ML20011A290
| ML20011A290 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/05/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20011A291 | List: |
| References | |
| NUDOCS 8110080457 | |
| Download: ML20011A290 (2) | |
See also: IR 05000341/1981008
Text
..
..
.
OCT 5
1981
e
' Docket No. 50-341
~The Detroit Edison Company
ATTN:
Mr. Donald A. Wells
Manager, Quality Assurance
2000 Second Avenue
Detroit, MI- 48226
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R, N. Sutphin,'J. F. Schapker and P. M. Byron of this office on July 23-26,
>
1981, of activities at Enrico Fermi Nuclear Power Plant, Unit 2, author-
ized by NRC Construction Permit No. CPPR-87 and to the discussion of our
findings with Mr. T. Alessi a+ the conclusion of the iu q -ction.
The enclosed copy of our inspection report identifies areas examined during
the inspection. ' Within there areas, the inspection consisted of a selective
examination of procedures and representative-records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
,
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFP 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
l
-
$
/
\\
811008045 811070
PDR ADOCK 05000341
(G
POR
h
.
w
.
..
Detroit Edison Company
-2-
00T 5
1981
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within.the specifi.ed periods noted above, a copy of this letter,
the enclosures, and your response to thi- letter will be placed in the
Public Document Room.
We'will gladly discuss any questions you have concerning this inspection.
Sincerely,
"o-toinal Signed by C.E. Nerclius"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-341/81-08
cc w/encls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Eugene 3. Thomas, Jr.,
Attorney
RI
RIII
R
RIII
RIII
RIII
RIII
.
,
-
Q
l
(.g .tW
ES tphin/jp
/,.Ech5pkerkron
nielson
r
i iams
Norelius
I /22/81
E
9
f
b
f tj1; "}
i
.
J