w m
- +
w DISTRIBUTION NOV 1 ' 1981 Doc.ket NRC PDR l
L PDR LB#4 Reading sam Docket lios. 50-329/330 g
MDuncan OELD Mr. J. W. Cook RS Vice President TIC
'W (jl* fTyA Consumers Power Company
/
1945 West Parnall Road
/9 L
M Jackson, Michigan 49201 RFroelick NOV191984
Dear Mr. Cook:
5 8'ai sa2ua g
.?
Subject:
Transmittal of Preliminary SER Draft Section 18.0 q
Midland Plant, Units 1 and 2
/
Co to Enclosed for your mytew and coment is the preliminary draft section of the flRC staff's Safety Evaluation Report for Midland Plant, Units 1 and 2 which is the lead review responsibility of the Human Factors Engineering Branch. This sections is:
18.0 Human Factors Consideration of the Control Room Design Your attention is directed in particular to any open items contained within th s draft section.
A principal objective of this early transmittal is i
to provide an opportunity to resolve as many open issues as possible through meetings and/or telephone conferences prior to issuance of the draft SER by this Branch on or about December 6,1981. Please contact the staff's Project Manager regarding the need for any meetings and telephone conferences to this end within one week of receipt of this letter. Your coments, including schedules for completion of any further analyses or other work associated with resolution of open items, are requested prior to any scheduled meeting or telephone conferences.
Sincerely, original sigws Sy fpbart L Ted.w Robert L. Tedesco, Assistant Director l
for Licensing Division of Licensing
Enclosure:
As stated cc: See next page rp 8112040272 811112 PDR ADOCK 05000329 E
PDR e,,,- >....outaa......La.....D.@ A..
su.
> P.iad:1bIet.EAdejsam g.3, 3,q,g,,,
.111..h61..
.L10.LQL.
..).Ll..)....l.?.L o:.n y NRC FORM 318 (10-80) NRCM 02c OFFICIAL RECORD COPY usam. mi-swg
MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan 5. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza
- Chicago, Illinois 60603 William J. Scanlon, Esq.
2034 Pauline Boulevard James E. Brunner, Esq.
Ann Arbor, Michigan 48103 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Myron M. Cherry, Esq.
Midland, Michigan 48640 1 IBM Plaza Chicago, Illinois 60611 Ms. Barbara Stamiris 5795 N. River Ms. Mary Sinclair Freeland, Michigan 48623 5711.Summerset Drive Midland, Michigan 48640 Mr. Paul A. Perry, Secretary.
Consumers Power Company Stewart H. Freeman 212 W. Michigan Avenue Assistant Attorney General Jackson, Michigan '49201 State of Michigan Environmental Protection Division Mr. Walt Apley 720 Law Building c/o Mr. Max Clausen Lansing, Michigan 48913 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
Mr. Wendell Marshall SIGMA 1Y Building Route 10 Richland, Washington 99352 Midland, Michigan 48640 Mr. I. Charak, Manager Mr. Steve Gadler NRC Assistance Project 2120 Carter Avenue Argonne National Laboratory St. Paul, Minnesota 55108 9700 South Cass Avenue Argonne, Illinois 60439 Mr. Roger W. Huston Suite 220 Mr. R. B. Borsum 7910 Woodmont Avenue Nuclear Power Generation Division Bethesda, Maryland 20814 Babcoch & Wilcox 7910 Woodmont Avenue,-Suite 220 Bethesda, Maryland 20814-l i
ENCLOSURE OPEN ITEMS 1.
The applicant's preliminary design assessment report of the Midland Unit 2 and common control room has not yet been submitted for NRC review. Submittal is scheduled for January 1982.
2.
The applicant's detailed design assessment report of the Midland Unit 2 and common control room will be needed at least six months prior to issuance of an operating license for Midland Unit 2 in order to complete our human factors review. The applicant's overall control room construction and checkout will be about 90% complete by October 1982 and we, therefore, anticipate receipt of this detailed report about that time.
1 a
e
- ,, f T 1_.
J- _.
5
.. 3 CHAPTER 18.0 HUMAN FACTORS ErlGINEERING BRANCH CONTROL ROOM DESIGN REVIEW MIOLAND UNIT 2 i
18.1 BACKGROUND
As part of the NRC staff actions following the TMI-2 accident (Item I.D.I of NUREG-0660, May 1980 and NUREG-0737, November 1980) we require all licensees and applicants for operating licenses to conduct a detailed control room design review to identify and correct design deficiencies. These reviews should be l.
initiated after issuance of tiUREG-0700, Guidelines for Control Room Design Reviews, and are expected to take approximately one^ year for completion.
Applicants for operating licenses who are unable to ccmplete the detailed-control roca' design review prior to issuance of an operating _ license are required to make a preliminary design assessment of their control rooms to identify significant human factors and instrumentation problems and establish a schedule approved by the NRC for correcting deficiencies. This assessment will be in addition to the detailed control. room design review. NUREG-0700 was published in September, 1981.
-Consumers Power Ccapany (CPCo) is presently conducting a control room design review program which takes into account established human factors review standards and evolving NRC guidelines, including NUREG-0659, the March 1981 i
staff supplement to.the draft control rocm design review guidelines published
.in July 1980. CPCo plans to submit the results of this design review to the NRC in January, 1982. We will initiate our human factors review of the Midland
. Unit.2 control room when this report has been received.
5
~
~,
1 f
18.2 CCNCLUSIONS CPCo has informed us that the Midland Unit 2 control room report to be submitted in January 1982 will be preliminary in nature. Some elements of the detailed 1
control room design review described in NUREG-0700 will not have been initiated, the status of centrol room construction will not permit review of scme control room design features, and design soluticns for some identified design discrepancies will not have been selected. Submittal of a report at this time will permit an early assessment of their overall approach to the control roca design review process and should contribute to the quality of their subsequent detailed control room design review report. Our review and evaluation of this preliminary report may include an on-site visit to the Midland control roca by members of the NRC's Human Factors Engineering Branch and their consultants.
We expect that CPCo will continue their detailed control rcom design review as described in NUREG-0700, and will submit a detailed control room design review j
report for Midland Unit 2 on a schedule consistent with control room construction and their planned fuel-loading date. He expect receipt of the report at least six months prior to issuance of an operating license for (tidiand Unit 2.
The results of our evaluation of the detailed control room design-review report will be reported in a later supplement to the SER prior-to issuance of an
[
operating license.
L l
REFERENCES
(
1.
NUREG-0660, Volume.1, May 1980, NRC Action Plan Developed as a Result of the TMI-2 Accident.
2.
NUREG-0737, November 1980, Clarification of:the TMI Action Plan Requirements.
l 3.
NUREG-0700, September 1981, Guidelines for Control-Rocm Design. Reviews.
l a.
Censumers ?ower-Comoany letter of June A, 1981, James N, Ccok to Harold R.
Centon, Response,to Request for Centrol Rocm Ccnstructicn Schedules..
i
,,. -