Notice of Violation from Insp on 810723-26
ML20011A293
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/05/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20011A291 List:
References
50-341-81-08, 50-341-81-8, NUDOCS 8110080460
Download: ML20011A293 (2)


Text

m "l

W'-

~

u

.,s Appendix A--

c:

s

- NOTICE OF VIOLATION-DetroitiEdison-Company?

Docket No. 50-341 (As a. result of the inspection _ conducted en June 23-26, 1981, and~in

,f f accordance withL the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980); the following' violation was identified:

10 CFR;50,-Appendix B,l Criterion-II, states'in part that the Quality-Assurance-Programishall be carried outthrough out plant life, in accordance with policies,' procedures, or instructions; The 'Enrico. Fermi Unit-2 Quality Assurance Manual, Section 1.0.1 states in part that it)is Edison's Policy to implement a Quality Assurance Program, 'either directly or through.its vendors and contractors to meet the applicable requirements of. Appendix B, of-10 CFR 50.

'The Enrico Fermi Unit 2 Quality Assurance Manual further states in Section:1.3.3 " Edison's project procedures manual includes the detailed

. procedures for the performance of' quality-related activities by the PMO participating contractors and Edison departments, other than quality assurance."

Additionally, Section 1.3.6.4 of the Quality Assurance Manual states

'"Each organization that implements a QA' program is required to have procedures for the preparation, review, approval and control of QA program documents and to'similarly control changes to such documents."

t Contrary. to the above, the project procedures manual has not been main-tained up to date with current forms and practices in that Exhibit B.3-1 of Section 3, Configuration Control, has obsolete sections on the approvals required and the flow pattern for submittal and disposition of: Record

'(as-built), (DCR) Design Change Request (s), (DCN) Design Change Notice (s),

and (FMR) Field Mo'dification Request forms compared' to the A402.1 (12-80) form currently in-use.

'This is a Severity Level V violation (Supplement II).

I e

8110080460 811'065 PDR ADOCK OSoo034r G-POR

c:

o-

s.

' Appendix'A 2--

p Pursuant to the provisions of 10 CFR 2.201, on are required to submit to this office within thirty days of the date or this Notice a written state-ment or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the

- Atomic Energy Act of 1954, as amended, this response shall be ubmitted m

under cath or affirmation. Consideration may be given to extending your

' response time for good ccuse shown.

d' Original Signed by C.E. Morellus" Dated 007 5 1981-C. E. Norelius, Director Division of Engineering and Technical Inspe mion l