, Give Reasons:

l :.

yfg : -

~

_ 9.

Power Level To Which Restricted, if Any (Net We):

N/A q

- 10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative l

i

11. Hours in Reporting Period 745.0
7. 2%.0 65.041.0 I
12. Nunter of Hours Reactor Was Critical 745.0 5.003.0 32.189.0 1
13. Reactor. Reserve Shutdown Hours 0.0 0.0-0.0

'14. Hours Generator On-Line 719.7*

4.805.5*

31.3%. 8*

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 j
16. Gross Thermal Energy Generated ( M )

2.122.206 14.820.639

%.544.737

'17. Gross Electrical Energy Generated ( M )

716.580 5.022.736 32.711.4 %

18. Net Ei.:rctrical Energy Generated (MI) 687.877 4.003.486 31.194.582 i
19. Unit Service Factor 96.6*

65.9 48.3

'20. Unit Availability Factor-96.6*

65.9 48.3

21. Unit Ctpacity Factor (Usir.g MDC Net) 80.4 57.3 41.8
22. Unit capacity Factor (Using DER Net) 80.4 57.3-41.8
23. Unit Forced Outage Rate 0.0 7.8 46.0
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

An ice condenser outage is scheduled in March 1990, with duration of 9 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

  • Values corrected from the October 1989 Monthly Opeiating Report

.. - =,..,.

n-

- ;_.-.,,. g We

[g

. DOCKET NO:

50-328 _

Tq

~

s UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:

Two-1 DATE:

~11/3/89' REPORT MONTH: October 1989 COMPLETED BY:1 _,L Ho11 aman (Page 1 of 2:)

TELEPHONE:I6151 843-7528

-Method of_

! Licensee

.Cause and Corrective; !

! Duration !

. ! Shutting *Down ! Event-

! Systes

! Component,!'

Action to

! Date

! Type'

! (Hours) ! Reason'

! Reactor

! Report No.

! Code *

! Code'

! : Prevent Recurrence

! No.

! 9 1 891003 5

B

'5

! Reduced power to 50 l'

! percent for maintenance !

! on MFP 2A. After 2A

! maintenance complete,

~

'3

! performed maintenance - !'

! on MFP 28.

Reactor

!1

?

! power returned to

! 100 percent on 10/6/89. !

t 10

' 8910'5 S

1-B 5

! Reactor power reduced.

! to 75 percent for

! maintenance on CBP 2B

! lobe oil system, then

! on CBP 2A CUNO filters. !.

! 891017 S

1 F

5

! Maintained reduced

! power for core life

~!

! extension. Returned

! to 100 percent reactor !

! power on 10/19/89 to

! meet load demands.

  • E hibit G Instructions

'F: Forced Reason:

' Method:

2 x

5: Scheduled A-Equipment Failure (Explain) 1-Manual

- for Preparation cf Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling

.3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage

( NUREG-061) -

E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

  • Exhibit I-Same Source H-Othe- (Explain) 4 I

e 4

w

,p,.

e. e*

4

.: m e

en..

-- +

w

.r y

DOCKET NO:

50-328 UNIT NAME:

Two

' UNIT SMUTDOWNS AND POWER CEDUCTIONS DATE:

11/3/89 r

REPORT MONTH:. October 1980 '

COMPLETED BY:T J. Hall----

(Page 2 of 2)

TELEPHONE:f6151 843-7528"

! Method of-

! Licensee Cause and Corrective !

! Duration !

! Shutting Down '! Event

! System

! Component !

Action to

! No.

! Date

! Type'.

! (Hours) ! Reason

! Reactor

! Report No.

! Code * -

! Code

  • Prevent Recurrence l!

8' 8

l-

! 12

! 891024 5

25.3*

B 5

! Reduced reactor power - !:

! to 30 percent to

't

.! perform turbine main-

! tenance and test for

! excessive vibration.

! Unit remained at-

! 30 percent, but was

! of fline 25.3* hours.

! Reactor power increased ! -

! ~

! to 75 percent on

! 10//27/89.

! 13

! 891027 S

F 5

! Maintain reduced power !

! of 75 percent for core !

! life extension.

  • Exhibit G-Instructions 8 Method:

2 1-Manual for Preparation of Data

'F: Forced Reason:

S: Scheduled A-Equipment Failure (Explain)

Entry sheets for Licensee 2-Manual Scram B-Maintenance or Test Event Report (LER) File 3-Automatic Scram C-Refueling 4-Continuation of Existing Outage (NUREG-061)

D-Regulatory Restruction E-Operator Training and License Examinatior.

5-Reduction 9-Other F-Administrative

' Exhibit I-Same Source G-Operational Error (Explain)

H-Other (Explain)

" Values corrected from the October 1989 Monthly Operating Report.