Text
.
i
,
.
.
Q-
,
pp
,
SEP 2 81981
};
Docket No. 50-358
Cincinnati Gas and Electric
Company.
ATTN:
Mr. Earl A. Borgmann
I
Senior Vice President
Engineering Services and
Electric Production
E
'139 East 4th Street
'
Cincinnati, OH 45201
Gentlemen:
!
-This refers to the routine safety inspection conducted by Mr. R. D. Schulz
j
of this office on September 9 and 10,1981, of activities at Wm. H. Zimmer
'
Nuclear Power Station authorized by NRC Construction Permit No. CPPR-88
and to the discussion of our findings with Mr. J. R. Schott at the con-
l
clusion of the inspection.
I
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
1
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
{
j
,
-ggol
s
I
(
)l
f
OO90434 gTo g '
'
,
ia
ADOCM 05000358
-
> -
- . . . .. *
_ _ _ _ _ _ _ _ _ _ _ _ _
_
. _ _ _ _ _ _ _ _ _ _ _ _ _ _
____a
..
__
-
- - -
--.
..
. . . .
.
_ _ . . . _ _ _ _
.. .
. . . . ..
.-
.. - - - - - - - - - . - - - - - - - -
.
.
,
s
V
~ 0incinnati Gas and Electric
-
2.-
SEP 28 $31
'I
'
Company
- mation. Section 2.790(b)(1) requires that any such application must be
accompanied.by an affidavit executed by ti'.e owner of the information which
. identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public discl:sure. This section further
requires the statement to address with specificity the considerations listed
{
p
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
l
1
incorporated as far as possible into a separate part of the affidavit.
If
!
[
we do not hear from you in this regard within the specified periods noted
1
above, a copy of this letter and the enclosed inspection report will be
l
placed in the Public Document Room.
ff
We will gladly discuss any questions you have concerning this inspection.
l
l
Sincerely,
i
1
\\
l
" original signed by C.E .HotGM
C. E. Norelius, Director
p
Division of Engineering and
(
Technical Inspection
l
Enclosure: IE Inspection
g
,
i
Report No. 50-358/81-26
l
,
l
. cc w/ enc 1:
J. R. Schott,. Plant
Superintendent
l
DMB/ Document Control Desk (RIDS)
,
f
Resident Inspector, RIII
l
Harold W. Kohn, Power
l
,
l
Siting Commission
l
Citizens Against a Radioactive
f
Environment
Helen W~. Evans, State of Ohio
- .
i
!
l
!
!,
i
i
!
,
i
~RIIII
RII
RIII
RIII
RIII
'
[.
Sc
z/jp
/sWil
J
upp
9/18/81
M' "F
f
qld
!-;
= -
__
.
.-
.--
--
-
.
.