ML20010J383

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/81-29 on 810817-21.No Noncompliance Noted
ML20010J383
Person / Time
Site: San Onofre 
Issue date: 09/17/1981
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20010J384 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8109300401
Download: ML20010J383 (2)


See also: IR 05000206/1981029

Text

I

1

'

.

%

>

t

di

2-

i

s

o

SEP 171981

.

Docket No. 50-206

=

4

Southern California Edison Comany

j[ . /T,f

g

fj & P

P. O. Box 800

f A

f

.8 Egg 8

2244 Walnut Grove Avenue

Rosemead, California 91770

/gg

g)

s

--

'

Attention: Dr. L. T. Papay, Vice President

b

Advanced Engineering

-

'

%

9

Gentlemen:

U'

Subject: NRC Inspection - San Onofre I

This refers b the inspection conducted by Mr. A. Chaffee of this office

on August 17-21, 1981 of activities authorized by NRC License No. DPR-13,

and to the discussion of our findings held by Mr. A. Chaffee with Messrs.

Haynes, Curran, Ray and other members of your staff at the conclusion of

1

the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consistd of selective examinations

'

of procedures and representative records, interviews with pemonnel, and

observations by the inspector.

,

i

No items of nonccmpliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter a written application to this office to withhold such

~

information.

If your receipt of this letter has been delayed such that

-

less than seven (7) days are available for your review, please notify this

M

s

i

office promptly so that a new due date may be established. Consistent

fp

with section 2.790(b)(1), any such application must be accompanied by an

/

affidavit executed by the owner of the information which identifies the

$if

f

document or part sought to be withheld, and which contains a full statement

,

of the basis on which it is clained that the information should be withheld

'

i

i

from public disclosure. This section further requires the statement to

,

address with specificity the considerations listed in 10 CFR 2.790(b)(4).

b.t.. .. k ........

"'c'>

........,..........1

.. .... . .. ......

...... .. .......

......... .........

....................

... ...

'

ZWETZIG

STERNBERG

-

suo m e)

CH M EE

. . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

~ e 10930 0 4 01 8109 I ~/ . . . . . .

..... ...............

....... ............

...........

..

..

om)

9/ 6/81

9/(/81

9/t1/81

PDR ADOCK 0500020

. .. ..... g

. ........

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . .

.. .. ... ... . ..

...... ....... ....

.....

4 - =-329 824 ;

.--.-.- - -

-O F. F ICI A L R ECO.R D CO. P..Y

- - - _ - _ . - . . . .

.

.

. -

' NRC FORM 318 (tO/80l NRCM O240

-

-

,

__

_ _ - _ _

. _ _ _ _ _

_

_

1

Southern California Edison Company

-2-

SEP 171931

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed

in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

5

D. f., Sternberg

Reactor Operations Project Branch

Enclosure:

IE Inspection Report

flo. 50-206/81-29

cc w/o enclosure:

R. Dietch, Vice President, fluclear Engr. & Operations.

H. Ray, (San Clemente)

bec:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

RV PDR

State of CA (Hahn/ Johnson)

RHE (w/o enc)

Resident Inspector

\\

.

s

N _.

<

N

,I

\\

.

.

.

_ . _ _ _ _ _ _ _ _

- . _ . _ _ _ .