Forwards IE Insp Rept 50-341/81-08 on 810723-26 & Notice of Violation
ML20011A290
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/05/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20011A291 List:
References
NUDOCS 8110080457
Download: ML20011A290 (2)


See also: IR 05000341/1981008

Text

..

..

.

OCT 5

1981

e

' Docket No. 50-341

~The Detroit Edison Company

ATTN:

Mr. Donald A. Wells

Manager, Quality Assurance

2000 Second Avenue

Detroit, MI- 48226

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

R, N. Sutphin,'J. F. Schapker and P. M. Byron of this office on July 23-26,

>

1981, of activities at Enrico Fermi Nuclear Power Plant, Unit 2, author-

ized by NRC Construction Permit No. CPPR-87 and to the discussion of our

findings with Mr. T. Alessi a+ the conclusion of the iu q -ction.

The enclosed copy of our inspection report identifies areas examined during

the inspection. ' Within there areas, the inspection consisted of a selective

examination of procedures and representative-records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

,

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFP 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

l

-

$

/

\\

811008045 811070

PDR ADOCK 05000341

(G

POR

h

.

w

.

..

Detroit Edison Company

-2-

00T 5

1981

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within.the specifi.ed periods noted above, a copy of this letter,

the enclosures, and your response to thi- letter will be placed in the

Public Document Room.

We'will gladly discuss any questions you have concerning this inspection.

Sincerely,

"o-toinal Signed by C.E. Nerclius"

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-341/81-08

cc w/encls:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Eugene 3. Thomas, Jr.,

Attorney

RI

RIII

R

RIII

RIII

RIII

RIII

.

,

-

Q

l

(.g .tW

ES tphin/jp

/,.Ech5pkerkron

nielson

r

i iams

Norelius

I /22/81