Notice of Violation from Insp on 810801-31
ML20010J646
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/14/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20010J643 List:
References
50-322-81-14, NUDOCS 8110060309
Download: ML20010J646 (3)


Text

.

~.

i I

4_

q--

4 j

~

APPENDIX A NOTICE OF VIOLATION Long Island Lighting Company Docket No. 50-322 Shoreham Nuclear Power Station License No. CPPR-95 j

As a result of the inspection conducted o August 1 - 31, 1981, and in accordance.

with the' Interim Enforcement Policy, 45 FR 65754 (October 7,1980), the following J

violation was identified:

4 10 CFR 50,. Appendix B, Critarion V states, in part, that:

" Activities Effecting

'uality :; hall be prescribed by documented instructions.... and shall be accomplished 4

in accordance with the instructions...".

FSAR Section 17.2.5 states, in part, that: - The LILCO QA Program established 4

provisions for activities affecting the quality of safety - related structures, i

syste%, and components... to be accomplished 'and controlled in accordance with instructions...".

The LILC0 Operational Quality' Assurance Manual Sectior, 5.3.1 ' states, in.part,ithat:

... activities will be accomplished in accordance with -... documented instructions.

~

L procedurerand drawings."

1.

LILC0 Startup Hanual, Section 4.4.2 states, in part, that: "If leads must be -

lifted... the change will be documented in the Lifted Lead 'and ' Jumper Tag-Log".

2.. LILC0 Startup Manual. Section 4.4.2 also states, in part, that: "All tags must have the authort:ation block signed by the Test Engineer".

3.

LILCO,Startup Manual,- Section 4.3.2.3' states, in part, that: "No one.may operate devices with RED tags attached.

~

4.

LILCO Startup Manual, Section 4.3.4.2, " Procedure for using BLUE tags", states in part: " Remove YELLOW tags if requested as BLUE tags are placed,...

(if not, BLUE tags may not be placed)."

5.

Procedure S.P. 12.035.01, Rev. 2, dated 7/11/79. " Control of Lifted Leads a d Jumpers", Step 8.2 states, in part, that:. "The permit... shall be filled ut with the followed infomation:... Expected duration of the temporary-condition".

6.' Procedure S.P. 12.035.01, Rev. 2, dated 7/11/79, Steps 8.7.2 and 8.7.3 regnire 1

that the permit and jumper log be updated after a jumper is removed.

7.

Procedure S.P; 12,006.02, Rev.10, " Station Procedwes - Control and Distribution",

Steps 8.2.1 and 8.2.3 requires that a. master cop.

, controlled station procedures 3

be maintained in the Mair Control Roon.

9 0110060309 810914 gDRADOCK 05000322 PDR

^

~

l y

+-

Appendix A 2

Contrary to the above activities affecting quality were not accomplished in accordance with instructions in that on August 5/6,1981:

1.

'The inspector identified the following leads in Panel 601 lifted with no documentation in the Log or Tags hung:

l Leads to pressure indicator E51-PI 001; Two leads from cable E11 BBC 640;.

l Two leads from cable Ell BBC 641; and

-Lead CC 75 to Terminal Board HH.

I 2.

The authorization block was not signed on tags #1528,1529 and 1838.

{

3.

Two fuses were found installed in the Remote Shutdown Panel ~ enn though RED i,

gags #30224 and 30225 specified that'the fuses beipulled.

I startup jurisdicational tags were h;ng concurrently with YELLOW construc-l 4.

BLUE, jurisdicatf." I tags on a number of components of the Reactor Building tion closed Loop Cooling Water System (P42).

1 5.

None of the four active jumper /lif ted lead permits had the expected duration i

recorded.

6.

The jh.npers for Permit #81-641 had been removed but the permit and jumper log had not been updated._

l

- 7.

The Maine Control Room set of controlled station procedures was not maintained current in that it contained Rev. I vice Rev. 2 of SP 12.035.01, " Control of Lifted Leads and Jumpers".

This is a Severity Level IV Violation (Supplement II.D of the Interim Enforcement Policy).

Pursuant to the provisions of 10 CFR 2.201, Long Island Lighting Company is hereby required to submit to this office within thirty days of the date of this Notice, a writidn statement or explanation in reply, including:- (1) the corrective steps-which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and-(~,3 the date when full compliance will

~

be achieved. Under the authority of Section 182'of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affimation. Where good cause is -shown, consideration will be given to extending your response time. -

l

,7--

n--v--

,.,---_,,-,e,.--s---,

,,-4,-e-y--.

k

Appendix A 3

The responses directed by this Nstice are not subject to the clearance procedures of the Office of Managcment and Budget as required by the Paperwork Reduction Act of 1930, PL 96-511.

i 4

SEP 141881 S/

trA4b Dated

~

Eldon J. Brunner,' Cnief. Projects Branch fl. Division of Resident and Project Inspection l