T,,. .

4.

..~ .

ENCLOSURE 1 i:

TENNESSEE VALLEY AUTHORITY NUCLEAR POWER GROUP SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT e TO THE NUCLEAR REGULATORY COMMISSION j NOVEMBER 1999 UNIT 1 '

DOCKET NUMBER 50-327  ;

LICENSE NUMBER DPR-77

,, UNIT 2 DOCKET NUMBER.50-328 LICENSE NUMBER DPR-79 8912210176 891215 g i JDR .ADOCK05000p27 ,

< l OPERATIONAL

SUMMARY

NOVEMBER 1989 UNIT 1 Unit I continued to operate efficiently during November. It generated 849,360 MWh (gross) of electrical power with a capacity factor of 99.72 percent. Unit 1 operated at approximately 100 percent power throughout the month.

UNIT 2 Unit 2 generated.490,760 MHh (gross.\ of electrical power during November with a capacity factor of 57.62 percent.- To extend the life of the core, the unit operated at 75 percent power until November 8,1989, when it was taken offline _

for work on the reactor head-vent valves. Unit 2 tied online again on November 15, 1989, at 2047 (EST), and was brought to 85 percent power on November l', 1989. The power level was held at 85 percent to extend the life of the core.

Unit.2 power level was increased to 100 percent on November 29, 1989, to help meet load demands on the grid. The unit was operating at approximately 100 percent at the end of November.

POWER-OPERATED RELIEF VALVES (PORVs) AND SAFETY VALVES

SUMMARY

There were no challenges to PORVs or safety valves in the month of November.

OFFSITE DOSE CALCULATION MANUAL (ODCM) CHANGES There were no changes to the ODCM in the month of November.

l l

l

2

$ t'* 45-M AVERAGE DAILY UNIT. POWER LEVEL s

DOCKET NO. 50-327 ,

UNIT One ,

DATE 12-6-89:  ;

COMPLETED BY- T. J. Ho11omon 7 TELEPHONE (615) 843-7528

- p HONTH NOVEMBER 1989 OAY > AVERAGE DAILY POWER ~ LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1140 17 1135 _ ,

2 1139 18 1141 1

3 .

1140 19 1143

'4 1140 20 1144 5 1139 21 1146 15 1140 22 1147 7 1139- 23 1149 8 1138 24 1151 9 1136 25- 1145 10 1139 26 1131 _ _ _

11 1141 27 1149 12 1139 28 1153 13 1137 29 1152 14 1137 30 1148 15 1136 31 N/A 16 1135

pw; --

P' 37 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-328 Unit Two DATE '12-6-89 7 COMPLETED BY T. J. Hollomon

( TELEPUONE (615) 843-7528 MONTH' NOVEMBER 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

.(MWe-Net) (MWe-Net) 1 859 17 815 2 853 18 953 3 862 -19 963' 4 691 20 965 .

i' 5- 689 21 970 ___

6 865 22 951 7 814 23 963 8 215 24 962

l. 9 - 16 25 964 10 - 19 26 967 11 - 16 27 969 3 i

f 12 - 19 28 969

.i 13 - 19 29 1004' i

14 - 16 30 1102 l

15. 4 31 N/A 16 233 i

C' 9

i ,

X.  !

OPERAllNG DATA REPORT DOCKET NO. 50-327' DATE 12-6-89

, COMPLETED BY T. J. Hollomon TELEPHONE (615) 843-7528 ,

~

'OPERAllNG STATUS -  !

! Notes  ! *

.1.. Unit Name: 'Sequoyah Unit One  !.  !

2. Reporting Period: November 1989  !- 1
3. ' Licensed Thennal Power (Mdt): 3411.0 1  !

4; Nameplate Rating (Gross mle): 1220.6  !  !

5. - Design Electrical Rating (Nat Mde): 1148.0  !' t ,

6.. Maxisman Dependable Capa lty (Gross mie): _1183.0 1  !

7. Maximum Dependable Capacity (Net Mde): 1148.0 t  !
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repart, Give Reasons:

N/A [

t

~ 9. Power Level To Which Restricted, If Any (Net Mde): N/A

10. Reasons For Restrictions, if Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720 8.016 73.801

'12. Number of Hours Reactor Was Critical 720 - 7.%7 37.792

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14;- Hours Generator On-Line 720.0 7.941.7,, _

32.005.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

~ 16.' Gross Thennal Energy Generated (Mai) 2.450.853 26.746,733 104.323.670

17. Gross Electrical Energy Generated (MWH) 849.360 9.187.980 35.323.256
18. Net Electrical Energy Generated (MdH) 820.451 8.875.504 33.796.932
19. Unit Service Factor 100.0 _

99.1 43.4

20. Unit Availability factor- 100.0 99.1 43.4
21. Unit Capacity Factor (Using MDC Net) 99.3  %.4 39.9
22. Unit capacity Factor (Using DER Net) 99.3 96.4 39.9
23. Unit Forced Outage Rate 0.0 0.9 49.8

- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

Unit 1 Cycle 4 refuel outage in March 1990 with a duration of 70 days.

' 25. If Shut Down At End Of Report Period, Estinuted Date of Startup: _H/A

i.

=

g

.e OPERAllNG DATA REPORT' DOCKE1 No. 50-328 DATE 12-6-89 COMPLETED BY T. J. Hollomon TELEPHONE (615) 843-7528 OPERATING STA105.

! Notes  !

1. Unit Name: Seoucyah Unit Two 1 1
2. Reporting Period: Novenber 1999  !  !
3. Licensed Thermal Power (Mdt)
3411.0 1  !

i, ' 4. Naneplate Rating (Gross mie): 1220.6  !  !

5. Desigo Electrical Rating (Net mie): 1140.0 1 1
6. Maximum Dependable capacity (Gross mie): 1183.0 1 1
7. .' Maximum Dependable Capacity (Net mie): 1148.0 1 1
8. -If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level lo blhich Restricted, if Any (Net mie): N/A ,
10. Reasons For Restrictions, if Any: N/A This Month Yr-to-Date cumulative
11. Hours in Reporting Period 720 8.016 65.761
12. Number of Hours Reactor bias Critical 597 5.600 32.786 .
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 i 14.~ Hours Generator On-Line 555.0 5.360.5 _

31.951.8

'15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16; Gross Thermal Energy Generated (mlH) 1.474.580- 16.295.219 98.019.317

17. Gross Electrical Energy Generated (mdH) 490.760 5.513.4 % 33.202.216 18.' Net Electrical Energy Generated (miH) 466.772 5.270.258 31.661.354
19. Unit Service Factor 77.1 66.9 48.6 20.' Unit Availability Factor- 77.1 66.9 48.6

-21. Unit capacity Factor (Using MDC Net) 56.5 57.3 41.9

22. Unit capacity Factor (Using DER Net) 56.5 57.3 41.9 4
23. Unit Forced Outage Rate 0.0 7.1 45.6
24. Shutdowns' Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

An ice condenser outage'is scheduled in March 1990, with duration of 9 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup
N/A

, ,. i .+

,I N'S " '

i

,a n - ;1

-DOCKET NO: M-327 -

- ~

' One  ?"

' UNIT. SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:

. DATE: - 12/6/89 '

'~'

REPORT.. MONTH:heeber 1989 ' . COMPLETED BY:T. 1.~ No11amon .

TELEPHONE:f6151 843-7528 -

j

~

!  !  !  ! .  ! .! Method of  ! Licensee  !-  !- -! .'Cause and Corrective  !-

!  !  !  ! Duration l'  ! Event . . ! System.  ! Component ! . Action.to 11

!.(Hours) ! Reason'3 '.!! Shutting Reactor Down' '! Report No. '! Code *

! No.  ! Date-  ! Type' 8'

'!. Code'  ! . Prevent Recurrence'  !

~

'l -! 1 -No activities for -!' ~,

!  !  !  !  !-  !  !  !  ! '! November 1989. .1- y

!  ! 1- .!

-!  !  !  !  !  !~ l'  !  !  !  !

!  !  !  ! -! '!  !~  ! . .. ! ~  ! ~!-

!  !  !  !  !  !  ! .JJR

!  !  !  ! '!  !  !  !-  ! ~!- ~

,1,

!  !  !  !  !-  ;! l  ! .!  !. -! "

!  !-  !  !  !  !  !  !  !  !  !.~

1  !  !  ! '!.  !  !  !  ! 11

~

'F: rorced 8 Reason: ' Method:

  • Exhibit G 4 istructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling . . 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Contir.uation of Existing Outage (NUREG-061) 5-Operator Training and License Examination 5-Reduction F-Administrative .

9-Other 5

G-Operational Error (Explain) Exhibit I-Same Source.

H-Other (Explain) a O

e n

E e

t .

+ -

, , m.~,,-I w 3 o g ,, ._v.s . - .Mi ec ,_,.-%2,. -s.v., , ,y ~A. . . , . .-...c

.g --.. -

=.

, . _ - . -. - ~, ,. . , .,n,_..m

~

~

- =;

3. -

x p. f)

, 3

. . -DOCKET NO: 328- , au

-UNIT SHUTDOWNS AND POWER ret,UCTIONS UNIT.NAME: Two- A

'DATE: -12/6/89

. . .'~

REPORT MDNTH: November 1989 ' COMPLETED BY:T. J. Hollomon TELEPHONE:i6151 843-7528

  • q

!  !  !  !.  ! Method of '! Licensee  !  !.  !. Cause and Corrective ! '

!  : .  !-  ! Duration ! .! Shutting Down- ! Event  ! System  ! Component ! Action to 'l l

! No. -

Date-  ! Type  ! (Hours) ! Reason'  ! Reactor 8  ! Report No.  ! Code *  ! Code -- ! . Prevent Recurrence. ' ! -

!  !  !  !  !  !  !  !  !  ! 'l

! 13  ! Maintain reduced power

! 891027  ! S  !  ! F  ! 4  !. I  !  !.

!  !  !  !  !  !  !  ! of 75 percent for: core !

.  !  !  !  !  !  !  !  !  ! life extension. .!

' 14 891108  ! 5  ! 164.96 ! B  ! 1  !  !  !  ! Unit taken offline at t -!

!  !  !  !  !  !  !  !  ! 2349 (EST):for work on -!

!  !  !  !  !  !  !  ! . ! reactor head-vent  !

!  !  ! -!'  !  !  !  ! -! valves. Unit tied-  ! -

!  !  !  !  !  !  !  !  ! . ! online at 2047 (EST)  !

!  !  !  !  !  !  !  !  !  ! on 11/15/89. -!

! !5  ! 091117  ! S  !  ! F'  ! 5 1  !  !  ! Reactor power increased !

!  !  !  !  !  !  !  !  !  ! to 85 percent after  !

!  !- '! maintenance outage.

!  !  !  !  !  !  !  !  ! .! Maintained 85 percent  !

!  !  !  !  !  !  !  !  !  ! until 11/29/89, when  !

!  !  !  !  !  !  !  ! power level was  !

!  !  !  !  !  !  !  !  !  ! increased to 100 percent!

!  !  !  !  !  !  !  !  !  !. to meet load demands.  !

!  !  ?  !  !  !  !  !  !  !

'F: Forced

  • Reason: ' Method:
  • Exhibit G Instructions S: Sc5eduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry' sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUAEG-061)

E-Operator Training and License Examination 5-Reduction .

F-Admi n i st ra ti ve 9-Other G-Operational Error (Explain) sExhibit I-Same Source H-Other (Explain) e e

e  %